Midwest ISO FERC Electric Tariff, Third Revised Volume No. 1 Substitute First Revised Sheet No. 1714Z.14 Superseding First Revised Sheet No. 1714Z.14 Attachment A (Page 1) To Appendix 1 Interconnection Request GENERATING FACILITY DATA UNIT RATINGS KVA Power Factor Speed (RPM) Short Circuit Ratio_______ Stator Amperes at Rated kVA Max Turbine MW ºF Voltage Connection (e.g. Wye) Frequency, Hertz Field Volts ºF COMBINED TURBINE-GENERATOR-EXCITER INERTIA DATA Inertia Constant, H = Moment-of-Inertia, WR2 = kW sec/kVA lb. ft.2 REACTANCE DATA (PER UNIT-RATED KVA) Synchronous – saturated Synchronous – unsaturated Transient – saturated Transient – unsaturated Subtransient – saturated Subtransient – unsaturated Negative Sequence – saturated Negative Sequence – unsaturated Zero Sequence – saturated Zero Sequence – unsaturated Leakage Reactance DIRECT AXIS QUADRATURE AXIS Xdv Xd Xdv Xdi Xdv Xdi X2v X2i X0v X0i Xlm Xqv Xqi Xqv Xqi Xqv Xqi Tdo Td3 Td2 Td1 Tqo Tq FIELD TIME CONSTANT DATA (SEC) Open Circuit Three-Phase Short Circuit Transient Line to Line Short Circuit Transient Line to Neutral Short Circuit Transient Transient T d1 Line to Neutral Short Circuit Issued by: Ronald R. McNamara, Issuing Officer Effective: April 1, 2005 Issued on: April 14, 2005 Filed to comply with the March 16, 2005 Order on Certification and Conditionally Approving Revised Tariff Sheets in Docket Nos. ER04-691-014, ER04-691-025, EL04-104-013 and EL04-104-024 (Midwest Independent Transmission System Operator, Inc., 110 FERC ¶ 61,289 (2005)). Midwest ISO FERC Electric Tariff, Third Revised Volume No. 1 First Revised Sheet No. 1714Z.15 Superseding Original Sheet No. 1714Z.15 Attachment A (Page 2) To Appendix 1 Interconnection Request Short Circuit Subtransient Open Circuit Subtransient Td Tdo Tq Tqo ARMATURE TIME CONSTANT DATA (SEC) Three Phase Short Circuit Line to Line Short Circuit Line to Neutral Short Circuit Ta3 Ta2 Ta1 NOTE: If requested information is not applicable, indicate by marking "N / A." Issued by: Ronald R. McNamara, Issuing Officer Effective: April 1, 2005 Issued on: April 6, 2005 Filed to comply with the March 16, 2005 Order on Certification and Conditionally Approving Revised Tariff Sheets in Docket Nos. ER04-691-014, ER04-691-025, EL04-104-013 and EL04-104-024 (Midwest Independent Transmission System Operator, Inc., 110 FERC ¶ 61,289 (2005)). Midwest ISO FERC Electric Tariff, Third Revised Volume No. 1 First Revised Sheet No. 1714Z.16 Superseding Original Sheet No. 1714Z.16 Attachment A (Page 3) To Appendix 1 Interconnection Request MW CAPABILITY AND PLANT CONFIGURATION GENERATING FACILITY DATA ARMATURE WINDING RESISTANCE DATA (PER UNIT) Positive Negative Zero R1 R2 R0 Rotor Short Time Thermal Capacity I22t Field Current at Rated kVA, Armature Voltage and PF Field Current at Rated kVA and Armature Voltage, 0 PF Three Phase Armature Winding Capacitance Field Winding Resistance Armature Winding Resistance (Per Phase) = = = = = = amps amps microfarad ohms ohms C C CURVES Provide Saturation, Vee, Reactive Capability, Capacity Temperature Correction curves. Designate normal and emergency Hydrogen Pressure operating range for multiple curves. Provide Power Quality curves if available specifying percent total harmonic distortion vertically and percent power output horizontally from 25 – 100% power output for both current and voltages or specify that the unit is IEEE 519 compliant. Issued by: Ronald R. McNamara, Issuing Officer Effective: April 1, 2005 Issued on: April 6, 2005 Filed to comply with the March 16, 2005 Order on Certification and Conditionally Approving Revised Tariff Sheets in Docket Nos. ER04-691-014, ER04-691-025, EL04-104-013 and EL04-104-024 (Midwest Independent Transmission System Operator, Inc., 110 FERC ¶ 61,289 (2005)). Midwest ISO FERC Electric Tariff, Third Revised Volume No. 1 First Revised Sheet No. 1714Z.17 Superseding Original Sheet No. 1714Z.17 Attachment A (Page 4) To Appendix 1 Interconnection Request GENERATOR STEP-UP TRANSFORMER DATA RATINGS Capacity Voltage Ratio Self-cooled/maximum nameplate / kVA (Generator side/System side/Tertiary)\ / kVA Winding Connections (Low V/High V/Tertiary V (Delta or Wye)) / kVA Fixed Taps Available Present Tap Setting IMPEDANCE Positive Z1 (on self-cooled kVA rating) % X/R Zero Z0 (on self-cooled kVA rating) % X/R Note: Applicable data sheets are required for all multiple transformers and/or multiple winding transformers. Issued by: Ronald R. McNamara, Issuing Officer Effective: April 1, 2005 Issued on: April 6, 2005 Filed to comply with the March 16, 2005 Order on Certification and Conditionally Approving Revised Tariff Sheets in Docket Nos. ER04-691-014, ER04-691-025, EL04-104-013 and EL04-104-024 (Midwest Independent Transmission System Operator, Inc., 110 FERC ¶ 61,289 (2005)). Midwest ISO FERC Electric Tariff, Third Revised Volume No. 1 Substitute First Revised Sheet No. 1714Z.18 Superseding First Revised Sheet No. 1714Z.18 Attachment A (Page 5) To Appendix 1 Interconnection Request EXCITATION SYSTEM DATA Identify appropriate IEEE model block diagram of excitation system and power system stabilizer (PSS) for computer representation in power system stability simulations and the corresponding excitation system and PSS constants for use in the model. GOVERNOR SYSTEM DATA Identify appropriate IEEE model block diagram of governor system for computer representation in power system stability simulations and the corresponding governor system constants for use in the model. OTHER SPECIAL EQUIPMENT Identify any required or planned special equipment and/or diagrams required for this installation including, any Flexible AC Transmission (FACTs) devices such as static VAR compensators or Special Protection Systems (SPS’s). Special Protection Systems are defined in the LGIP. WIND FARM GENERATORS Number of generators to be interconnected pursuant to this Interconnection Request: ______ Elevation: ____________ _____ Single Phase _____ Three Phase Inverter manufacturer, model name, number, and version:_________________________________________________________________ Issued by: Ronald R. McNamara, Issuing Officer Effective: April 1, 2005 Issued on: April 14, 2005 Filed to comply with the March 16, 2005 Order on Certification and Conditionally Approving Revised Tariff Sheets in Docket Nos. ER04-691-014, ER04-691-025, EL04-104-013 and EL04-104-024 (Midwest Independent Transmission System Operator, Inc., 110 FERC ¶ 61,289 (2005)). Midwest ISO FERC Electric Tariff, Third Revised Volume No. 1 Substitute First Revised Sheet No. 1714Z.19 Superseding First Revised Sheet No. 1714Z.19 Attachment A (Page 6) To Appendix 1 Interconnection Request List of adjustable setpoints for the protective equipment or software: Type of wind generator including a generic description, e.g., GE doubly fed induction machine with back-to-back IGBT converters, or Micon induction generator): Specify wind generator voltage ride through capability: Minimum low voltage threshold in percent to enable tripping Minimum low voltage duration in seconds to enable tripping Provide voltage flicker data, if available, for the wind generator model to be installed specified in percent of total voltage output. The data may be provided at 25, 50, 75, and 100% of output or in the form of a curve with the Y-axis showing percent of flicker versus total output and the X-axis showing percent load output from at least 25% to 100% of total output. Provide voltage dropout limits expressed in voltage level versus time Provide frequency dropout limits expressed in frequency versus time Note: Completed Power Technology Inc. (PTI) Power Systems Load Flow, generator, exciter, and governor data sheets, or acceptable, alternative standard format requested by the Transmission Provider, must be supplied with the Interconnection Request. If other data sheets are more appropriate to the proposed device then they shall be provided and discussed at Scoping Meeting. The Interconnection Customer consisting of many small units shall be required to provide equivalent models of their Generation Facility at the Point of Interconnection with the Transmission Provider. Issued by: Ronald R. McNamara, Issuing Officer Effective: April 1, 2005 Issued on: April 14, 2005 Filed to comply with the March 16, 2005 Order on Certification and Conditionally Approving Revised Tariff Sheets in Docket Nos. ER04-691-014, ER04-691-025, EL04-104-013 and EL04-104-024 (Midwest Independent Transmission System Operator, Inc., 110 FERC ¶ 61,289 (2005)). Midwest ISO FERC Electric Tariff, Third Revised Volume No. 1 First Revised Sheet No. 1714Z.20 Superseding Original Sheet No. 1714Z.20 Attachment A (Page 7) To Appendix 1 Interconnection Request INDUCTION GENERATORS: (*) Motoring Power (kW): _______ (*) Neutral Grounding Resistor (If Applicable): ____________ (*) I22t or K (Heating Time Constant): ____________ (*) Rotor Resistance: ____________ (*) Stator Resistance: ____________ (*) Stator Reactance: ____________ (*) Rotor Reactance: ____________ (*) Magnetizing Reactance: ___________ (*) Short Circuit Reactance: ___________ (*) Exciting Current: ________________ (*) Temperature Rise:________________ (*) Frame Size: _______________ (*) Design Letter: _____________ (*) Reactive Power Required In Vars (No Load): ________ (*) Reactive Power Required In Vars (Full Load): ________ (*) Total Rotating Inertia, H: ________Per Unit on KVA Base Note: Please consult Transmission Provider prior to submitting the Interconnection Request to determine if the information designated by (*) is required. Issued by: Ronald R. McNamara, Issuing Officer Effective: April 1, 2005 Issued on: April 6, 2005 Filed to comply with the March 16, 2005 Order on Certification and Conditionally Approving Revised Tariff Sheets in Docket Nos. ER04-691-014, ER04-691-025, EL04-104-013 and EL04-104-024 (Midwest Independent Transmission System Operator, Inc., 110 FERC ¶ 61,289 (2005)).