NOTIFICATION OF TESTING OF STANDBY EMERGENCY GENERATOR AT QMC HOSPITAL CAMPUS Why are we testing the generators? To mitigate against the risk of a total electrical failure within the Hospital it is a Department of Health requirement, written in Health Technical Memorandum HTM 06-01 to undertake regular frequent standby generator testing. Regular systematic standby generator testing ensures that both the generators and the entire standby electrical supply system [the system includes sensing devices; changeover; contactors; cabling; controls etc.] are working properly. In addition, these planned full system load tests also improve staff awareness, understanding and contingency planning in the event of future unplanned electricity power outages. When and where are we doing the tests:Standby Emergency Generator Test is planned for: Tuesday 25th March 2014 West Block Start End COP Floor Areas Affected 8.30 10.30 82 A General Ventilation - West Block Auto Core Laboratory - [Rooms 1118 and 1120 Cooling Units] 08.40 10.40 120 D E Switchboard W/D 1427B [CISCO Systems] ICT Server Rooms ‘WE1’ [Circuit Ref. W1 & W2] 09.00 09.30 99 D Parts of Switchboard and parts of Switchboard Frameroom [COP = Change Over Panel. The number refers to the areas being tested] Should you require plans for full details of area[s] being tested please email Dawn Berehowskyj / Clare Lewin. If you have any queries during this time please call the Control Room mobile number: 07976 190171 What will happen? At the start there will be a short interruption to the electricity supply, of up to thirty seconds, until the generators start. Thereafter ONLY essential electrical supply to your ward or department will be supplied by the generators for the duration of the test. At the end of the test there will be a few seconds interruption to the electricity supply when mains supply is restored. It is important that before the test occurs, you have identified ALL your essential power sockets and that your critical medical equipment is plugged into the essential supply. If you are uncertain about the location of your essential power supply, please contact Gareth Jones, Engineering Manager on extension 66758 for further assistance. Please ensure that each member of your department is aware of the above dates and times as electro-medical and ICT computing equipment could be affected. Note: After both electrical interruptions [start/end] appropriate action should be taken by your operators to check the operational setting of all electro-medical equipment. Generator Testing Letter ~ West Block~25032014 For additional advice / support please call: MESU Helpdesk - Ext. 56646 ICT Helpdesk - Ext. 69000 There is a very small risk that the power will not automatically switch to the generator supply in the “thirty second window” described above, so please ensure that you know your own areas contingency plans to deal with a power failure situation. What if I want to know more? If you have any queries concerning this test please contact:Gareth Jones Engineering Manager – Ext. 66758 Andrew Camina Assistant Head of Estates – Ext. 70495 EFFECTIVE AREA DISTRIBUTION LIST Emergency Planning Andrew Dove Steve Follows Steve Webb All Matrons Silver on Call Ward Sister / Charge Nurses Estates & Facilities Helpdesk ICT & ICT Help Desk Ben Halliday / Donna Osborne Russell Ford / Debbie Taylor Peter Slater / Stephen Ellison Switchboard Sandra Horner Vanessa Woolley Tactical Support Advisors Medical Physics & Clinical Engineering University of Nottingham Mark Bonsall Kishan Jassi Kate Shepherd Julie Hawley Security / Fire Gary Tibbs Paul Nicolls Joshua Snalam Hospedia Joanne Durante Estates Chris Genes Ray Stanton Clive Grimshaw John Harbuz Robert Cooper Bob Slater Geoff Leafe Philip Bolton James Woodward Ronald Stromberg Keith Whitley John Glover James Woodward Estates Mark Jackson Andrew Camina Estates Capital Team Peter Mosek Anthony Snodin Adrian Large Andrew Briggs Peter Williams Martin Cheesman Robert Ford Matthew Griffiths Neil Johnson Henry Wade Mick Wyer Marijka Smith Ged Dean Estates - Shift Technicians Richard Briggs Sean Goode Timothy Gray David Kirk Gary Vernon Christopher Williams Andrew Williamson AutoCore Laboratory Linda Hoyland Karen Jones Generator Testing Letter ~ West Block~25032014 Pneumatic Tube System David Ingram