Powell Apparatus Service Division P R O D C S O R P U U P P PR RO OD DU UC CTTTS SU UP PP PO OR RTTT PROCEDURE – MP1010 PowlVac Circuit Breaker, “Standard” Mechanism) “Main Trip Prop” Removal and Replacement Procedure The following instructions outline the removal and replacement of “Main Trip-Prop” assembly on PowlVac standard and replacement breakers equipped with standard type “PVS PowlVac stored energy” spring charge mechanisms. This procedure is applicable for all ratings and models of these breakers. Refer to the specific PowlVac Instruction Bulletins for additional breaker details. Important: This procedure does not apply to Powell breakers equipped with “PVCB” or “AT” type stored energy mechanisms. Please refer to applicable Powell instruction bulletins for instructions pertaining to these breaker types. IMPORTANT SAFETY NOTES: All breakers must be removed from service prior to performing any maintenance. Before any adjustments, servicing, parts replacement, or any other act is performed requiring physical contact with the electrical working components or wiring of this equipment, the POWER SUPPLY MUST BE DISCONNECTED. Only qualified personnel should attempt performing maintenance on any power circuit breaker. . WARNING WHEN ANY MAINTENANCE PROCEDURE REQUIRES THE OPENING OR CLOSING OF THE CIRCUIT BREAKER OR THE CHARGING OF ANY OF THE STORED-ENERGY MECHANISM SPRINGS, EXERCISE EXTREME CAUTION TO MAKE SURE THAT ALL PERSONNEL, TOOLS, AND OTHER OBJECTS ARE KEPT WELL CLEAR OF THE MOVING PARTS OR THE CHARGED SPRINGS. FAILURE TO DO THIS MAY CAUSE SERIOUS DAMAGE OR INJURY TO THE CIRCUIT BREAKER OR PERSONNEL. Main Trip Prop Assembly Jack-Shaft Assembly “Open-Close Flag Indicator” Assembly Spring Charge Indicator a. b. c. d. e. f. g. h. i. j. k. l. m. n. Secondary Trip-Prop Adjusting Screw Secondary Trip-Prop Shaft Secondary Trip-Prop Secondary Linkage Roller ”Fundamental Link” Assembly Main Cam Roller Reset Spring Camshaft Main Closing Cam Center-Phase Operating Lever Jackshaft ”Main Trip-Prop” Assembly Main Trip Prop Roller Main Trip Prop Adjusting Screw Main Trip Prop Torsion Spring Figure-1 Standard PowlVac Circuit Breaker Stored Energy Mechanism – (“Main Closing Spring” Removed) Rev. 1, April 17, 2006 - Page 1 of 7 2006 by Powell Electrical Manufacturing Company. All rights reserved. PO Box 12818, Houston, Texas, 77217-2818, 713-944-6900, info@powellservice.com, www.powellservice.com Powell Apparatus Service Division PROCEDURE – P R O D C S O R P U U P P PR RO OD DU UC CTTTS SU UP PP PO OR RTTT MP1010 PowlVac Circuit Breaker, “Standard” Mechanism) “Main Trip Prop” Removal and Replacement Procedure Tools / Materials Required For Performing This Procedure: ⇨ IMPORTANT Open-End Wrench or Ratchet / Socket Set, Tape Measure, Needle-Nose Pliers, Screwdriver Set, E-Clip retaining ring removal tool, Main Trip-Prop Replacement Kit, Copy of applicable PowlVac Circuit Breaker Instruction Bulletin Please carefully review and understand all steps before initiating the procedure. 1. Move the breaker to a convenient, well lighted working location. 2. Unbolt and remove the breaker’s front cover. 3. Remove the main closing spring assembly from the breaker, as-per PASD maintenance procedure MP1009. 4. Unscrew and remove the nameplate / indicator cover plate from the breaker and set aside. 5. Locate the main trip prop assembly at the upper rear center of the mechanism assembly. The main trip-prop shaft runs horizontally through both sides of the mechanism assembly and is secured on each side with E-ring retaining clips. Left and Right Thrust Washers Left Spacer Right E-Ring Retaining Clip Right Spacer Main TripProp Shaft Torsion Spring Left E-Ring Retaining Clip Spring Anchor Main Trip-Prop Assembly Main Trip-Prop; Location and Component Assembly Layout “Replacement” Main Trip Prop Notched ID groove runs across Top Center Plate “Original” Main Trip Prop (Un-Notched Top Center Plate) Identifying Physical Difference between “Original” and “Replacement” Main Trip-Prop Assemblies Rev. 1, April 17, 2006 - Page 2 of 7 2006 by Powell Electrical Manufacturing Company. All rights reserved. PO Box 12818, Houston, Texas, 77217-2818, 713-944-6900, info@powellservice.com, www.powellservice.com Powell Apparatus Service Division P R O D C S O R P U U P P PR RO OD DU UC CTTTS SU UP PP PO OR RTTT PROCEDURE – PowlVac Circuit Breaker, “Standard” Mechanism) “Main Trip Prop” Removal and Replacement Procedure Removal of the original Main Trip-Prop Assembly 6. Locate the left end of the torsion spring. Using pliers pull the left end of the torsion spring off of and around the spring anchor on the right side of the main trip prop assembly. Allow the spring to release and “snap” back against the rear mounting bar. 7. Locate and remove the left E-Clip retaining ring, (“E-Clip”) from the left end of the main trip-prop shaft. Note: The E-Clip on the right end of the main trip-prop shaft does not have to be removed. Rev. 1, April 17, 2006 - Page 3 of 7 2006 by Powell Electrical Manufacturing Company. All rights reserved. PO Box 12818, Houston, Texas, 77217-2818, 713-944-6900, info@powellservice.com, www.powellservice.com MP1010 Powell Apparatus Service Division P R O D C S O R P U U P P PR RO OD DU UC CTTTS SU UP PP PO OR RTTT PROCEDURE – MP1010 PowlVac Circuit Breaker, “Standard” Mechanism) “Main Trip Prop” Removal and Replacement Procedure 8. Using pliers or a screwdriver, slide the main trip-prop shaft towards the right until the right end of the shaft is 2 ¼” from the mechanism right side plate. Remove the left spacer and thrust washer from the shaft and set aside. 2 ¼” ←→ 9. Continue sliding the main trip-prop shaft to the right until the shaft’s right end reaches exactly 3” from the mechanism right side plate. The main trip-prop and right thrust washer can now be removed from the left end of the shaft. Note: The torsion spring and right spacer do not have to be removed from the assembly. Note: The existing main trip-prop is to be discarded after being removed from the breaker. It will not be used again. 3” ←--→ Removal of the existing Main Trip-Prop is now complete. Please proceed to the Installation section on the next page.: Rev. 1, April 17, 2006 - Page 4 of 7 2006 by Powell Electrical Manufacturing Company. All rights reserved. PO Box 12818, Houston, Texas, 77217-2818, 713-944-6900, info@powellservice.com, www.powellservice.com Powell Apparatus Service Division P R O D C S O R P U U P P PR RO OD DU UC CTTTS SU UP PP PO OR RTTT PROCEDURE – PowlVac Circuit Breaker, “Standard” Mechanism) “Main Trip Prop” Removal and Replacement Procedure Installation of the Replacement Main Trip-Prop Assembly Note: The right spacer and torsion spring should still be remaining on the right side of the main trip-prop shaft. 10. Slide the thrust washer removed in the last step back over the left end of the main tripprop shaft. Take the replacement “notched” main trip-prop assembly and position it with the notched groove facing upward and align the shaft bearing hole with the left end of the main trip-prop shaft. Slide the shaft to the left and through the main trip-prop bearing hole until the left end of the shaft is even with the left side of the replacement main trip-prop. 11. Re-position the left spacer and left thrust washer between the left side of the main trip-prop and the left side of the mechanism assembly. Slide the shaft back to the left, through the washer and spacer until the E-clip retainer on the right end of the shaft stops against the mechanism assembly right side. Rev. 1, April 17, 2006 - Page 5 of 7 2006 by Powell Electrical Manufacturing Company. All rights reserved. PO Box 12818, Houston, Texas, 77217-2818, 713-944-6900, info@powellservice.com, www.powellservice.com MP1010 Powell Apparatus Service Division P R O D C S O R P U U P P PR RO OD DU UC CTTTS SU UP PP PO OR RTTT PROCEDURE – PowlVac Circuit Breaker, “Standard” Mechanism) “Main Trip Prop” Removal and Replacement Procedure 12. Install a new E-Clip retaining ring to secure the left end of the main trip-prop shaft at the left side of the mechanism assembly. 13. Push the lower end of the main trip-prop downward until the back side touches the primary trip-prop adjusting screw. Use pliers to pull and re-position the left end of the torsion spring around and to the top of the spring anchor on the right side of the replacement main trip prop. Rotate and release the main trip-prop against the primary trip-prop adjusting screw to confirm smooth, free operation of the assembly, (see Figure-1, item: “l” on page-1 of this procedure). Caution: Failure to position the torsion spring on the top of the main trip-prop spring anchor can result in serious damage to the mechanism assembly when the breaker is operated. Rev. 1, April 17, 2006 - Page 6 of 7 2006 by Powell Electrical Manufacturing Company. All rights reserved. PO Box 12818, Houston, Texas, 77217-2818, 713-944-6900, info@powellservice.com, www.powellservice.com MP1010 Powell Apparatus Service Division P R O D C S O R P U U P P PR RO OD DU UC CTTTS SU UP PP PO OR RTTT PROCEDURE – MP1010 PowlVac Circuit Breaker, “Standard” Mechanism) “Main Trip Prop” Removal and Replacement Procedure 14. Re-install the circuit breaker main closing spring assembly as-per PASD Maintenance Procedure MP1009. 15. Replace the nameplate / indicator cover plate and the circuit breaker’s front cover. 16. The breaker should be manually or electrically tested, (charge, close, and trip) to confirm correct operation. The Main Trip Prop replacement is now complete and the breaker can now be returned to service. END OF PROCEDURE Rev. 1, April 17, 2006 - Page 7 of 7 2006 by Powell Electrical Manufacturing Company. All rights reserved. PO Box 12818, Houston, Texas, 77217-2818, 713-944-6900, info@powellservice.com, www.powellservice.com