ARTICLE 70 8 - CRITICAL OPERATIONS POWER SYSTEMS (COPS ) nergy storage shall also be marked with the maximum oper a ' g voltage, including any equ alization voltage, and the of the grounded circuit conducto r. 1 h 705.E Hybrid Systems. Hybrid systems shal l be pfrmitt ed to ' be i nterconnec te d wi th u tility-interac tive inv^tters. fs 705.95 Alnpacity of Neutral Conductor. If a sing leph ase, 2-whip inverter ou tput is co nnec ted to the neutral an d o ne ungrou ri^ed conductor (only) of a 3-wire sy stem or of a 3-ph ase, 4 -wi ne , wye-co nnected sys tem , th e max i mum load conne cted b et^een the neutral an d any o ne ungrounded conductor plu s the inverter outpu t rating shall not excee d the ampac i ty of the neu tral co nductor. - 708.2 1. General 708.1 Scope. The provisio n s of this arti cl e apply to the i nstallati on, operation , monitoring, control , and mainten ance of the p ort i ons of the premises wi ring system in ten de d t o supp l y, distri b ute, a n d control electricity to designated criti cal op erations areas (D C O A) i n the event of di sruptio n to elements of the n ormal sys tem. Critical operati on s p ower systems are th ose sys tems so classed by mu ni cip al , state, fe deral , or other codes by any governmenta l agency havi ng ju ri sd ic tion or b y facility en g i neering doc umentati on estab lishing the n ecess ity for such a sys tem. These sys tem s inclu de but are n ot limi ted to power sys tems, HVAC , fire al arm, security, communicatio n s, an d sign aling fo r desig n ate d c ritical operations areas. 705.100 Unbalanced Interconnections. (A) Single Phase. S in gl e-phase i nverters for hybrid systems and ac modules i n interac tive hybrid system s shall n ot b e connected to 3-ph ase power s ystems unless the i nterco nnected sys tem is des i g ned s o that s ignificant unb al anced voltages canno t res ult. (B) Three Phase. Three-ph as e inverters and 3-ph ase ac modules in interactive systems shall have all ph ases automatically de-energized up on lo ss of, or unbal anced, voltage in one or more phases unless the interconnected system is designed so that sig nificant unbalanced voltages will not resu lt. III. Generators FPN No. 1: Critical operations power systems are generally installed in vital infrastructure facilities that, if destroyed or incapacitated, would disrupt national security, the economy, public health or safety; and where enhanced electrical infrastructure for continuity of operation has been deemed necessary by governmental authority. ° FPN No. 2: For further information on disaster and emergency management see NFPA 1600-2007, Standard on Disnstei/Eniergency Management and Business Continuity Programs. FPN No. 3: For further information regarding performance of emergency and standby power systems, see NFPA 1102005, Standard for Emergency and Standby Power Systems. FPN No. 4: For further information regarding performance and maintenance of emergency systems in health care facilities, see NFPA 99-2005, Standard for Health Care Facilities. 705.130 Overcurrent Protection. C onductors shal l b e protected in ac cordance with Article 240. equip ment and conductors c onnec ted to more than o n e el ec trical source s h all h ave o vercurrent devices located so as to p rov ide protec ti on from all sources. Gen erators shall b e protected in accord ance with 445 .12. FPN No. 5: For specification of locations where emergency lighting is considered essential to life safety, see NFPA 101 °-2006, Life Safety Code° . 705.143 Synchronous Generators. S ynchrono u s generators in a parallel system s h al l b e provided with the ne cessary equipment to estab li s h and m aint ain a sy nchrono u s n di ti o n . FPN No. 7: Threats to facilities that may require transfer of operation to the critical systems include both naturally occurring hazards and human-caused events. See also A.5.3.2 of NFPA 1600-2007. FPN No. 6: For further information on regarding physical security, see NFPA 730-2006, Guide for Premises Security. FPN No. 8: See Annex G for information on Supervisory Control and Data Acquisition. 708.2 Definitions. ARTICL E 708 Critical Operations Power Systems (COPS) FPN: Rules that are followed by a reference in brackets contain text that has been extracted from NFPA 1600-2007, Standard on Disaster/Emergency Management and Bitsiness Continuity Programs. Only editorial changes were made to the extracted text to make it consistent with this Code. 2008 Edition NATIONAL ELECTRICAL CODE Commissioning. The acceptance testing, integrated system testing, operational tune-up, and start-up testing is the process by which baseline test results verify the proper operation and sequence of operation of electrical equipment, in addition to developing baseline criteria by which future trend analysis can identify equipment deterioration. Critical Operations Power Sys tems (COPS). P ower systems for fac i lities or parts of faci l ities th at require continuous operation for the reasons of public safety, emergency management, national sec urity, o r bu s i ness continuity. 70-609 708.3 ARTICLE 708 - CRITICAL OPERATIONS POWER SYSTEMS (COPS) 41 D esi gnat d Critical Operation s Areas (DCOA) . Areas e within a facility or site designated as requiring critical op erations p ower. Sup ervis ory Control and Data Acquisition (SCADA) . An electronic sys tem that provides moni toring and control s for the operation of the critical op erations p ower system. This can include the fire alarm s ystem, security system , control of the HVAC , the start/stop/monitoring of the power suppli es and el ectric al distribution system, annun ciation and communication equipment to emergency p ersonnel , facility occup ants, and remote op erators. 708.3 Application of Other Articles. Except as modified by this article, all applicable articles of this Code shall apply. 708 .4 Risk Assessment. Ri sk assess ment for critical op erations power systems sh all b e documented and shall b e conducted in acc ordance with 70 8.4(A) through (C). FPN: Chapter 5 of NFPA 1600-2007, Standard on Disnstei/ Emergency Management and Business Continuity Programs, provides additional guidance concerning risk assessment and hazard analysis. (A) Conducting Risk Assessment. In critical operation s power systems, ri sk assess ment shall b e p erformed to identify h azards, the likelihoo d of their o ccurrence, and the vulnerabili ty of the electrical system to those hazards. (B) Identification of Hazards. Hazard s to b e con sidered at a minimum shall include, but shall not be limited to, the following: ( 1 ) Naturally occurring hazards (geological , meteorological , and biological ) (2) Human cmi-d [ 1600: 5.3.2] events (accidental and intentional) 708.6. Tes ting and Maintenance. (A) Conduct or Witness Test. The authority having jurisdiction shall condu ct or witness a test of the complete system upon installation and periodi cally afterw ard . (B) Tested Periodically. S ystems shall b e tested p erio dically on a schedule acceptable to the authority having jurisdiction to ensure the s ys tems are maintained in proper op erating c ondition . (C) Maintenance. The authority havi ng juri s di ction sh all require a documented preventive maintenance program for critical operations p o wer systems. FPN: For testing and maintenance procedures, see NFPA 70B-2006, Recommended Practice for Electrical Equipment Maintenance. (D) Written Record. A written record shall b e kept of such tests and maintenance. (E) Testing Under Load. Means for testing all critical power systems during maximum anticipated load conditions shall be provided. FPN: For testing and maintenance procedures of emergency power supply systems (EPSSs) that are also applicable to COPS, see NFPA 110-2005, Standard for Enier•gency and Standby Power Systems. 708.8 Commi ssioning. (A) Commissioning Plan. A commissioning plan shall be develop ed and documented . FPN: For further inform ation on developing a commiss i oning program see NFPA 70B -2006, Recom mended Practice for Elec trical Equipment Maintenance. <.l (B) Component and System Tests. The inst all ation of the equipment shall undergo component and system tests to ensure that, when energized , the system will function properly. (C) Developing Mitigation Strategy. Based on the results of the risk assess ment, a strategy shall be developed and implemented to mitigate the hazards that have not been sufficiently mitigated by the prescriptive requirements of this Code. (C) Baseline Test Results. A set of b aseline test results shall be documente d for comparison with future perio dic maintenan ce testing to identify equipment deterioration . 708 .5 Physical Security. Phys i cal security shall be provided for cri tical op erati ons power systems in accordance with 708.5(A) and (B). (D) Functional Performance Tests. A functional p erformance tes t program sh all be established , documented , and executed up on complete in stallation of the critical sys tem in order to establi sh a baseline reference for future performan ce requirements. (A) Risk Assessment. B ased on the results of the risk assess ment, a strategy for providin g physical security for cri tical operations p ower systems sh all be devel op e d , docu mented , and i mpl emented . FPN: S ee Annex F for more information on developing and implementing a functional performance test program. II. Circuit Wiring and Equipment (B) Restricted Access. Electrical circui ts and equipment for critical operations p ower systems shall be accessib le to qu alified p ersonnel only. 70-610 Ii 708.10 Feeder and Branch Circuit Wiring. (A) Identification. NATIONAL ELECTRICAL CODE 2008 Edition Gip .^r 708.1 4 ARTICLE 708 - CRITICAL OPERATIONS POWER SYSTEMS (COPS) (1) Boxes and Enclosures. All boxes and enclosures (in cluding transfer switches, generators, and p ower p anels) for critical op erations power system circuits shall be p erma•nently marked so they will b e readily identified as a component of the sy stem . (2) Receptacle Identification. The cover plates for the electrical receptacles or the electrical receptacles themselves suppli ed from the COPS shall have a distinctive color or marking so as to b e re adily identifi able. 00 (4) B e a cable listed to maintain circuit integrity for not less than 1 hour when installed in accordance with the lis ting requirement (3) Floodplain Protection. Where COPS feeders are in stalled b elow the level of the 1 00-year fl oo dplain , the circuit condu ctors shall be listed for u se in a w et loc ation and be instal led in a wiring metho d th at is p ermitted for u se in wet locations. (D) COPS Branch Circuit Wiring. (B) Wiring. Wiring of two or more COPS circuits suppl ied from the same source shall b e p ermitted in the same race.way, cable, box, or cabinet. Wiring from a COPS source or COPS source distribution overcurrent protection to critica l lo ads shall b e kept entirely independent of all other wiring and equipment . (a) Outside the D COA. COPS branch circuits in stalled outside th e DCOA shall comply with the physical and fire protection requirement s of 70 8. 10 (C)(1) through (C)(3). (b) With in the DCOA . Any of the wiring metho ds recognized in Ch apter 3 of this Code shall b e permitted within the DCOA. Exception: Where the COPS feeder- is installed in transfer equipment enclosures. 708.11 Branch Equipment. (C) COPS Feeder Wiring Requirements. COPS feeders shall comply with 708.10(C)(1) through (C)(3). (A) Branch Circuit Dis tribution Equipment. COPS branch circuit dis tribution equipment shall b e located within the same DCOA as the branch circuits it supplies. (1) Protection Against Physical Damage. The wiring of the COPS system shall b e protected against physical dam-age. Wirin g methods shall b e p ermitted to b e install ed in accordance with the following: (1 ) Rigid metal conduit, intermedi ate metal conduit, or Type MI cable. (2) Where encased in not less than 50 mm (2 in .) of con-crete, any of the following wiring methods shall be p ermitted : a. S chedule 40 or S chedule 80 rigid polyvinyl chloride condui t (Typ e PVC) b . Reinforce d thermosettin g resin conduit (Typ e RTRC) c . Electrical metallic tubing (Type EMT) d . Flexible nonmetallic or jacketed met allic raceways e. Jacketed metallic cable assemblies li sted for in stal.lation in concrete (3) Where provisions mu st be made for flexibility at equip ment connection , one or more of the following shall also b e p ermitted : a. Flexible metal fittin gs b . Flexible metal condu it with listed fittings c. Liquidti ght flexible metal condui t with listed fitti ngs Circuit and Feeder Distribution (B) Feeder Distribution Equipment. Equipment for COPS feeder circuits (including transfer equipment, transformers, and panelb oards) shall comp ly with (1) and (2). ( 1) B e l ocated in sp aces with a 2 -hour fire resis tance rati ng (2) B e locate d ab ove the 100 -year fl oodpl ain. 708.12 Feeders and Branch Circuits Supplied b y COPS. Feeders and branch circ uits suppli e d by the COPS sh all supply only e quipment specifie d as required for critic al op erations u se. 708.14 Wiring of HVAC, Fire Alarm, Security, Emergency Communications, and Signaling Systems. All conductors or cables sh all b e ins talled using any of the metal wiring methods permitted by 708.1 0 (C)( 1 ) and in addition shall comply with 708.14(1) through 708.14(8) as applicable. (1) S ignal and communication wires shall u se shielded twiste d p airs. (2) Shields of sign al and communication wires shall b e continuous. (3) Fiber opti c cables shal l b e u sed for connections b etween two or more buildings on the property and under single man agement. (2) Fire Protection for Feeders. Feeders shall meet one of the following conditi ons: ( 1 ) B e a l isted electri cal circuit protective system with a minimum 1 -hour fire rating (4) Listed secondary protectors sh all be provided at the terminals of the communication circuits. (2) B e protected by a fire-rate d assembly listed to achi eve a minimum fire rating of 1 hour (3) B e emb edded in not less th an 50 mm (2 in .) of concrete (6) Communications, fire alarm , and sign aling circuits shall u se rel ays with contac t ratings that exceed circuit vo ltage and current ratings in the controlled circu it. 2008 Edition NATIONAL ELECTRICAL CODE ( 5 ) Conductors for all control circuits rated ab ove 50V shall be ins talled with wire rated not less than 600V. 70-611 708.20 ARTICLE 708 - CRITICAL OPERATIONS POWER SYSTEMS (COPS) (7) Riser communication cables shal l be 2-hour fireres istive cable or a lis ted 2-hour electri cal circuit protec tive sys tem . ( 8) Control , monitoring, and power wiring to HVAC sy stems shall be 2 -hour fire-resistive cable or a lis ted 2 -hour electrical circuit protective system . III. Power Sources and Connection 708.20 Sources of Power. (A) General Requirements. Current supply s h all b e such th at, in th e event of failure of th e normal suppl y to th e DCOA , critical operations p ower shall b e available within the time required for the application . The supply system for critic al operation s power, in additi on to the normal servic es to the building and meeting the general requirements of thi s section , shall b e one or more of the types of systems described in 708.20(D) through (H). FPN: Assignment of degree of reliability of the recognized critical operations power system depends on the careful evaluation in accordance with the risk assessment. (B) Fire Protection. Where l ocat ed within a building, equipment for sources of power as des cribed in 708 . 20 (D) through (H) shall b e i nstalled either in sp aces fully protected by approve d automatic fire s uppre ssion s ystems (sprinklers, carbon dioxi de systems, and so forth) or in spaces with a 1 -hour fire rating. ^ (C) Grounding. All sources of p ower shall be grounded as a separately derived source in accordance with 250 . 30 . (2) Power for fuel transfer pumps . Where power is nee ded for the op eration of the fuel transfer pumps to deliver fuel to a generator set day tank, this pump shall be connected to the COPS . (3) Dual Supplies. Prim e movers shall not b e s olely dependent on a publi c utility gas system for their fuel supply or municipal water supply for their co oling systems. Means sh all be provided for automatically transferring from one fuel supply to another where dual fuel supplies are used . (4) Battery Power and Dampers . Where a storage battery i s used for c ontrol or s ignal p ower or as the mean s of starting the prime mover, it shall be suitable for the purp ose and sh all b e equipp ed with an automatic ch arging mean s independent of the generator set . Where the battery charger is required for the op eration of the generator set, it s hall be connected to the COPS . Where p ower is required for the operati on of damp ers used to ventilate the generator set, the damp ers shall b e connected to the COPS . (5) Outdoor Generator Sets . Where an outdoor housed generator set is equipp ed with a readily access ible disconnecting means located within sight of the building or structure suppli ed , an additi on al dis connecting mean s shall not be required where ungrounded conductors serve or p ass through the buildin g or s tructure. (6) Mean for Connecting Portabl e or Vehicle-Mounted Generator. Wh ere th e COPS is s uppli ed by a singl e gena means to connect a portable or vehicle-mounted generator shall b e provided . Exception : Whe re the equ ipment conta ining the main bonding jumpe r or system bonding jumper for the no rma l so u rce and th e feeder wiring to th e transfer equipment are installed in accordan ce with 7081 0(C) an d 708. 11 (B). (7) On-Site Fuel Supply. Where internal combustion engines are use d as the prime mover, an on-site fue l supply shall be provided . The on-site fuel supply shall be secured and protected in accorda n ce with the risk assess ment. (D) Surge Protection Devices. Surge protection devic es shall b e provide d at all facility distribution voltage l evel s. (G) Uninterruptible Power Supplies. Unint erruptible p ower suppli es u sed as the sole source of p ower for COPS shall comply with the applic able provi sion s of 708 .20 (E) and (F). (E) Storage Battery. An automatic battery ch arging means sh all b e provi ded . B atteries sh all b e c ompatible with the charger for that p articular in stallation . For a seale d battery, the container shall not be re quired to be transp arent . However, for the lead acid b attery that requires water addition s, transparent or translucent j ars shall b e furnished . Automotive-typ e b atteries shall not be used . (F) Generator Set. (1) Prime Mover-Driven. G enerator sets driven by a prime mover shall b e provided with means for autom atically starting the prime mover on failure of the normal service. A time- del ay feature permitting a minimum 15 minute setting shall be provided to avoid retransfer in case of short-time reestablishment of the normal source. 70-612 (H) Fuel Cell System. Installation of a fuel cell system sh all meet th e requirement s of Part s II through VIII of Article 692. 708.22 Capacity of Power Sources. (A) Capacity and Rating. A COPS shall have capacity and rati ng for all loads to b e op erated sim u ltaneou sly for contin uous operation wi th variable load ,for an unlimited number of hours, except for req u ired maintenance of the p ower s ource. A p ortable, temporary, or redund ant alternate po wer source shall b e available for u se whenever the COPS power source, is ou t of service-for maintenance or rep air. NATIONAL ELECTRICAL CODE 2008 Ed i tion ARTICLE 708 - CRITICAL OPERATIONS POWER SYSTEMS (COPS) 31 (B) Selective Load Pickup , Load Shedding, and Peak Load Sharing. The altern ate power s ource shall b e p ermitted to supply COPS emergency, legally required standby and option al lo ads where the source has adequ ate cap acity or where automatic selective lo ad pickup and load shedding i s provided as needed to ensure adequate power to (1 ) the COPS and emergenc y circuits, (2) the legally required standby circuits, and ( 3 ) the optional standby circuits, in that order of priority. The alternate power source shall be p ermitted to be u sed for p eak lo ad shaving, provided thes e conditi ons are met . Peak lo ad-shaving operation sh all be p ermitted for satisfying the test requirement of 70 8. 6 (B) , provided all other conditions of 708.6 are met. (C) Duration of COPS Operation. Th e alte rn ate dower ,sou rce _shall be cap able of operating the C OPS for a minimum of 72 h ours at ful l load of D COA with asteady-state voltage within ±1 0 p ercent of nominal utilization voltage. (D) Ventilation. Adequate ventil ation shall b e provided for the alternate p ower source for continued operation under maximum anticip ated ambient temperatures. FPN: NFPA 110-2005, Standardfor Emergency and Standby Power Systems, and NFPA 111-2005, Standard for Stored Energy Emergency and Standby Power Systems, include additional information on ventilation air for combustion and cooling. 708.54 708.30 Branch Circuits Supplied by COPS. Branch circuits supplied by the COPS shall only supply equipment specified as required for critical operations use. IV. Overcurrent Protection 708.50 Accessibility. The feeder- and branch-circuit overcurrent devices shall b e accessible to authorized p ersons only. 708 . 52 Ground-Fault Protection of Equipment. (A) Applicability. The requirements of 708.52 shall apply to critical operations (includin g multiple o ccup ancy buildings) with critical op eration areas. (B) Feeders. Where ground-fault protection i s provided for operation of the service disconnecting mean s or feeder dis connecting means as specified by 230 . 95 or 215 . 10 , an addition al step of ground-fault protecti on shall b e provided in all next level feeder disconnecting means downstream toward the load . Such protection shall con sist of overcurrent devices and current tran sformers or other equivalent protective equipment that c au ses the feeder disconnecting mean s to op en . The additional l evels of ground-fault protection shall not b e installed on electric al s y stems that are not solidly grounded Wye systems with greater than 150 volts to ground but no t excee ding 600 volts phase-to-phase. 708.24 Transfer Equipment. (A) General. Transfer equipment , including automatic transfer switches, shall be automatic and identified for emergency u se. Transfer equipment shall b e designed and installed to prevent the in advertent interc onnection of normal and critical operations sources of supply in any operation of the tran sfer equipment . Transfer equipment and electric p o wer pro duction systems installed to permit op eration in p arallel with the normal source shall meet the requirements of Article 705 . (B) Bypass Isolation Switches. Mean s shall b e p ermitted to byp ass and is olate the transfer equipment . Where bypass isolation switches are u se d , inadvertent parallel operation shall b e avoided . (C) Automatic Transfer Switches. Where u sed with sources that are not inherently synchronized , automatic transfer switches shall comply with ( C)(1) and (C)(2). ( 1 ) Automatic transfer switches sh all b e listed for emergency u se. (2) Automatic tran s fer swi tches sh all b e electrically operated and mechani cally held . (D) Use. Transfer equipment shall supply only COPS load s. (C) Testing. When equipment ground-fault protection is fi rst installed , each level shall be tested to ensure that ground-fault protection i s operational . FPN: Testing is intended to verify the ground-fault function is operational. The performance test is not intended to verify selectivity in 708.52(D), as this is often coordinated similarly to circuit breakers by reviewing tie and current curves and properly setting the equipment. (Selectivity of fuses and circuit breakers is not performance tested for overload and short circuit.) (D) Selectivity. Ground-fault protection for op eration of the service and feeder disconnecting means shal l be fully selective such that the feeder device, but not the service device, shall op en on ground faults on the load side of the feeder device. A six-cyc le minimum separation between the service and feeder ground-fault tripping b and s shall b e provided . Operating time of the di sconnecting devices shall b e considered in selecting the time spread b etween these two b ands to achieve 100 p ercent selectivity. FPN: See 230.95, FPN No. 4, for transfer of alternate source where grou nd-fault protec tion is applied. 708 . 54 Coordination. Critica l operations power system(s) overcun•en t devices sh all be selectively coordin ated with all supply si de overcurrent protective devices. IV V 2008 Edition NATIONAL ELECTRICAL CODE 70-613 708.64 ARTICL E 725 - CLASS 1 , CLASS 2 , AND CLASS 3 REMOTE- CONTROL, SIGNALING, AND POWER- LIMITED CIRCUITS V. System Performance and Analysis 708.64 Emergency Operations Plan. A fac i lity with a COPS sh all h ave doc umented an emergency op eration s p l an . Th e plan shall co n si der emergency operat i on s and resp on se, recovery, and co ntinuity of operati on s. FPN: NFPA 1600-2007, Standard on DisasterlEtnergency Management and Business Continuity Programs, Section 5.7, provides guidance for the development and implementation of emergency plans. ARTICLE 720 Circuit s and E quipment Operating at Less Than 50 Volts /.. 720.1 Sc pe. Thi s arti cle covers in s t all ation s operatin g at volt s, direct current or altern atin g cu rrent. l ess th a n 720.2 Other 'Articles. Direc t current or a l tein atin g-c uffent i nstal l at i o n s operat ing at l ess t h an 50 vo lts , as covered in 4 1 1 .1 thro u gh 44 1 .7; P ar t VI of Artic l e 5 17; Part II o f Article 55 1 ; Parts'V I and III and 552.60(B) of Article 552; 650.1 thr ough 650 $ ; 669.1 through 669.9; Parts I and VIII of Art ic l e 690; Parts '6d III of Artic le 725; or Parts I and III of Article 7 60 sh all not b e required to comply w ith thi s article. 720.3 Hazardous (Classified) Locations. In stal l ati on s within th e scope of this atticle an d i n s t a lled in h azardous (c l ass i fied ) locat i ons shall also co mply w i th the appropriate provi s ion s for h azardou s (c l s ifie d) l ocati on s i n other ap pl icabl e articles of this Co de. 20.11 Mechanical Execution of Work. Circuits operat-7 i at less than 50 v ol ts s h al l b e in s tal led in a neat a w kmanlik e manner. C ables shall be supp orted by e b u i Ving s tru c ture in s u ch a mann er th at the cable Will 4of b e dkmaged by norm al build i n g u se. F^ q ARTICLE 725 ass 1 , Class 2, and Class 3 emote - Control , Signalin g, aid Power-Limited Circuits 1 l[. General 725.1 Scope. This article covers remote -control, signaling, and power-limited circuits that are not an integral part of a device or appliance. .. FPN: The circuits described herein are characterized by usage and electrical power limitations that differentiate them from electric light and power circuits; therefore, alternative requirements to those of Chapters 1 through 4 are given with regard to minimum wife sizes, derating factors, overcurrent protection, insulation requirements, and wiring methods and materials. 725.2 Definitions. Abandoned Class 2, Cla ss 3 , and PLTC Cabl e . Installed C l ass 2, Cl ass 3, an d PLTC cable th at i s no t terminated at e quipment a nd n o t identifi e d for future u s e with a t ag. Circuit Integrity (CI) Cable. Cab le(s) used for re motecon t ro l , sig n al ing, or p ower- limite d system s th at s uppl y cri t i cal ci rcuits to en s ure surv i vabil i ty for co n ti nued c ircu i t operat i o n for a specifi e d ti me u nder fire co ndit io n s. 720.4 Conductors. Co nd uctors shall no t b e small er th a n 12 AW G copp er or equ i val ent. Con ductors for appli ance bran ch c i rcuits s u pp lying more th an o ne appliance or appli ance recep t acl e s h a ll no t b e s maller than 1 0 AWG copper or e q uivalent. Class 1 Circuit. The p orti on of the wi ri ng sys tem between the l oad si d e of the overc u irent device or power-li mi te d supp ly and the c on nec ted e qu ipme nt . 720.5 Lampholders. St a nd ard l amp holders th at h ave a rati ng of n o t l ess th an 660 watts s h a ll b e u se d, Class 2 Circuit. The p ortio n of the wiri ng sys tem be tween th e l oad side of a C l ass 2 p ower source an d th e connected eq uip ment. D u e to its p ower l imitat i o n s, a C l as s 2 c irc uit co n s i ders safe ty fro m a fire initi at i o n s t andpoint an d pro vides ac c ep t ab le pro tecti on from electric shoc k . 720.6 Receptacle Rating. Receptac l es sh a ll ha ve a rating of not less than 15 amperes. 720.7 Receptacles Required. Recep t ac l es of not le ss th an 20-ampere rating shall be provided in kitchens, laundries, and other locations where portable appliances are likely to b&,used. 720.9 Batteries. Installations of storage batteries shall ckply with 480.1 through 480.4 and 480.8 through 480.10. 70-614 FPN: S ee 725 .2 1 for vo lt age and p ower limit ations of C l ass I c i rc uit s. Class 3 Circuit. The p ort io n of the w iring sys tem b etween the load s ide of a Cl ass 3 power source and the connected equ ipment. Due to its power li mitatio n s, a Class 3 circu i t conside s safety from a fi re initiation standpoint . Since higher l ey'el s of vol t age and current t h an for Class 2 are permitted , ad it ional sa feguard s are specified to provide protectio n frornr electri c sh ock hazard th at could be encountered . NATIONAL ELECTRICA L CODE 2008 Edition