Installation Instructions

advertisement
INSTALLATION INSTRUCTIONS
Home Slicker® Plus Typar® and Home Slicker® 10 Plus Typar®
Sheathing
Sheathing
Water Resistive
Water Resistive
Barrier (WRB)
Barrier (WRB)
Vertical
Seam
Couture verticale
R abat de
Typar
WRB
Flap
Home Slicker Plus
Home Slicker
Typar/Home
Slicker 10
Plus Typar
Plus Typar
Home
Slicker
Plus Typar/
Home
Slicker
Plus Typar or
Home
Slicker
10
Plus
Home Slicker 10Typar
Plus Typar
12" wide WRB or
Typar ou papier de construction
Flashing
Tape Behind
ou solin « Peel and Stick » de 12 po
de large Seam
derrière la couture verticale
Vertical
Lap
Over WRB
of
Chevauchement
par-dessus
le rabat Course
de Typar de la bande inférieur
Lower
Cladding
Cladding
Lower
Course
Bande inférieure
1. Install sidewall sheathing material over studs. Install
Home Slicker Plus Typar/Home Slicker 10 Plus Typar
after windows and doors are properly installed and
flashed. Refer to window installation for details on
flashing integration.
2. Roll out Home Slicker Plus Typar/Home Slicker 10 Plus
Typar wherever siding or cladding will be applied with
channels running vertically and the extra water resistive barrier
(WRB) flap on top. (For stucco or stone applications, install
an additional WRB over the exposed channels of Home
Slicker Plus Typar/Home Slicker 10 Plus Typar. Home Slicker
Plus Typar/Home Slicker 10 Plus Typar must roll out
left to right. Nail or staple (min. 1/2" staple) every 3
square feet.
lower course. Optionally, attach flashing tape to the
back of the WRB at the end of each roll. Center the
f lashing so half extends past the roll’s end with the sticky
side out. Butt the next roll and seal onto other half of
flashing. Proceed up the wall. The higher course should
overlap the WRB on the lower course. Butt edges of Home
Slicker matrix together with the WRB lapped underneath
the new roll.
4. Install siding or cladding system over wall surface
within 30 days of Home Slicker application per
manufacturer’s installation instructions. Allow for thickness
of Home Slicker Plus Typar/Home Slicker 10 plus Typar in
nail selection.*Do not overnail.
3. To create a vertical seam between rolls, install a 12"-wide
WRB, such as Typar, behind vertical joint. The bottom of
the flashing should be lapped over the WRB flap of the
2
Home Slicker® Plus Typar® / Home Slicker® 10 Plus Typar®
Application & Architectural Drawings
Installation Instructions ................................................................................ Detail 0508.020B
Top Detail .................................................................................................... Detail 0508.015A
Bottom Detail ............................................................................................... Detail 0508.015B
Corner Detail ............................................................................................... Detail 0508.016B
Window Details:
Flanged Window with WRB Installed After the Window .................... Detail 0508.017B
Non-Flanged Window with WRB Installed After the Window ............Detail 0508.019C
Nail Selection Information............................................................................ Detail 0508.023A
Download