0275_041414 SH 121 Segment 13 PROJEC T FACT SHEET Project Limits Lewisville Lake 121 Contract amount: $58.8 million COLLIN CO. DENTON CO. T E X A S D E PA R T M E N T O F T R A N S P O R TAT I O N Funding: 80% Federal and 20% State CSJ number: 0364-02-017 289 35E 1171 2499 Grapevine Lake 121 DNT Detail 77 190 121 Project includes: ◦ Converting main lanes from four to 10 lanes with improved frontage roads ◦ Building two overpasses and reconstructing bridges over Denton Creek as well as ramps from NB SH 121 to Sandy Lake Road, SB SH 121 exit to Sandy Lake Road and SB SH 121 exit to SH 26. DENTON CO. DALLAS CO. TARRANT CO. ◦ Widening Denton Creek 114 North Lake 635 35E 635 N 26 121 DFW Int’l. 360 Airport 114 161 PROJECT UPDATES Utilities continue to be relocated 5 miles TxDOT graphic OVERVIEW This project will add capacity from four to 10 lanes on SH 121 between FM 2499 (Grapevine Mills Boulevard) and the Sam Rayburn Tollway/Business 121 split. The project has two overpasses; Grapevine Mills Boulevard/Sandy Lake Drive, Freeport Parkway and bridge widening over Denton Creek. This project will relieve traffic congestion and improve traffic flow in this burgeoning retail and industrial area to benefit commuters as well as commerce. Drill shafts for northbound on-ramp between Sandy Lake Road and Freeport Parkway Bridge bents being constructed at Denton Creek Traffic switch to temporary pavement complete NEXT MAJOR STEPS Bridge beams scheduled to be installed over Denton Creek in July Construction of northbound and southbound frontage roads AESTHETIC EMBELLISHMENTS Adding capacity to SH 121 in this area is an important piece of the ongoing plan to benefit traffic flow on the heels of the D/FW Connector project and the Grapevine Mills Boulevard (FM 2499) added capacity project. The three-year project will be under construction at the same time as the FM 2499 project. The capacity the road has now will continue throughout construction (two general purpose lanes in each direction) and impact to traffic will be minimized by the six-day work schedule, no lane closures during peak travel times, and night work for major lane closures. The posted speed limit of 70 miles per hour will remain in effect. PROJECT DETAILS Contractor: OHL USA, Inc. Construction start: March 2014 Estimated final completion: September 2017 SH 121 SEGMENT 13 • PROJECT FACT SHEET This windmill relief is an example of one of the aesthetic treatments on several retaining walls on this project. SUMMER • 2014 SUMMER • 2014 Dr . ot Pa tri y. k ree nC tP kw Co rp or at eD r. De nt o Fre ep or y. N Coppell Rd. Tr ad eC en te rD r. La ke sid eP kw DALLAS CO. DENTON CO. DALLAS CO. M ne evi ap Gr Canyon Dr. kwy. ills P 121 N State Rd. TARRANT CO. 2499 N Coppell Rd. W Parkway Blvd. DALLAS CO. Grapevine Golf Course 121 DENTON CO. Main Lanes Frontage Roads Cross Streets Ramps Bridges Cottonwood Creek Elementary School W Sandy Lake Rd. Grapevine Mills Blvd. Freeport Pkwy. Stars And Stripes Way Northpoint Dr. S Royal Ln. W Sa nd yL ak eR d. 2499 Northpoint Dr. Grapevine Mills 26 DALLAS CO. TARRANT CO. 121 Ga te w a . y Blvd Coppell Nature Park Genesis Way Creekvi e Ruby Rd. w Dr. Creekview Dr. N 1/2 mile NOTE: Highlighted areas are not drawn to scale. TxDOT graphic PROJECT CONTACTS Texas Department of Transportation 4777 E. Highway 80 Mesquite, TX 75150-6643 SH 121 SEGMENT 13 • PROJECT FACT SHEET Michelle Releford Public Information Officer (214) 320-4485 Michelle.Releford@txdot.gov SUMMER • 2014 0275_041414 SH 121 SEGMENT 13 • PROJECT FACT SHEET