TB: Wiring and Programming of the TPI

advertisement
TECHNICAL
BULLETIN
TB1010-04
Rev. March 4, 2013
Page 1 of 5
Wiring and Programming of the TPI (Turbine Pump Interface) with an FEPetro SCIII (3-Phase Smart Controller)
Overview
The STP-SCIII 3-Phase Smart Controller can be controlled by the INCON TPI via an RS-485 connection.
The TPI can be used to:
• Mimic a syphon system and manage manifolded pumps thru Leveling Mode
• Manage manifolded pumps thru Priority Mode
• Manage the use of the pumps thru Master / Slave mode
• Manage the use of the pumps when alarms occur
110 VAC must be supplied to the hook for the relay to close. The communication signal supplied by the TPI is not enough to
engage the relay. Therefore a Relay module is needed to control a separate 110 VAC source for the hook signals. The AC
Inputs from the dispensers are wired to the TS-ACI AC Input module in the tank gauge and then programmed as inputs to
both the TPI and to the Normally Open Relay. This will allow both the TPI and the Relay to activate at the same time. The
hook signal needs to go to the TS-ACI module in the tank gauge.
The STP-SCIII switches should be set as Slave (Dip Switch 1 off). The T5 programming should be set as Master / Slave.
Doing so will prevent the motor from running continuously when communication is lost to the TPI.
The relay is wired as Normally Open and programmed as inverted. The STP will turn off if the gauge loses power.
Wiring Diagrams
Slave 1
3 PHASE
POWER
SUPPLY
Slave 2
3 PHASE
POWER
SUPPLY
Note: See product installation instructions for
further details. Wiring must conform to all
federal, state, and local codes. Control panels
are for non-hazardous, indoor use only.
FAX/MODEM
BUS EXT
COMM 1
COMM2
TPI
Note: configuration shown is for master/slave operation only. See product
manual for alternating circuit or master/slave, alternating circuit operation
switch settings.
TPI Wiring
If blue thermal
Overload leads
are present, do
not connect to
STP-SCIII
A
If blue thermal
overload leads
are present, do
not connect to
STP-SCIII
(Cap off)
B
Slave 2
A
B
GND
Switch Settings
Note: Switches 4 & 5 set the pump motor horsepower, shown in
drawings above set to 5 hp. See installation and owners manual for
switch settings for other horsepower ratings.
Note: see installation and owners manual for further details of switch
settings and STP-SCIII calibration process.
+
RX
SV
TX
T5 Series Console
To Relay Module
H
RS-485
LON
G
Slave 1
USB
ETHERNET
TECHNICAL
BULLETIN
TB1010-04
Rev. March 4, 2013
SLAVE 1
Relay Module
3 PHASE POWER
SUPPLY
RUN
ERR
Switching Current 2A Max.
Switching Power 1500 VA Max.
L1
L2
L3
Page 2 of 5
SLAVE 2
3 PHASE POWER
SUPPLY
M1
M2
M3
L1
L2
L3
M1
M2
M3
NO8
C8
NC8
NO7
C7
L1
NC7
L2
L3
M1
M2
To STP
M3
L1
L2
L3
M1
M2
M3
To STP
NO6
C6
NC6
NO5
C5
NC5
NO4
}To TPI
C4
NC4
G
NO3
C3
NC3
NO2
Neutral
C2
NC2
NO1
C1
NC1
Incoming Power
Relay Module Wiring: Leveling / Priority
SLAVE
Relay Module
3 PHASE POWER
SUPPLY
RUN
ERR
Switching Current 2A Max.
Switching Power 1500 VA Max.
L1
L2
L3
M1
M2
M3
NO8
C8
NC8
NO7
C7
L1
NC7
L2
L3
M1
M2
M3
To STP
NO6
C6
NC6
NO5
C5
NC5
NO4
C4
NC4
G
NO3
C3
NC3
NO2
C2
Neutral
NC2
NO1
C1
NC1
Incoming 110 VAC Power
Relay Module Wiring: Standalone
}
To TPI
TECHNICAL
BULLETIN
TB1010-04
Rev. March 4, 2013
Page 3 of 5
AC Input
Module
RUN
ERR
Chan
12
Chan
11
Chan
10
Chan
9
Chan
8
Chan
7
Chan
6
Chan
5
Chan
4
Chan
3
Chan
2
Chan
1
Incoming Dispenser
Hook Signal
Incoming Dispenser
Hook Signal
Incoming Dispenser
Hook Signal
AC Input Wiring
Type a descriptive
name for the channel
Automatic Query will
assign the controller
type and address
automatically
All tanks of similar products should
be in the same group
The tank number this pump is listed
in under Fuel Management System
Motor height above the tank bottom
Number of inputs that will be able to
turn on the pump
Set to 0 when there are no other
tanks with the same product
Controllers: Setup
TECHNICAL
BULLETIN
TB1010-04
Rev. March 4, 2013
Page 4 of 5
Name the group
Choose between Leveling
and Priority
Choose if this group uses
Master / Slave configuration
Groups: Setup
Choose if both pumps are
to shut down on a fault
TECHNICAL
BULLETIN
TB1010-04
Rev. March 4, 2013
Page 5 of 5
Name the channel with a
descriptive name and label it
as a relay
Choose submersible pump
Inputs should be set to 0
Relay: Setup
Franklin Fueling Systems • 3760 Marsh Rd. • Madison, WI 53718 USA
Tel: +1 608 838 8786 • 800 225 9787 • Fax: +1 608 838 6433 • www.franklinfueling.com
Download