BV CPS-I TM E02 Revision: 01 Hi-pot Test Training Reference: UL153 Prepared By: Emily Tang / Ada Ge Approved By: Herbert Zhu Date: Date: Jan.19, 05 For the benefit of business and people “BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”. Training Objectives Training Objective • To understand why do Hi-pot test • To know of basic knowledge of Hi-pot test circuit • To understand operation procedure of Hi-pot test • To understand how to present the result “BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”. 2 Why Why do do High-pot High-pot test test Hi-pot Test Purpose Check the insulation according with safety requirement. “BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”. 3 High-pot High-pot test test circuit circuit Hi-pot test circuit Probe with Hi- pot v L Inspected sample Another probe Current tester Alarm system “BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”. 4 High-pot High-pot test test circuit circuit Explain of Hi-pot test circuit The test equipment include a transformer having a sinusoidal output,for our inspection this voltage is adjusted to the voltage required in protocol. A current tester system is existed in the equipment to calculate breakdown current, for our inspection we must set up limited of breakdown current which is obtained form protocol.when calculated current out of limit, alarm system will cut off voltage output and alarm. “BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”. 5 Operation Operation procedure procedure Equipment: Hi-pot tester “BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”. 6 Verification Operation Operation procedure procedure Verify the equipment Check this tester visually for any physical damage, correctly/promptly connection and suitable power source. Turn the Power Switch to ON, turn the voltage to the lowest position. Press the “Start” button, and set the voltage at a low value. Short circuit the two probes, alert activate, OK. If no alert activate, try to ask the factory change another tester. “BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”. 7 Where need do Operation Operation procedure procedure First internal check product to detect construction and determine where need to conduct Hi-pot test: All accessible metal part ready to become live during normal operation (see note i) Output of transformer or adaptor Assemble gap Note I: normal operation including: a) Replacing a lamp; b) Removal or cleaning of all parts not secured by use of tools “BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”. 8 Setting equipment Operation Operation procedure procedure Setting data Test Voltage Knob Start button Stop button LED display “BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”. 9 Operation Operation procedure procedure Start test Procedure Step A : set up the tester at appropriate breakdown current limit and appropriate voltage(below value for reference only) “BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”. 10 Start test Operation Operation procedure procedure Step B : all of the switch and setting on the sample should be placed at ON and at MAX which appropriate “BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”. 11 Start test Operation Operation procedure procedure Step C : connect live & neutral plug pin or lead wire together to the either polarity of test,otherwise checking should be conducted on each of them. “BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”. 12 Start test Operation Operation procedure procedure Step D : connect opposite polarity of tester to accessible metal part, earth pin or earth lead wire, press start button,then maintain 1 second “BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”. 13 Start test Operation Operation procedure procedure “BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”. 14 Estimation Operation Operation procedure procedure After the test, no breakdown or flashover shall occur; in the meantime pay attention to the voltage displays on Hipot tester to ensure the voltage will not drop down. Alarm Voltage drop down “BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”. 15 Notice Operation Operation procedure procedure Hi-pot test time must keep on 1 second,do not only strike probe on inspected sample. When Hi-pot test is failed at required breakdown current on protocol,try to recheck with max setting of equipment and call back to office. For European product, sometimes different voltage will be applied on product, for example class I product with class II construction, these two type of class need different voltage. Since output voltage of Hi-pot tester is always exceed 1000V, all operation must obey safety rule. “BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”. 16 Safety caution Operation Operation procedure procedure Turn off Hi-pot tester when you need not to use For safety reason, remember to turn off switch before you conduct function check. When you do Hi-pot test,keep any part of you body away form product, especially don’t touch product which being conducted Hi-pot test. “BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”. 17 Safety caution Wrong action Correct action Operation Operation procedure procedure Wrong action Correct action “BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”. 18 How How to to present present the the result? result? If breakdown was found, visual check the product and find the reason (needn’t to open the unit), then record the defect as critical defect. For example: Hi-pot test was failed when test on lampholder at 1200Vac,30mA (max setting of Hi-pot tester) Note: Both workmanship and on site test should be failed on this case. “BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”. 19 END “BUREAU VERITAS PROPRIETARY – copyright Bureau Veritas [2004] – DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT”. 20