SECTION 01340 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. 1.02 1. Construction Progress Schedules: Section 01310. 2. Respective Sections of the Specifications requiring submittals: Consult Division 15 and 16 for any additional requirements. 3. The Fairfax County Special Inspections Manual/”Special Inspections: Implementation in Fairfax County” (Edition in force at time of project permit). Review and approval of fabrication and erection submittals as required by the Special Inspections Program. 4. Fairfax County Public Schools Agreement between Owner and Architect, Paragraph A.5i: The Architect shall make available to the Contractor compact disks containing the floor plan backgrounds, reflected ceiling plans and building sections. These electronic files shall be used for preparing submittals which require equipment locations and systems layouts. DESCRIPTION OF WORK A. 1.03 Drawings and General Provisions of the Contract, including General Conditions and other Division 1 through Division 16 Specifications apply to this Section, with special attention to the following: Submit shop drawings, product data and samples required by Contract Documents. SHOP SUBMITTALS A. Identify details by reference to sheet and detail numbers shown on Contract Drawings. B. Sheet size minimum: 8 1/2" x 11"; maximum: 30" x 42". All sheets in one submittal shall be of uniform size. C. Drawings: Submit a minimum of four (4) sets of prints and one (1) reproducible sepia; one (1) set of reproducible sepias shall be returned to the Contractor for reproduction and distribution. Two (2) sets of prints shall be retained by the Owner. For submittals requiring special inspection review, provide additional sets as required by the special inspection manual. 01340-1 11/13 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES D. 1.04 B. Manufacturer's standard schematic drawings. 1. Delete information not applicable to project. 2. Provide additional information applicable to project. Manufacturer's catalog sheets, brochures, diagrams, schedules, performance charts, illustrations and other standard descriptive data: 1. Mark each copy to identify pertinent materials, products or models. 2. Indicate dimensions and clearances required. 3. Indicate performance characteristics and capacities. 4. Indicate wiring diagrams and controls. SAMPLES A. B. C. 1.06 For submittals other than drawings, such as written specifications, maintenance instructions, calculations and catalog data which are capable of xerographic duplicating, provide a minimum of five (5) copies. One (1) copy shall be returned to the Contractor for duplication and distribution. Two (2) copies shall be retained by the Owner. PRODUCT DATA: A. 1.05 SECTION 01340 Office samples shall be of sufficient size and quantity to clearly illustrate: 1. Functional characteristics of product or material with integrally related parts and attachments devices. 2. Full range of color samples. Field samples and mock-ups. 1. Erect at project site at location acceptable to Architect. 2. Construct each sample or mock-up complete. Provide a minimum of three (3) samples unless specified otherwise. Two (2) samples shall be retained by the Owner. SUBMITTALS REQUIRING JURISDICTIONAL APPROVAL A. Certain categories of submittals are required to be reviewed and approved by appropriate jurisdictional authority prior to incorporating into the Work. Make 01340-2 11/13 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES SECTION 01340 such submittals first to the Architect for review, then submit to the approving authority. B. Structural Submittals; to each drawing affix the seal and signature of a Professional Engineer licensed in the State of Virginia, including, without limitation: 1. 1.07 Foundation piles and caissons, reinforced concrete framing systems, structural steel components and framing, steel roof trusses and girders, open-web steel joists, steel deck systems, steel stair railing and guardrail systems, steel ladders, cold-formed metal framing. CONTRACTOR RESPONSIBILITIES A. Review shop drawings, product data and samples prior to submission for conformance to contract requirements. Return non-conforming submittals to originator. 1. Contractor shall stamp each submittal with a stamp bearing the following information: Approved for Construction Approved as Noted Submittal Deviates from Contract Requirements Contractor Date: Review by: Return by: Spec. Section: Submittal No.: Indicate action taken of each submittal by checking appropriate box. If information on stamp is incomplete, submittal will be returned with no action taken. B. Verify: 1. Floor Plan layouts provided by Architect on electronic media. 2. Field measurements 3. Field construction criteria 4. Catalog numbers and similar data. 01340-3 11/13 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 1.08 SECTION 01340 C. Coordinate each submittal with requirements of work and of Contract Documents. D. Contractor's responsibility for errors and omissions in submittals is not relieved by Architect's review of submittals. E. Contractor's responsibility for deviations in submittals from requirements of Contract Documents is not relieved by Architect's review of submittals, unless Architect gives written acceptance of specific deviations. F. At time of submission, note deviations in submittals from requirements of Contract Documents. G. Begin no work which requires submittals unless such submittals have been returned with Architect's stamp and initials or signatures indicating review. H. Distribute copies of submittals to parties concerned. SUBMISSION REQUIREMENTS A. Schedule submissions for receipt by the architect from the date of Notice to Proceed (NTP) as follows: 1. Finish materials and packaged or prefabricated equipment: Maximum of 45 calendar days from NTP. 2. Designed systems (such as, but not limited to, casework, control systems, fire protection special systems window and curtain wall systems): Maximum of 90 calendar days from NTP. 3. Liquidated damages: Liquidated damages shall be assessed for each consecutive calendar day beyond the maximum time periods indicated above. Refer to Section 01010, summary of work. B. Shop Drawings: Submit the required number of prints of each Drawing, including fabrication, erection, layout, and setting drawings until final acceptance is obtained. C. Product Data: Submit copies of manufacturer's descriptive data for materials, equipment and fixtures, including catalog sheets, showing dimensions, performance characteristics and capacities; wiring diagrams and controls; schedules; and other pertinent information as required. Indicate compliance with applicable referenced quality standards. D. Samples: Submit samples specified in product specification sections. 1. Provide full range for color, texture or pattern selection. 01340-4 11/13 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 2. E. Samples shall be marked, tagged, or otherwise identified with name of Contractor, name of project, purpose for which samples are submitted, and date, and be accompanied by letter of transmittal containing similar information, together with specification paragraph number for identification of each item. Submittals shall include: 1. Date and revision dates. 2. Project title and number 3. The names of: a. b. c. d. e. f. 1.09 SECTION 01340 . Architect Contractor Subcontractor Supplier Manufacturer Separate detailer when pertinent. 4. Identification of product or material. 5. Relation to adjacent materials. 6. Field dimensions, clearly identified as such. 7. Specification section number. 8. Applicable standards, such as ASTM number or Federal Specification. 9. Space for Architect's stamp. (3" x 5" min.) 10. Identification of deviations from Contract Documents. RESUBMISSION REQUIREMENTS A. Shop Drawings 1. Revise drawings in accordance with review comments and resubmit as specified for initial submittal. 2. Indicate changes that have been made. Indicate resubmittal status by adding ”R” after the original submittal number. 01340-5 11/13 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES B. 1.10 SECTION 01340 Project Data and Samples: Submit new data and samples as specified for initial submittal. ARCHITECT'S DUTIES A. Review for: 1. Design concept of project. 2. Information given in Contract Documents. 3. Review consultants' shop drawings for coordination with Contract Documents. B. Review of separate item does not constitute review of an assembly in which item functions. C. Affix stamp and initials or signature certifying to review of submittal. D. Return submittals to Contractor for reproduction and distribution. END OF SECTION 01340-6 11/13