Historical Ramp Rate Analysis Augustine Caven Generation Department Special OC Session March 22, 2016 www.pjm.com PJM©2016 Historical Ramp Rate Analysis • • • A 3-month historical analysis of unit ramp rate performance should be performed using actual operations data from January 1 through March 31, 2016. If the generator was not dispatched in the above time range, then use last summer’s actual operations data from June 1 – August 31, 2015. Based on the results of the historical analysis, the following ramp rate parameters in Markets Gateway should be updated: – Default Ramp Rate on the “Unit - Detail” tab in Markets Gateway. Used in DA Market (and in RT SCED only if Segmented ramp rates not entered). – Segmented Ramp Rate on “Unit - Energy Ramp Rates” tab in Markets Gateway. Not used in DA Market, but used in RT SCED if values are entered. www.pjm.com 2 PJM©2016 Criteria for the Historical Analysis • Members should apply the following criteria to further screen the operational data used in their historical analysis: – The unit was considered dispatchable by PJM – i.e. not self-scheduled, testing, taken over by company, cancelled, and other non-dispatchable scheduled on reasons. – The unit did not have “Fixed Gen” status in Markets Gateway, or have its Eco Min = Eco Max. – The unit was operating within dispatchable range, i.e. Eco Min ≤ Output ≤ Eco Max. • Excludes any startup operation or soaking hours prior to a unit being dispatchable – The unit was not assigned either regulation or spinning, and was not responding to a spinning event. – The unit was receiving a “Raise” Economic Base Point from PJM. www.pjm.com 3 PJM©2016 Minute Level Historical Analysis • The minute level historical analysis should be performed by reviewing minute level data samples of unit MW output responses to a raise PJM Base Point signal. • The difference in unit MW output from one minute to the next results in the minute level MW/min ramp rate. • In the example, Unit A exhibited: – Average Ramp Rate of 6.8 MW/min – Maximum Ramp Rate of 10.0 MW/min • Therefore, a ramp rate entered into Markets Gateway between 6.8 and 10 MW/min would be considered acceptable to PJM. www.pjm.com 4 Unit A (Default Ramp Rate) Bid-In Parameters Economic Minimum: Economic Maximum: Default Ramp Rate: Time 9:59 10:00 10:01 10:02 10:03 10:04 10:05 10:06 10:07 10:08 10:09 10:10 10:11 10:12 10:13 *Yellow Shaded Min Ramp Rate: Max Ramp Rate Average Ramp Rate: 100 MW 200 MW 5 MW/min (Full Raise based on 15 min look ahead = 75 MW) MW Output MW/min Ramp PJM Base Point 100 100 100 175 105 5 175 115 10 175 124 9 175 133 9 175 140 7 175 147 7 175 155 8 175 163 8 175 170 7 175 174 4 175 175 1 175 175 0 175 175 0 175 1 10 6.8 PJM©2016 Segmented Ramp Rate Example Unit B (Segmented Ramp Rate) • • For units with segmented ramp rates entered, the minute level historical analysis should be performed for each MW Ramp segment. In the example, Unit B exhibited the following: - Segment 1: Not considered – Start up segment - Segment 2: • • Average Ramp Rate of 5 MW/min Maximum Ramp Rate of 7 MW/min - Segment 3: (Mill Point Segment) • • Average Ramp Rate of 0 MW/min Maximum Ramp Rate of 0 MW/min - Segment 4: • • • • Average Ramp Rate of 12.5 MW/min Maximum Ramp Rate of 17.0 MW/min Segmented Ramp Rate values within the Average and Maximum values for Segments 2, and 4 should be entered in Markets Gateway. For Segment 3, the mill point segment, a non-zero fractional ramp rate should be entered. www.pjm.com 5 Bid-In Parameters Economic Minimum: Bid-In Segmented Ramp Rates: 100 MW Economic Maximum: Segment 1 2 3 4 MW 100 150 153 200 Bid-In Ramp Rate (MW/min) 2 3 0.2 10 Time 9:59 10:00 10:01 10:02 10:03 10:04 10:05 10:06 10:07 10:08 10:09 10:10 10:11 10:12 10:13 10:14 10:15 10:16 10:17 10:18 10:19 10:20 MW Output 100 100 104 110 117 124 130 136 141 145 145 145 148 150 150 150 150 155 167 184 200 200 MW/min Ramp 4 6 7 7 6 6 5 4 3 2 0 0 0 5 12 17 15 - Segment 1 (Start-up) 2 3 4 Historical Segmented Ramp Analysis Min Ramp Rate Max RampRate N/A N/A 2 7 0 0 3 17 200 MW PJM Base Point 100 145 145 145 145 145 145 145 145 145 145 183 183 183 183 183 183 183 183 200 200 200 Average Ramp Rate N/A 5.00 0.00 PJM©2016 12.50 Questions? www.pjm.com PJM©2016