2013 Alternative Transmission Development Robert H. Easton March 17, 2004 RMATS Stakeholder Meeting Iterative Process to Finalize Alternatives First priority will be Alternatives 1 and 2, then Alternatives 3 & 4 RAWG TAWG Fine-tune alternatives Identify transmission solutions for each alternative Identify resource additions for each alternative - Iterate with modelers for economics Determine capital costs for new resources - First-pass technical review 2. Congestion and LMPs w/ new resources Determine capital costs for transmission 3. Iterate to define needs 5. Test tx solutions 1. Resource alternatives Modeling Team 4. Provide transmission solutions Determine congestion/LMPs with new resources added - If no new transmission is added and if existing constraints are removed Iterate to define transmission needs (variable cost basis) Test transmission solutions provided by TAWG Critical path to be able to start this modeling ( RAWG) - Decide adjustments, if any, to load forecasts (outside RM); resolve any locational issues for new generation resources; create coal price “buckets” by type of mine; decide transmission solutions for 2008 that should be included in 2013 studies. TAWG Solutions – Alts. 1 & 2 Path Alternative 1 Alternative 1 Line Incremental Improvement (MW) C Wyoming 1-345 kV Reno to DJ Cheyenne 1-345 kV Reno to LRS 700 MW TOT 3 1-345 kV Cheyenne to Ault to Green Valley 1-345 kV Reno to LRS to Ault to Green Valley 1000 MW WY - LRS 1-345 kV DJ-LRS 700 MW TOT 4A 1-345 kV Bridger to Miners to Cheyenne 500 MW Bridger West 1-345 kV Bridger to Midpoint 800 MW Bridger West 1-345 kV Bridger to Naughton to Ben Lomond 1-230 kV Midpoint to Boise 700 MW West of Naughton 345/230 kV at Naughton 500 MW West of Broadview 1-345 kV Colstrip to Reno 1-345/230 kV at Reno 2-345/230 kV at Colstrip 1-345 kV Treasureton to Ben Lomond 1000 MW Alternative 2 162 miles Colstrip Reno Existing 345 kV New 345 kV 70 miles Boise 146 miles DJ 106 miles 345 miles 76 miles Midpoint LRS Treasureton 65 miles Cheyenne Tap 110 miles 120 miles 60 miles Naughton Ben Lomond Bridger Miners Ault 115 miles 70 miles 190 miles Green Valley Alternative 1 & 2 Estimated Costs • Total Line Miles = 1658 • At $500,000/mile for 345-kV construction • Total Est. Cost = $829 million Alternative 3 – Option 1 Transmission Configuration Definition Incremental Increase (MW) Solutions from Alt 1&2 Amps Line – Add a Phase Shifter 230 kV Midpoint to Boise IPP DC Upgrade IPP DC 500 West of Colstrip Colstrip Transformer 500/230 kV Colstrip to Broadview – Increase Series Compensation 500 Montana to Northwest 500 kV Broadview to Garrison tap 500 kV Broadview to Ringling – Increase Series Compensation 500 500 kV Broadview to Hot Springs to Ashe 1000 500 kV Chief Jo to Monroe 1500 500 kV Bridger to Borah Bridger to Midpoint - Convert from 345 kV to 500 kV 1000 500 kV Bridger to Ben Lomond (add as needed) 500 kV Ben Lomond to Midpoint (add as needed) 1000 Idaho to California 500 kV Midpoint to Table Mountain to Tesla 1000 TOT 3 345 kV Reno to DJ to LRS to Cheyenne Tap to Ault to Green Valley 345 kV Reno to LRS 500 TOT 4A 345 kV Bridger to Miners to Cheyenne 500 Rocky Mountain to California SWIP to STEP 1200 Bridger West Ash Hot Springs Great Falls Colstrip Garrison Taft Missoula Ringling Broadview Reno DJ *IPP DC Midpoint Bridger Borah Table Mt. & Tesla Ben Lomond LRS Cheyenne Tap - Series Compensation Ault - Existing - “New” 500 kV - “New” 345 kV Alternative 3 – Option 1 Green Valley Alternative 3 – Option 2 Incremental Increase (MW) Transmission Configuration Definition Solutions from Alt 1&2 Amps Line – Add a Phase Shifter 230 kV Midpoint to Boise IPP DC Upgrade IPP DC 500 Montana to Wyoming Colstrip Transformer 500/230 kV Colstrip to Broadview – Increase Series Compensation 500 West of Colstrip 500 kV Broadview to Garrison tap 500 kV Broadview to Ringling – Increase Series Compensation 500 500 kV Ringling to Borah 1000 Bridger West 500 kV Bridger to Borah 500 kV Bridger to Naughton to Ben Lomond 500 kV Ben Lomond to Borah Convert Borah to Midpoint 345 kV to 500kV 500 kV Borah to Midpoint 1000 Idaho to Northwest 500 kV Midpoint to Grizzly 1000 Utah to Market Place 500 kV Ben Lomond to Mona to Red Butte to Market Place 1000 Idaho to California 500 kV Midpoint to Table Mountain to Tesla 1000 TOT 3 345 kV Reno to DJ to LRS to Cheyenne Tap to Ault to Green Valley 345 kV Reno to LRS 500 TOT 4A 345 kV Bridger to Miners to Cheyenne 500 Rocky Mountain to California SWIP to STEP 1200 Garrison Taft Colstrip Ringling Broadview Missoula Reno DJ To Grizzly Midpoint LRS Borah Bridger *IPP DC Cheyenne Tap Naughton SWIP To STEP Ben Lomond Red Butte Market Place Mona - Series Compensation Ault - Existing - “New” 500 kV - “New” 345 kV Alternative 3 – Option 2 Green Valley Alternative 3 Estimated Costs • Total 345-kV Line Miles = 652 • At $500,000/mile = $326 million • Total 500-kV Line Miles Option 1 = 1780 • At $1 million/mile = $1.8 billion • Total 500-kV Line Miles Option 2 = 2277 • At $1 million/mile = $2.3 billion