I-REACT Project Overview Project Responsible: Fabrizio Dominici dominici@ismb.it ISMB – Torino - Italy At a Glance I-REACT Total costs of 6,65 M€ 36 months 5 in-field demonstrations I-REACT | SEP-210293370 | H2020-DRS-1-2015 20 partners from 9 states 12 SMEs, 3 Research Centers, 2 Universities, 2 public company/institute, 1 UN body @ISMB 2016 - Confidential content – All rigths reserved 5/17/2016 2 Motivation I-REACT The surface temperature is projected to rise over the 21st century under all emission scenarios. Climate change increases the frequency of extreme weather events. Projected Seasonal Severity Rating change in 2071-2100 compared to 1961-1990 (left), annual average SSR in 2071-2100 (right) Projected river discharge (100 years return) in 2020 (left), 2050 (center), 2080 Projected change in surface air temperature under three different scenarios: RCP 4.5 (top) and 8.5 (bottom) and three time span: annual (left), summer (center), winter (right) I-REACT | SEP-210293370 | H2020-DRS-1-2015 @ISMB 2016 - Confidential content – All rigths reserved 5/17/2016 3 Goals I-REACT I-REACT: Improving Resilience to Emergencies through Advanced Cyber Technologies. Help society in becoming more resilient to crises arising before, during and after emergency events. Provide increased resilience to natural disasters though better analysis and anticipation, effective and fast emergency response, increased awareness and citizen engagement. Integrate existing Emergency Management Systems and multiple data sources. Enable new business opportunities around natural disasters triggered by extreme weather conditions. I-REACT | SEP-210293370 | H2020-DRS-1-2015 @ISMB 2016 - Confidential content – All rigths reserved 5/17/2016 4 Concept Description: Workflow I-REACT | SEP-210293370 | H2020-DRS-1-2015 @ISMB 2016 - Confidential content – All rigths reserved I-REACT 5/17/2016 5 Concept Description: Architecture I-REACT | SEP-210293370 | H2020-DRS-1-2015 @ISMB 2016 - Confidential content – All rigths reserved I-REACT 5/17/2016 6 Overall Approach I-REACT | SEP-210293370 | H2020-DRS-1-2015 I-REACT @ISMB 2016 - Confidential content – All rigths reserved 5/17/2016 7 Ambition I-REACT Systems Users Citizens • Crowdsourcing • Gamification • Social Media First Responders Decision Makers • Wearable device • Augmented Positioning • Augmented Reality • UAVs • GNSS Reflectometry • Decision Support System I-REACT | SEP-210293370 | H2020-DRS-1-2015 Models Big Data • Climate change • Weather Forecast • Risk • Hazard Nowcast and Forecasts • Big-Data architecture • Real-time EO Mapping • Architecture • Linked Data • Semantic @ISMB 2016 - Confidential content – All rigths reserved Wireless Comm. • Performance under emergency scenarios • 5G 5/17/2016 8 Impacts I-REACT 1. Faster analysis of risk and anticipation 2. Online nowcasting and forecasting systems 3. Reduction of human losses, environmental and economic impact of natural hazards 4. Reduction of emergency management costs by using adapted cyber technologies 5. Increase citizens involvement and awareness 6. Faster and more effective emergency response I-REACT | SEP-210293370 | H2020-DRS-1-2015 @ISMB 2016 - Confidential content – All rigths reserved 5/17/2016 9 Stakeholders Identification I-REACT | SEP-210293370 | H2020-DRS-1-2015 @ISMB 2016 - Confidential content – All rigths reserved I-REACT 5/17/2016 10 Business Model I-REACT B2B Products I-EP: IREACT Emergency Planning I-INS: IREACT Insurance I-DATA: TREACT Data I-REACT | SEP-210293370 | H2020-DRS-1-2015 Wholesale Product I-THIRD: all I-REACT componenets @ISMB 2016 - Confidential content – All rigths reserved 5/17/2016 11 Communication Timeline I-REACT | SEP-210293370 | H2020-DRS-1-2015 @ISMB 2016 - Confidential content – All rigths reserved I-REACT 5/17/2016 12 Work Plan I-REACT | SEP-210293370 | H2020-DRS-1-2015 I-REACT @ISMB 2016 - Confidential content – All rigths reserved 5/17/2016 13 Macro Gantt I-REACT 2016 2017 2018 2019 Month 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 Milestsones and Meetings MS1 Kick-Off meeting MS2 International User Requirements Workshop (URW) Advisory Board Streering Meeting (ABM1) MS3 Design Review (DR) Pleanary Call Conference (PCC1) Advisory Board Steering Call (ABC1) MS4 Mid-Term Review (MTR) MS5 Implementation Review (IR) Advisory Board Steering Call (ABC2) IF1 In-field Demo and User Feedback Workshop (IFD1) IF2 In-field Demo and User Feedback Workshop (IFD2) IF3 In-field Demo and User Feedback Workshop (IFD3) IF4 In-field Demo and User Feedback Workshop (IFD4) IF5 In-field Demo and User Feedback Workshop (IFD5) MS6 Intermediate Demonstration Review (IDR) Final Conference MS7 Final Review (FR) WP1 Management 1 1 1 1 1 1 WP2 Innovation Design 1 1 1 1 1 1 WP3 External Services and Data Integration 1 1 WP4 Modelling and Engines 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 WP6 Validation and Demonstration 1 1 1 WP7 Businness Assessment and Exploitation 1 1 1 1 WP5 Service Oriented Architecture WP8 Dissemination for Impact Maximization I-REACT | SEP-210293370 | H2020-DRS-1-2015 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 @ISMB 2016 - Confidential content – All rigths reserved 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 5/17/2016 14 Management Structure I-REACT | SEP-210293370 | H2020-DRS-1-2015 @ISMB 2016 - Confidential content – All rigths reserved I-REACT 5/17/2016 15 End-User & Advisory Board End-Users I-REACT Advisors Remote Sensing Applications Center Häme Coast Guard I-REACT | SEP-210293370 | H2020-DRS-1-2015 @ISMB 2016 - Confidential content – All rigths reserved 5/17/2016 16 I-REACT THANK YOU ANY QUESTIONS? I-REACT Project Overview dominici@simb.it @fabrydominici Fabrizio_dominici http://www.ismb.it/fabrizio. dominici Via Pier Carlo Boggio 61, 10138 Torino I-REACT• Improving Resilience to Emergencies through Advanced Cyber Technologies I-REACT | SEP-210293370 | H2020-DRS-1-2015