Chenequa Public Works Building 04730-1 SECTION 04730 SIMULATED STONE PART 1 GENERAL 1.01 SECTION INCLUDES A. Simulated stone veneer. B. Mortar. C. Metal lath and accessories. 1.02 RELATED SECTIONS A. Section 06100- Rough Carpentry: Wall framing and sheathing. B. Section 07920- Caulking and Sealants: Backing rod and sealant at control and expansion joints. 1.03 SUBMITTALS A. See Section 01300- Administrative Requirements, for submittal procedures. B. Product Data: Provide data for simulated stone, lath, mortar, and accessories. C. Shop Drawings: Include plans, elevations, anchoring details, and attachments to other Work. 1.04 DELIVERY, STORAGE, AND HANDLING A. Store materials under cover, in dry place, and in manner to prevent damage or intrusion of foreign matter. 1.05 ENVIRONMENTAL REQUIREMENTS A. Maintain materials and surrounding air temperature to minimum 40 degrees F prior to, during, and 48 hours after completion of simulated stone veneer work. Protect materials from rain and moisture during same period of time. B. Allow no construction activity on opposite side of wall during installation and for 48 hours after completion of work. PART 2 PRODUCTS 2.01 MATERIALS SIMULATED STONE THE PROJECT MANUAL MASTER SPECIFICATION DOCUMENTS AS INSTRUMENTS OF SERVICE ARE GIVEN IN CONFIDENCE AND REMAIN THE PROPERTY OF CHOICE HOTELS INTERNATIONAL. THE USE OF THESE DOCUMENTS FOR CONSTRUCTION IS STRICTLY PROHIBITED. THESE SPECIFICATIONS ARE NOT CODE SPECIFIC AND IT IS THE RESPONSIBIITY OF THE PROJECT ARCHITECT/ENGINEER TO DESIGN FOR ALL APPLICABLE CODES, ORDINANCES, AND LAWS AS WELL AS THE CURRENT ISSUE OF THE DESIGN GUIDE DOCUMENTS. Chenequa Public Works Building 04730-2 A. Simulated Stone Veneer: As manufactured by Boulder Creek Stone Products, a division of D.A.Distribution, Inc 1. Pattern: S5060-8 2. Color: Nema 3. Type: Fast Stak 4. Size. Varies B. Portland Cement: ASTM C 150, Type I or II. C. Hydrated Lime: ASTM C 270. D. Mortar Pigments: Natural and synthetic iron oxides and chromium oxides, compounded for use in mortar mixes. Use only pigments with a record of satisfactory performance in masonry mortar. 1. Product: SGS Mortar Colors; Solomon Grind-Chem Services, Inc. E. Metal Lath: Minimum 18 gage, 2.5 lb. flat diamond mesh, galvanized. F. Water: Potable. G. Stone Adhesive: 2-part polyester or epoxy-resin stone adhesive with a 15- to 45minute cure at 70 deg F, recommended by adhesive manufacturer for type of installation indicated, matching simulated stone. 2.02 MORTAR MIXES A. Mixing: Thoroughly mix mortar ingredients in quantities needed for immediate use in accordance with ASTM C 270, Type N. Do not use antifreeze compounds to lower the freezing point of mortar. PART 3 EXECUTION 3.01 PREPARATION A. Attach metal lath to framing with large headed hot dipped galvanized nails or screws, spaced 6-inch on center vertically and 16 inches on center horizontally, that penetrate sheathing l-inch minimum. Wrap mesh continuously around comers not less than 16 inches. 3.02 SIMULATED STONE VENEER INSTALLATION A. Apply 1/2-inch to 3/4-inch of mortar to lath, covering not more than 10 sq. ft. at a time. SIMULATED STONE THE PROJECT MANUAL MASTER SPECIFICATION DOCUMENTS AS INSTRUMENTS OF SERVICE ARE GIVEN IN CONFIDENCE AND REMAIN THE PROPERTY OF CHOICE HOTELS INTERNATIONAL. THE USE OF THESE DOCUMENTS FOR CONSTRUCTION IS STRICTLY PROHIBITED. THESE SPECIFICATIONS ARE NOT CODE SPECIFIC AND IT IS THE RESPONSIBIITY OF THE PROJECT ARCHITECT/ENGINEER TO DESIGN FOR ALL APPLICABLE CODES, ORDINANCES, AND LAWS AS WELL AS THE CURRENT ISSUE OF THE DESIGN GUIDE DOCUMENTS. Chenequa Public Works Building 04730-3 Lightly butter back of simulated stone to ensure 100 percent bond. Press units firmly into position into soft mortar bed, causing mortar to extrude slightly around edges of units. B. Place units with uniform mortar joints, not more than 1/2-inch in width. C. Perform necessary cutting using tools recommended by simulated stone manufacturer to provide uniform edges, taking care to prevent breaking unit edges or corners. C. Remove excess mortar to prevent smearing on face of simulated stone. Tool joints, compacting mortar and completely sealing around edges of simulated stone. Use grout bag to fill in joints requiring additional mortar. D. Clean and finish joints in accordance with manufacturer's instructions. 3.04 CLEANING A. In-Progress Cleaning: Clean simulated stone veneer as work progresses by dry brushing to remove mortar fins and smears before tooling joints. B. Final Cleaning: After mortar is thoroughly set and cured, clean surface of simulated stone veneer with a bristle brush using a strong solution of granulated soap or detergent and water. Do not use wire brush. Rinse thoroughly after cleaning. END OF SECTION SIMULATED STONE THE PROJECT MANUAL MASTER SPECIFICATION DOCUMENTS AS INSTRUMENTS OF SERVICE ARE GIVEN IN CONFIDENCE AND REMAIN THE PROPERTY OF CHOICE HOTELS INTERNATIONAL. THE USE OF THESE DOCUMENTS FOR CONSTRUCTION IS STRICTLY PROHIBITED. THESE SPECIFICATIONS ARE NOT CODE SPECIFIC AND IT IS THE RESPONSIBIITY OF THE PROJECT ARCHITECT/ENGINEER TO DESIGN FOR ALL APPLICABLE CODES, ORDINANCES, AND LAWS AS WELL AS THE CURRENT ISSUE OF THE DESIGN GUIDE DOCUMENTS.