Midwest ISO
FERC Electric Tariff, Third Revised Volume No. 1
Substitute First Revised Sheet No. 1714Z.14
Superseding First Revised Sheet No. 1714Z.14
Attachment A (Page 1)
To Appendix 1
Interconnection Request
GENERATING FACILITY DATA
UNIT RATINGS
KVA
Power Factor
Speed (RPM)
Short Circuit Ratio_______
Stator Amperes at Rated kVA
Max Turbine MW
ºF
Voltage
Connection (e.g. Wye)
Frequency, Hertz
Field Volts
ºF
COMBINED TURBINE-GENERATOR-EXCITER INERTIA DATA
Inertia Constant, H =
Moment-of-Inertia, WR2
=
kW sec/kVA
lb. ft.2
REACTANCE DATA (PER UNIT-RATED KVA)
Synchronous – saturated
Synchronous – unsaturated
Transient – saturated
Transient – unsaturated
Subtransient – saturated
Subtransient – unsaturated
Negative Sequence – saturated
Negative Sequence – unsaturated
Zero Sequence – saturated
Zero Sequence – unsaturated
Leakage Reactance
DIRECT AXIS
QUADRATURE AXIS
Xdv
Xd
Xdv
Xdi
Xdv
Xdi
X2v
X2i
X0v
X0i
Xlm
Xqv
Xqi
Xqv
Xqi
Xqv
Xqi
Tdo
Td3
Td2
Td1
Tqo
Tq
FIELD TIME CONSTANT DATA (SEC)
Open Circuit
Three-Phase Short Circuit Transient
Line to Line Short Circuit Transient
Line to Neutral Short Circuit Transient
Transient
T d1
Line to Neutral Short Circuit
Issued by: Ronald R. McNamara, Issuing Officer
Effective: April 1, 2005
Issued on: April 14, 2005
Filed to comply with the March 16, 2005 Order on Certification and Conditionally Approving Revised Tariff Sheets in
Docket Nos. ER04-691-014, ER04-691-025, EL04-104-013 and EL04-104-024 (Midwest Independent Transmission
System Operator, Inc., 110 FERC ¶ 61,289 (2005)).
Midwest ISO
FERC Electric Tariff, Third Revised Volume No. 1
First Revised Sheet No. 1714Z.15
Superseding Original Sheet No. 1714Z.15
Attachment A (Page 2)
To Appendix 1
Interconnection Request
Short Circuit Subtransient
Open Circuit Subtransient
Td
Tdo
Tq
Tqo
ARMATURE TIME CONSTANT DATA (SEC)
Three Phase Short Circuit
Line to Line Short Circuit
Line to Neutral Short Circuit
Ta3
Ta2
Ta1
NOTE: If requested information is not applicable, indicate by marking "N / A."
Issued by: Ronald R. McNamara, Issuing Officer
Effective: April 1, 2005
Issued on: April 6, 2005
Filed to comply with the March 16, 2005 Order on Certification and Conditionally Approving Revised Tariff Sheets in
Docket Nos. ER04-691-014, ER04-691-025, EL04-104-013 and EL04-104-024 (Midwest Independent Transmission
System Operator, Inc., 110 FERC ¶ 61,289 (2005)).
Midwest ISO
FERC Electric Tariff, Third Revised Volume No. 1
First Revised Sheet No. 1714Z.16
Superseding Original Sheet No. 1714Z.16
Attachment A (Page 3)
To Appendix 1
Interconnection Request
MW CAPABILITY AND PLANT CONFIGURATION
GENERATING FACILITY DATA
ARMATURE WINDING RESISTANCE DATA (PER UNIT)
Positive
Negative
Zero
R1
R2
R0
Rotor Short Time Thermal Capacity I22t
Field Current at Rated kVA, Armature Voltage and PF
Field Current at Rated kVA and Armature Voltage, 0 PF
Three Phase Armature Winding Capacitance
Field Winding Resistance
Armature Winding Resistance (Per Phase)
=
=
=
=
=
=
amps
amps
microfarad
ohms
ohms
C
C
CURVES
Provide Saturation, Vee, Reactive Capability, Capacity Temperature Correction curves. Designate
normal and emergency Hydrogen Pressure operating range for multiple curves.
Provide Power Quality curves if available specifying percent total harmonic distortion vertically
and percent power output horizontally from 25 – 100% power output for both current and
voltages or specify that the unit is IEEE 519 compliant.
Issued by: Ronald R. McNamara, Issuing Officer
Effective: April 1, 2005
Issued on: April 6, 2005
Filed to comply with the March 16, 2005 Order on Certification and Conditionally Approving Revised Tariff Sheets in
Docket Nos. ER04-691-014, ER04-691-025, EL04-104-013 and EL04-104-024 (Midwest Independent Transmission
System Operator, Inc., 110 FERC ¶ 61,289 (2005)).
Midwest ISO
FERC Electric Tariff, Third Revised Volume No. 1
First Revised Sheet No. 1714Z.17
Superseding Original Sheet No. 1714Z.17
Attachment A (Page 4)
To Appendix 1
Interconnection Request
GENERATOR STEP-UP TRANSFORMER DATA
RATINGS
Capacity
Voltage Ratio
Self-cooled/maximum nameplate
/
kVA
(Generator side/System side/Tertiary)\
/
kVA
Winding Connections (Low V/High V/Tertiary V (Delta or Wye))
/
kVA
Fixed Taps Available
Present Tap Setting
IMPEDANCE
Positive
Z1 (on self-cooled kVA rating)
%
X/R
Zero
Z0 (on self-cooled kVA rating)
%
X/R
Note: Applicable data sheets are required for all multiple transformers and/or multiple winding
transformers.
Issued by: Ronald R. McNamara, Issuing Officer
Effective: April 1, 2005
Issued on: April 6, 2005
Filed to comply with the March 16, 2005 Order on Certification and Conditionally Approving Revised Tariff Sheets in
Docket Nos. ER04-691-014, ER04-691-025, EL04-104-013 and EL04-104-024 (Midwest Independent Transmission
System Operator, Inc., 110 FERC ¶ 61,289 (2005)).
Midwest ISO
FERC Electric Tariff, Third Revised Volume No. 1
Substitute First Revised Sheet No. 1714Z.18
Superseding First Revised Sheet No. 1714Z.18
Attachment A (Page 5)
To Appendix 1
Interconnection Request
EXCITATION SYSTEM DATA
Identify appropriate IEEE model block diagram of excitation system and power system stabilizer
(PSS) for computer representation in power system stability simulations and the corresponding
excitation system and PSS constants for use in the model.
GOVERNOR SYSTEM DATA
Identify appropriate IEEE model block diagram of governor system for computer representation
in power system stability simulations and the corresponding governor system constants for use in
the model.
OTHER SPECIAL EQUIPMENT
Identify any required or planned special equipment and/or diagrams required for this installation
including, any Flexible AC Transmission (FACTs) devices such as static VAR compensators or
Special Protection Systems (SPS’s). Special Protection Systems are defined in the LGIP.
WIND FARM GENERATORS
Number of generators to be interconnected pursuant
to this Interconnection Request: ______
Elevation: ____________
_____ Single Phase
_____ Three Phase
Inverter manufacturer, model name, number, and
version:_________________________________________________________________
Issued by: Ronald R. McNamara, Issuing Officer
Effective: April 1, 2005
Issued on: April 14, 2005
Filed to comply with the March 16, 2005 Order on Certification and Conditionally Approving Revised Tariff Sheets in
Docket Nos. ER04-691-014, ER04-691-025, EL04-104-013 and EL04-104-024 (Midwest Independent Transmission
System Operator, Inc., 110 FERC ¶ 61,289 (2005)).
Midwest ISO
FERC Electric Tariff, Third Revised Volume No. 1
Substitute First Revised Sheet No. 1714Z.19
Superseding First Revised Sheet No. 1714Z.19
Attachment A (Page 6)
To Appendix 1
Interconnection Request
List of adjustable setpoints for the protective equipment or software:
Type of wind generator including a generic description, e.g., GE doubly fed induction machine
with back-to-back IGBT converters, or Micon induction generator):
Specify wind generator voltage ride through capability:
Minimum low voltage threshold in percent to enable tripping
Minimum low voltage duration in seconds to enable tripping
Provide voltage flicker data, if available, for the wind generator model to be installed specified in
percent of total voltage output. The data may be provided at 25, 50, 75, and 100% of output or in
the form of a curve with the Y-axis showing percent of flicker versus total output and the X-axis
showing percent load output from at least 25% to 100% of total output.
Provide voltage dropout limits expressed in voltage level versus time
Provide frequency dropout limits expressed in frequency versus time
Note: Completed Power Technology Inc. (PTI) Power Systems Load Flow, generator,
exciter, and governor data sheets, or acceptable, alternative standard format requested by
the Transmission Provider, must be supplied with the Interconnection Request. If other
data sheets are more appropriate to the proposed device then they shall be provided and
discussed at Scoping Meeting. The Interconnection Customer consisting of many small
units shall be required to provide equivalent models of their Generation Facility at the
Point of Interconnection with the Transmission Provider.
Issued by: Ronald R. McNamara, Issuing Officer
Effective: April 1, 2005
Issued on: April 14, 2005
Filed to comply with the March 16, 2005 Order on Certification and Conditionally Approving Revised Tariff Sheets in
Docket Nos. ER04-691-014, ER04-691-025, EL04-104-013 and EL04-104-024 (Midwest Independent Transmission
System Operator, Inc., 110 FERC ¶ 61,289 (2005)).
Midwest ISO
FERC Electric Tariff, Third Revised Volume No. 1
First Revised Sheet No. 1714Z.20
Superseding Original Sheet No. 1714Z.20
Attachment A (Page 7)
To Appendix 1
Interconnection Request
INDUCTION GENERATORS:
(*) Motoring Power (kW): _______
(*) Neutral Grounding Resistor (If Applicable): ____________
(*) I22t or K (Heating Time Constant): ____________
(*) Rotor Resistance: ____________
(*) Stator Resistance: ____________
(*) Stator Reactance: ____________
(*) Rotor Reactance: ____________
(*) Magnetizing Reactance: ___________
(*) Short Circuit Reactance: ___________
(*) Exciting Current: ________________
(*) Temperature Rise:________________
(*) Frame Size: _______________
(*) Design Letter: _____________
(*) Reactive Power Required In Vars (No Load): ________
(*) Reactive Power Required In Vars (Full Load): ________
(*) Total Rotating Inertia, H: ________Per Unit on KVA Base
Note: Please consult Transmission Provider prior to submitting the Interconnection
Request to determine if the information designated by (*) is required.
Issued by: Ronald R. McNamara, Issuing Officer
Effective: April 1, 2005
Issued on: April 6, 2005
Filed to comply with the March 16, 2005 Order on Certification and Conditionally Approving Revised Tariff Sheets in
Docket Nos. ER04-691-014, ER04-691-025, EL04-104-013 and EL04-104-024 (Midwest Independent Transmission
System Operator, Inc., 110 FERC ¶ 61,289 (2005)).