Installation Manual LTU 101 Digital Product description 2. Check that there is no damage inside the enclosure around the M20 hole. The LTU 101 Digital is a high level module suited for the FGC-range of pump controllers. The LTU 101 Digital is used together with the open bell system. The output is a digital signal indicating whether or not there is a high level in the pump sump. The area around the M20 hole must be free from damages within 2 mm from the edge of the hole. Module parts The parts of the module are shown below. 6 1 Figure 3. M20 hole The figures exemplifies the mounting using one M20 hole. You can use another M20 hole to install the LTU 101 Digital, for example if you prefer to install any analogue level sensor in the right-most M20 hole. 2 3 Mount the sensor house 4 1. Place the sensor house in the M20 hole. 5 Figure 1. Module parts No. 1 3 5 Part Sensor house Lock screw Decrement No. 2 4 6 Part Sensor nut Conduit entry O-ring Figure 4. Mounted sensor house Mount the module 2. Check that the O-ring is fitted correctly into the notch. 3. Is the hose in the sensor element fitted tightly? (It must not be loose.) The assembly instruction is exemplified with the mounting of an LTU 101 Digital in an M20 hole in an FGC 300 small enclosure. – If Yes, continue by mounting the sensor nut. – If No, fit the hose tightly onto the most central of the two pipes in the sensor element. If the open bell is mounted in an ATEX zone, it is extra important to follow the instructions. The LTU 101 Digital can never be mounted in an ATEX zone. Mount the sensor nut 1. Fit the sensor nut manually, turn the nut until it starts to tighten, and then turn it an additional half turn. Inspect the module 2. Make sure that: 1. Check that neither the sensors face of sealing joint, nor the O-ring is damaged. – Lock screw can be fitted. – Sensor house is secured tightly to inside of the enclosure. Figure 2. Sealing joint and notch with O-ring 2 FGC 200 3. Fit and tighten the lock screw. Connect the wires from the module as follows: • Red wire to terminal 14. • Yellow wire to terminal 17. • Black wire to terminal 18. 4-20mA 10 Figure 5. Mounted sensor nut Mount the decrement 11 12 13 14 15 16 17 18 19 20 Red Yellow Black 1. Mount the decrement. 2. Check that the decrement is fitted tightly. Figure 8. Connection diagram for an FGC 200 Technical data Denomination and standards Part no. 40 501556 ATEX Yes Power supply and environment Supply voltage: Figure 6. Mounted decrement Operating temperature: Connect the module Input and output The connection differs between an FGC 300 and an FGC 200. Detection level: Digital output: Temperature drift: FGC 300 18-25 VDC -20°C to +50°C High level signal 4±1 cm ±5% below -10°C Material There are two connection alternatives for an FGC 300. Connect the wires as follows: Material: Enclosure: IP54 • Red wire to terminal 25. Weight: 50 g • Yellow wire to terminal 27. Dimensions: • Black wire to terminal 28 or 30. Mounting: PVC and Epoxy Ø 38x41 M20 cable entry Cable data 24 VDC Max 10W 22 23 24 25 26 27 28 29 Cable length: 4-20 mA 30 31 Max length air tube: 32 Red Yellow Black Figure 7. One of the connection alternatives for FGC 300 3 0,30 m 20 m (Open Bell System) ITT Water & Wastewater AB Box 2058 291 02 Kristianstad Sweden Visiting address: Industrigatan 50 291 36 Kristianstad Sweden 4 Tel +46-44-20 59 00 Fax +46-44-20 59 01 897807_01_EN_GB_INST_LTU101.pdf © ITT Water & Wastewater AB This document can be changed without any prior notice. www.ittwww.com