Installing a JCS 1200 Power Module

advertisement
Installing a JCS 1200 Power Module
Figure 1 on page 1 shows how to remove and install a power module.
Figure 1: Removing and Installing a JCS 1200 Power Module
To install a power module (see Figure 1 on page 1):
Related Topics
1.
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist and
connect the strap to one of the ESD points on the chassis.
2.
Remove the power module filler, if one is installed.
3.
Make sure that the handle on the power module is in the open position.
4.
Orient the new power module to the selected power module bay:
■
For the upper power module bays, the rear connector on the power module
must be facing down.
■
For the lower power module bays, the rear connector on the power module
must be facing up.
■
Preventing Electrostatic Discharge Damage to the JCS 1200 Platform
■
Removing a JCS 1200 Power Module
■
JCS 1200 Power Module Description
■
JCS 1200 Power Module LEDs
Installing a JCS 1200 Power Module
■
1
2
■
Installing a JCS 1200 Power Module
Download