INSTALLATION INSTRUCTIONS Home Slicker® Plus Typar® and Home Slicker® 10 Plus Typar® Sheathing Sheathing Water Resistive Water Resistive Barrier (WRB) Barrier (WRB) Vertical Seam Couture verticale R abat de Typar WRB Flap Home Slicker Plus Home Slicker Typar/Home Slicker 10 Plus Typar Plus Typar Home Slicker Plus Typar/ Home Slicker Plus Typar or Home Slicker 10 Plus Home Slicker 10Typar Plus Typar 12" wide WRB or Typar ou papier de construction Flashing Tape Behind ou solin « Peel and Stick » de 12 po de large Seam derrière la couture verticale Vertical Lap Over WRB of Chevauchement par-dessus le rabat Course de Typar de la bande inférieur Lower Cladding Cladding Lower Course Bande inférieure 1. Install sidewall sheathing material over studs. Install Home Slicker Plus Typar/Home Slicker 10 Plus Typar after windows and doors are properly installed and flashed. Refer to window installation for details on flashing integration. 2. Roll out Home Slicker Plus Typar/Home Slicker 10 Plus Typar wherever siding or cladding will be applied with channels running vertically and the extra water resistive barrier (WRB) flap on top. (For stucco or stone applications, install an additional WRB over the exposed channels of Home Slicker Plus Typar/Home Slicker 10 Plus Typar. Home Slicker Plus Typar/Home Slicker 10 Plus Typar must roll out left to right. Nail or staple (min. 1/2" staple) every 3 square feet. lower course. Optionally, attach flashing tape to the back of the WRB at the end of each roll. Center the f lashing so half extends past the roll’s end with the sticky side out. Butt the next roll and seal onto other half of flashing. Proceed up the wall. The higher course should overlap the WRB on the lower course. Butt edges of Home Slicker matrix together with the WRB lapped underneath the new roll. 4. Install siding or cladding system over wall surface within 30 days of Home Slicker application per manufacturer’s installation instructions. Allow for thickness of Home Slicker Plus Typar/Home Slicker 10 plus Typar in nail selection.*Do not overnail. 3. To create a vertical seam between rolls, install a 12"-wide WRB, such as Typar, behind vertical joint. The bottom of the flashing should be lapped over the WRB flap of the 2 Home Slicker® Plus Typar® / Home Slicker® 10 Plus Typar® Application & Architectural Drawings Installation Instructions ................................................................................ Detail 0508.020B Top Detail .................................................................................................... Detail 0508.015A Bottom Detail ............................................................................................... Detail 0508.015B Corner Detail ............................................................................................... Detail 0508.016B Window Details: Flanged Window with WRB Installed After the Window .................... Detail 0508.017B Non-Flanged Window with WRB Installed After the Window ............Detail 0508.019C Nail Selection Information............................................................................ Detail 0508.023A