VARIOUS DPWH PROPOSED PROJECTS
(DETAILED ENGINEERING DESIGN AND/OR SPECIAL STUDIES)
STANDARD FOUR-STOREY
SCHOOL BUILDING
(4 & 8 - CLASSROOMS)
JOINT VENTURE OF
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
PROJECT MANAGEMENT OFFICE - BUREAU OF DESIGN
MANILA, PHILIPPINES
VARIOUS DPWH PROPOSED PROJECTS
(DETAILED ENGINEERING DESIGN AND/OR SPECIAL STUDIES)
STANDARD FOUR-STOREY
SCHOOL BUILDING
(4 & 8 - CLASSROOMS)
REVIEWED:
RECOMMENDING APPROVAL:
APPROVED :
CONCURRED :
MARIANO C. DEL CASTILLO
GILBERTO S. REYES
RAUL C. ASIS
ROGELIO L. SINGSON
ARMIN A. LUISTRO
OIC, BUILDINGS DIVISION, BOD
DIRECTOR IV, BOD
UNDERSECRETARY
SECRETARY
SECRETARY
DEPARTMENT OF EDUCATION
BILL OF QUANTITIES
EIGHT-CLASSROOMS
A.
I.
Mobilization / Demobilization
II.
Temporary Facilities
III.
Safety and Health
IV.
Earthworks
V.
Termite Control Works
VI.
Concrete Works
VII.
Masonry Works
VIII.
Fabricated Materials and Hardwares
(SEE COVER SHEET)
QUANTITY ENGINEER
JOVEN T. SANTOS
DOMICIANO B. LUSICA
COST ENGINEER
PROJECT MANAGER
OIC, BUILDINGS DIVISION
(SEE COVER SHEET)
(SEE COVER SHEET)
GILBERTO S. REYES
RAUL C. ASIS
ROGELIO L. SINGSON
DIRECTOR IV, BOD
UNDERSECRETARY
SECRETARY
VARIOUS DPWH
PROPOSED PROJECTS
STANDARD FOUR-STOREY
SCHOOL BUILDING
( 8-CLASSROOMS )
BOD
BILL OF QUANTITIES
G-1
1
38
BILL OF QUANTITIES
XIII.
Electrical Works
XIV.
Plumbing / Sanitary Works
IX. Finishing Works
X. Carpentry Works
XI. Roof and Framing Works
XII. Painting Works
(SEE COVER SHEET)
QUANTITY ENGINEER
JOVEN T. SANTOS
DOMICIANO B. LUSICA
COST ENGINEER
PROJECT MANAGER
OIC, BUILDINGS DIVISION
(SEE COVER SHEET)
(SEE COVER SHEET)
GILBERTO S. REYES
RAUL C. ASIS
ROGELIO L. SINGSON
DIRECTOR IV, BOD
UNDERSECRETARY
SECRETARY
VARIOUS DPWH
PROPOSED PROJECTS
STANDARD FOUR-STOREY
SCHOOL BUILDING
( 8-CLASSROOMS )
BOD
BILL OF QUANTITIES
G-2
2
38
BILL OF QUANTITIES
FOUR-CLASSROOMS
A.
I.
Mobilization / Demobilization
II.
Temporary Facilities
III.
Safety and Health
IV.
Earthworks
V.
Termite Control Works
VI.
Concrete Works
VII.
Masonry Works
VIII.
Fabricated Materials and Hardwares
(SEE COVER SHEET)
QUANTITY ENGINEER
JOVEN T. SANTOS
DOMICIANO B. LUSICA
COST ENGINEER
PROJECT MANAGER
OIC, BUILDINGS DIVISION
(SEE COVER SHEET)
(SEE COVER SHEET)
GILBERTO S. REYES
RAUL C. ASIS
ROGELIO L. SINGSON
DIRECTOR IV, BOD
UNDERSECRETARY
SECRETARY
VARIOUS DPWH
PROPOSED PROJECTS
STANDARD FOUR-STOREY
SCHOOL BUILDING
( 4-CLASSROOMS )
BOD
BILL OF QUANTITIES
G-3
3
38
BILL OF QUANTITIES
XIII.
Electrical Works
XIV.
Plumbing / Sanitary Works
IX. Finishing Works
X. Carpentry Works
XI. Roof and Framing Works
XII. Painting Works
(SEE COVER SHEET)
QUANTITY ENGINEER
JOVEN T. SANTOS
DOMICIANO B. LUSICA
COST ENGINEER
PROJECT MANAGER
OIC, BUILDINGS DIVISION
(SEE COVER SHEET)
(SEE COVER SHEET)
GILBERTO S. REYES
RAUL C. ASIS
ROGELIO L. SINGSON
DIRECTOR IV, BOD
UNDERSECRETARY
SECRETARY
VARIOUS DPWH
PROPOSED PROJECTS
STANDARD FOUR-STOREY
SCHOOL BUILDING
( 4-CLASSROOMS )
BOD
BILL OF QUANTITIES
G-4
4
38
TABLE OF CONTENTS
GENERAL
G-1
BILL OF QUANTITIES
G-2
BILL OF QUANTITIES
G-3
BILL OF QUANTITIES
G-4
BILL OF QUANTITIES
STRUCTURAL
ARCHITECTURAL
PLUMBING
A-1
TABLE OF CONTENTS
S-1
GENERAL NOTES
A-2
KEY PLAN
S-2
GENERAL NOTES
A-3
GROUND FLOOR, SECOND & THIRD FLOOR, FOURTH FLOOR,
FRONT ELEVATION, AND SCHEDULE OF FINISHES
S-3
FOUNDATION PLAN, TYPICAL 2nd & 3RD FLOOR
FRAMING PLAN, 4th FLOOR FRAMING PLAN
A-4
REAR ELEVATION, RIGHT ELEVATION, LEFT ELEVATION,
LONGITUDINAL SECTION & CROSS SECTION
S-4
A-5
GROUND FLOOR REFLECTED CEILING PLAN, SECOND &
THIRD FLOOR REFLECTED CEILING PLAN, FOURTH FLOOR
REFLECTED CEILING PLAN & ROOF PLAN
A-6
SCHEDULE OF DOORS & WINDOWS, DETAIL PLAN, ELEVATION
& RAMP DETAILS
A-7
SECTION DETAIL OF EAVES, SPOT DETAIL CORNER CEILING,
CONCRETE SUNBREAKER DETAIL, PERSPECTIVE, SECTION &
SPOT DETAIL OF CEILING, PLAN & SECTION OF VENTILATION
A-8
STAIR DETAILS
A-9
FIRE ESCAPE DETAILS
A - 10
A - 11
S-5
COLUMN SCHEDULE, SCHEDULE OF FOOTING,
SCHEDULE FOOTING BEAMS, TYPICAL FOOTING
DETAIL, ELEVATION OF COLUMN, & DETAIL OF WALL
FOOTINGS
PLAN FOOTING F-3, ELEVATION FOOTING F-3,
PLAN FOOTING CF-1 & TYPICAL ELEVATION OF
MICRO-PILE
S-6
SCHEDULE MAIN BEAMS, SCHEDULE OF SECONDARY
BEAMS, SCHEDULE OF SLABS, TYPICAL SLAB
ELEVATION, TYPICAL BEAM ELEVATION,
TYPE OF STIRRUPS
S-7
DETAIL OF STAIR, RAMP DETAIL, DETAIL OF DC-1,
DETAIL OF STAIR ON GRADE &
DETAIL OF WALL ON FTB
TOILET DETAILS
S-8
ROOF FRAMING PLAN
BLACKBOARD DETAIL
S-9
ELEVATION OF END WALL FRAME, DETAIL SECTION
OF PC-1, CONNECTION OF PURLINS TO RG-4,
CONCRETE SUN BREAKER DETAILS
S - 10
TRUSS DETAILS AND CONNECTION DETAILS
S - 11
BASE PLATE DETAILS, ANCHOR BOLT DETAIL,
ROOF PANEL SIDE LAP DETAIL,
J-BOLT TO PURLIN CONNECTION DETAIL,
J-BOLT SPACING, PURLIN CONNECTION DETAIL,
SECTION, TRUSS DETAIL AT GUTTER END
S - 12
FIRE ESCAPE ELEVATION
S - 13
FIRE ESCAPE DETAILS
(SEE COVER SHEET)
NOTE :
OIC, BUILDINGS DIVISION
ELECTRICAL
P-1
GROUND FLOOR, TYPICAL SECOND, THIRD
& FOURTH FLOOR PLUMBING LAYOUT,
GROUNDFLOOR, TYPICAL SECOND, THIRD
& FOURTH FLOOR WATER LINE LAYOUT
EE - 1
GENERAL NOTES, LEGEND, FLUORESCENT LIGHT
FIXTURE MOUNTING DETAIL, LOAD SCHEDULE,
PANEL BOARD DIAGRAM AND ELECTRICAL RISER
DIAGRAM ( 4-CL )
P-2
ISOMETRIC DRAINAGE LINE LAYOUT
ROOF DRAINAGE LAYOUT,
DETAIL SECTION OF DRAIN PIPE
AND SPOT DETAIL
EE - 2
POWER LAYOUT ( 4-CL )
EE - 3
LIGHTING LAYOUT ( 4-CL )
EE - 1
GENERAL NOTES, LEGEND, FLUORESCENT LIGHT
FIXTURE MOUNTING DETAIL, LOAD SCHEDULE,
PANEL BOARD DIAGRAM AND ELECTRICAL RISER
DIAGRAM ( 8-CL )
EE - 2
POWER LAYOUT ( 8-CL )
EE - 3
LIGHTING LAYOUT ( 8-CL )
P-3
ISOMETRIC WATER LINE LAYOUT AND
SEWER LINE LAYOUT
P-4
PLAN OF SEPTIC TANK, LONGITUDINAL
SECTION, CROSS SECTION DETAIL,
MANHOLE COVER DETAIL,
CATCH BASIN DETAIL, LEGEND AND
PLUMBING NOTES
(SEE COVER SHEET)
(SEE COVER SHEET)
GILBERTO S. REYES
RAUL C. ASIS
ROGELIO L. SINGSON
DIRECTOR IV, BOD
UNDERSECRETARY
SECRETARY
VARIOUS DPWH
PROPOSED PROJECTS
STANDARD FOUR-STOREY
SCHOOL BUILDING
( 8-CLASSROOMS )
BOD
TABLE OF CONTENTS
A-1
5
38
( 4-CLASSROOMS )
FOURTH FLOOR PLAN
( 4-CLASSROOMS )
GROUND FLOOR PLAN
( 4-CLASSROOMS )
K E Y
SECOND & THIRD FLOOR PLAN
P L A N
(SEE COVER SHEET)
NOTE :
OIC, BUILDINGS DIVISION
(SEE COVER SHEET)
(SEE COVER SHEET)
GILBERTO S. REYES
RAUL C. ASIS
ROGELIO L. SINGSON
DIRECTOR IV, BOD
UNDERSECRETARY
SECRETARY
VARIOUS DPWH
PROPOSED PROJECTS
STANDARD FOUR-STOREY
SCHOOL BUILDING
( 4-CLASSROOMS )
BOD
KEY PLAN
A-2
6
38
SECOND & THIRD FLOOR
FRONT ELEVATION
SCHEDULE OF FINISH
GROUND FLOOR
FOURTH FLOOR
(SEE COVER SHEET)
NOTE :
OIC, BUILDINGS DIVISION
(SEE COVER SHEET)
(SEE COVER SHEET)
GILBERTO S. REYES
RAUL C. ASIS
ROGELIO L. SINGSON
DIRECTOR IV, BOD
UNDERSECRETARY
SECRETARY
VARIOUS DPWH
PROPOSED PROJECTS
STANDARD FOUR-STOREY
SCHOOL BUILDING
( 8-CLASSROOM )
GROUND FLOOR, SECOND &
THIRD FLOOR, FOURTH FLOOR,
FRONT ELEVATION, AND
SCHEDULE OF FINISHES
BOD
A-3
7
38
RIGHT ELEVATION
LEFT ELEVATION
CROSS SECTION
REAR ELEVATION
LONGITUDINAL SECTION
(SEE COVER SHEET)
NOTE :
OIC, BUILDINGS DIVISION
(SEE COVER SHEET)
(SEE COVER SHEET)
GILBERTO S. REYES
RAUL C. ASIS
ROGELIO L. SINGSON
DIRECTOR IV, BOD
UNDERSECRETARY
SECRETARY
VARIOUS DPWH
PROPOSED PROJECTS
STANDARD FOUR-STOREY
SCHOOL BUILDING
( 8-CLASSROOM )
REAR ELEVATION, RIGHT ELEVATION,
LEFT ELEVATION, LONGITUDINAL
SECTION & CROSS SECTION
BOD
A-4
8
38
Download
Study collections