PowerStar 100KW Digital Load Bank Quick Start Guide

advertisement
Simplex PowerStar Quick Start Guide
Adam Narup
Simplex
Simplex PowerStar Quick Start Guide
DESCRIPTION
Simplex Load Banks are precision test instruments
specifically designed to apply a discrete, selectable
resistive electrical load to a power source while
measuring the response of the generator to the applied
load. They also provide a means for routine
maintenance exercise to assure long term reliability and
readiness of the standby generator. Exercise Load Banks
eliminate the detrimental effects of unloaded operation
of diesel engine generators.
This fully self-contained Load Bank includes test
instrumentation, cooling system, rugged load elements,
load-application control devices and automatic system
protection devices.
The resistive load elements in this Load Bank are cooled
by a horizontal forced air system. The load system is
connected to the test source via the load cables. This
Load Bank is equipped with automatic safety systems
which de-energize all load steps when conditions are
present which could damage the Load Bank or present a
safety hazard to the operator. A Cooling Failure deenergizes any load applied when cooling of the load
elements becomes inadequate due to fan failure or high
exhaust temperature.
PRIMARY INSPECTION
Preventative visual inspections of the shipping crate and
Load Bank is advised. Physical or electrical problems due
to handling and vibration may occur. Never apply power
to a Load Bank before performing this procedure. The
following five point inspection is recommended before
installation, and as part of the 50 hr. / 6 month
maintenance schedule or as a Load Bank is relocated:
1. If crate shows any signs of damage examine the Load
Bank in the corresponding areas for signs of initial
problems.
2. Check the entire outside of the cabinet for any visual
damage which could cause internal electrical or
mechanical problems due to reduced clearance.
3. Inspect all relays and control modules. Make sure all
components are secure in their bases and safety bails
are in place. Spot check electrical connections for
tightness. If any loose connections are found inspect and
tighten all remaining connections.
4. Examine all accessible internal electrical components
such as fuses, contactors and relays. Check lugged wires
at these components.
5. Visually inspect element chamber for foreign objects,
broken ceramic insulators, mechanical damage.
Simplex, Inc., 5300 Rising Moon Road, Springfield, IL 62711-6228 • 217-483-1600
© 2011 Simplex, Inc. All Rights Reserved. • Printed in the USA. • www.simplexdirect.com
Simplex PowerStar Quick Start Guide
MAINTENANCE
The Load Bank has been designed to require minimum
maintenance. All components have been chosen for a
long, reliable life. Two basic intervals of maintenance are
required: each operation and every 50 hours or 6
months (which-ever comes first).
LOAD BANK LOCATION
The load elements in this Load Bank are cooled by a
horizontal forced air system which discharges through
the front of the cabinet. Location of the Load Bank is of
prime importance and is one of the most critical factors
involved in safe operation. The Load Bank must be
positioned and installed according to large airflow
requirements. Never point the exhaust at a nearby
surface or object which may be adversely affected by
high temperature. Never operate the Load Bank in a
confined space without regard for adequate intake of air
and provision for exit of high temperature exhaust.
Consider that the Load Bank and a nearby generator set
may have to compete for cooling air. Never bounce hot
exhaust air off nearby objects and allow it to re-circulate
through the cooling system. Never operate the Load
Bank in proximity to a sprinkler system.
EACH OPERATION
The air intake screens and louvers, fan and cooling
chamber, and exhaust openings must be checked for any
obstructions or foreign objects. Due to the high volume
of air circulated, paper and other items can be drawn
into the air intakes. During Load Bank operation insure
that air is exiting from the exhaust vent. The load
branches should be checked for blown fuses or opened
Simplex, Inc., 5300 Rising Moon Road, Springfield, IL 62711-6228 • 217-483-1600
© 2011 Simplex, Inc. All Rights Reserved. • Printed in the USA. • www.simplexdirect.com
Simplex PowerStar Quick Start Guide
load resistors. To check the fuses or load resistors,
operate the Load Bank from a balanced 3-phase
source and check the three line currents. The three
current readings should be essentially the same. If a
sizeable difference is noted one or more load fuses or
load resistors may have malfunctioned.
EVERY 50 HOURS OR 6 MONTHS
Check the tightness of the electrical connections. The
expansion and contraction caused by Load Bank
operation may result in loose connections. The
vibrations caused by the cooling fan may also loosen
electrical connections. If the Load Bank is transported
“over the road”, the electrical connections should be
checked for tightness at a shorter-than-normal time
interval. See “Primary Inspection”.
FAILURE SUBSYSTEM
Excessive intake/exhaust temperatures, any reduction in
cooling air flow, or a Loss of Communication from either
the hand held controller or the controlling load bank is
indicated by the illumination of the “Failure” indicator
on the hand held remote control. Any of the above
conditions will result in the Load Bank entering a failure
state. The “Failure” indicator on the hand held controller
will illuminate and the load de-energizes. All load steps
are locked out until the problem is corrected. Until the
failure is investigated/corrected and the control system
is reset the load cannot be reapplied.
Simplex, Inc., 5300 Rising Moon Road, Springfield, IL 62711-6228 • 217-483-1600
© 2011 Simplex, Inc. All Rights Reserved. • Printed in the USA. • www.simplexdirect.com
Simplex PowerStar Quick Start Guide
Generator Connection Diagram
Control Connection Diagram
Simplex, Inc., 5300 Rising Moon Road, Springfield, IL 62711-6228 • 217-483-1600
© 2011 Simplex, Inc. All Rights Reserved. • Printed in the USA. • www.simplexdirect.com
Simplex PowerStar Quick Start Guide
OPERATION
1. Confirm the test source is properly grounded and ground
the Load Bank to its own independent ground.
Individual Unit Control
2. Confirm the Control Power, Master Load and all load
step switches are in the “Off” position.
3. See Control Section Drawing:
a. Using appropriate cables, connect the load source to the
Cam-Type Connectors on the Load Bank.
b. Place the Fan/Control Power Plug into a 120V, 15A
maximum external receptacle.
4. Place the “Control Power Switch” located on the remote
control in the “On” position.
5. Visually observe correct fan operation and investigate
any unusual fan related noises.
6. Check air intake for obstructions and confirm positive air
flow.
7. Verify the “Normal” indicator is shown before
proceeding.
8. Start-up generator or bring other test source on line.
9. Adjust power source voltage and frequency.
10. Select the desired load steps by placing them in the
“On” position.
11. Place the “Master Load” switch in the “On” position.
This simultaneously applies all of the selected load steps.
Trim is achieved by flipping the load steps “On” and “Off”
while the “Master Load” is in the “On” position.
12. Adjust source voltage and load. Monitor as needed.
Simplex, Inc., 5300 Rising Moon Road, Springfield, IL 62711-6228 • 217-483-1600
© 2011 Simplex, Inc. All Rights Reserved. • Printed in the USA. • www.simplexdirect.com
Simplex PowerStar Quick Start Guide
Multiple Unit Control
Metering Screen
The Metering Screen is accessed by pressing the F5
function key. Return to Main Control Screen by again,
pressing the F5 button.
10. Select the desired load steps by pressing the Load Entry
button and enter the desired load.
SHUTDOWN
11. Place the “Master Load” switch in the “On” position.
2. Run the cooling fan for 5 minutes to assure a thorough
cool down of all load elements (optional).
This simultaneously applies the entered load. Trim is
achieved by pressing the Load Entry button and entering a
new value as the “Master Load” is in the “On” position.
1. De-energize the load.
3. Place the “Control Power” switch in the “Off” position.
12. Adjust source voltage and load. Monitor as needed.
Simplex, Inc., 5300 Rising Moon Road, Springfield, IL 62711-6228 • 217-483-1600
© 2011 Simplex, Inc. All Rights Reserved. • Printed in the USA. • www.simplexdirect.com
Download