Installation/Finish Inspection Form A B C D E

advertisement
Installation/Finish Inspection Form
Phone: 1-800-486-2784
Job Name: ________________
Inspected by: ___________
Fax: 1-631-249-4439
E-mail: service@supermarvin.com
Dealer: ___________________________
Contractor Name: ____________
Date: ___/___/___
Was contractor on site for inspect? Y or N
Before contacting SUPER check ‘Operational Concerns’ by verifying the Installation/Finish is correct.
Look at the REVEALS between the sash/door panel and the frame. Are they even all around?
When reveals are not even around the unit, the reason is usually the installation. Verify all measurements (diagonal-horizontal-vertical).
Next check to see if the product is properly finished and sealed.
If the install / finish were completed according to the Installation Instructions that come with each product, could it be the product itself?
Complete this form to determine if installation or a manufacturing issue. See your Dealer to submit Super’s ‘Service Request Form’.
1. WINDOW or DOOR – Location of Unit: _________________________ Product: _______________________
(Room/first or second floor – cathedral ceiling)
(Call number and/or unit size)
2. Frame Measurements: - Answer ALL questions – Check ALL measurements.
Diagonal Measurements:
Measurement A _________
Measurement B _________
A
A & B must be the same measurement
Horizontal Measurements:
Measurement C _________
Measurement D _________
Measurement E _________
C
D
B
E
C, D&E must be the same measurement
Note: If Glider – C, D, &E are vertical measurements
.
Reveals even?
Is the unit Plumb?
Is the unit Square?
Is the unit Level?
Shimmed?
3. Sill?
Y or N
Y or N
Y or N
Y or N
Y or N
(See notes above for details)
(Is the unit leaning inward or outward from the structure?)
(1/4” out of square can prevent unit from operating as designed)
(Check head and side jambs, interior and exterior plane)
(The jambs should not be bowed in or out)
Level or Crowned?
Properly supported?
Pan installed under sill?
Was the correct adhesive used to hold the sill in place? (Refer to Installation Instructions)
Comments: ________________________________________________________________________
4. Caulked around exterior or back-caulked? YES or NO
Condition of Caulk? __________________
5. How was the Unit Installed? Nailing Fin / Nail Through Casing / Masonry Clip / Other
_____________________________________________________________________________________________
6.
Finished and sealed properly?
Exterior finish? ________
Interior Finish? ________
Are door panels finished? Y or N (Interior, Exterior, tops and sides)
COMMENTS:
______________________________________________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
THANK YOU for correcting ALL installation concerns. See you Marvin Dealer to request the help of a Service
Technician
(8/2003)