Power Converter at DESY J-P Jensen DESY Hamburg CAS Power Converter Warrington May 2004 1 DESY Site CAS Power Converter Warrington May 2004 2 DESY Accelerators and Storage Rings CAS Power Converter Warrington May 2004 3 DESY Staff Staff members: 1300 Scientist: 2000 – 2500 a year M-Division: 500 MKK-Group: 100 Machine Power Cooling (Maschine Kraft Kühlung) Power Converter Magnet: 30 Power Converter RF: 8 2 personnel on shift and 3 on call CAS Power Converter Warrington May 2004 4 4000 A and 550 V Units •parallel and serious connection •outdoor oil transformer •cables and water pipes from the ceiling CAS Power Converter Warrington May 2004 5 Thyristor Power Converter Current Voltage Units Circuit 500 A to 12.000 A 100 V to 3600 V 150 B6, B12 and B24, passive and active filter Power part built by industry, DESY specification CAS Power Converter Warrington May 2004 6 HERA Power Converter •water cooling for transformer, choke , SCRs and diodes •no fan •standard interface to electronic •cables and water pipes from the ceiling •separate cabinet for electronic rack CAS Power Converter Warrington May 2004 7 HERA Chopper Power Converter •Diode rectifier for 16 to 32 choppers •Horizontal arrangement •chopper rack •DCCT core and pole reversal rack •Electronic rack for regulation, DCCT electronic and PSC CAS Power Converter Warrington May 2004 8 Chopper and Interlock CAS Power Converter Warrington May 2004 9 HERA Correction Power Converter • 3,5 A and 110 V • Primary switched buck converter • Pole reversal • Two current shunts • Designed in 1986, 600 units • Excellent reliability •Current precision < 10-4 CAS Power Converter Warrington May 2004 10 PETRA III Shut down HERA: July 2007 Construction PETRA 3: July 2007 – October 2008 Start User Facility: Spring 2009 New experimental Hall CAS Power Converter Warrington May 2004 11 PETRA Tunnel PETRA II has aluminum bus bars for 1500 A For the 7/8 ring this bus bar system will be taken again for cost reasons. The experimental hall has to be bypasses by cables. New cabling for the magnets in the experimental area, 1/8 of the ring CAS Power Converter Warrington May 2004 12 Power Converter Main magnets Accuracy ∆I/IN = 1*10-4 (long term stability) Resolution 16 bit Steerers Accuracy ∆I/IN = 5*10-4 (long term stability) Resolution 14 bit CAS Power Converter Warrington May 2004 13 List of Power Converter Typ Voltage Current Power Quantity Prerectifier 130V 2300A 300KW 9 Prerectifier 30V 2300A 70KW 3 SCR-Supply 750V 600A 450KW 3 SCR-Supply 350V 600A 180KW 6 Chopper 100V 600A 48KW 30 Chopper 35V 200A 7KW 100 Chopper 20V 600A 12KW 22 Steerer 35V 15A 0,5KW 360 CAS Power Converter Warrington May 2004 14 RF Power Supply DESY II 50 kV, 18 A 2 units PETRA, DORIS 65 kV, 36 A 5 units HERA 80 kV, 40 A 6 units Feedback 50 kV, 12 A 2 units 10 kV Filter LTTCrowbar 500 MHz Klystron Power Converter CAS Power Converter Warrington May 2004 15 Test Results of LTT-Crowbar kA 7 Crowbar 6 5 4 3 2 Klystron 1 0 0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5 25.0 µs Crowbar operation under load short circuit conditions (Parameter Udc = 10 / 20 / 30 / 40 / 50 / 60 / 70 / 76 kV) CAS Power Converter Warrington May 2004 16 XFEL Project CAS Power Converter Warrington May 2004 17 XFEL Project European project Total costs 670 Mio € Germany gives 50 % Response from the community is good CAS Power Converter Warrington May 2004 18 Tunnel Design 80 cm 125 cm 50 cm 520 cm 190 cm 90 cm 30 cm 210 cm 440 cm Figure 2. Main LINAC, Damping Ring & Electronic Station CAS Power Converter Warrington May 2004 19 XFEL Schedule Planning approval procedure 2005 Start of civil engineering and tunnel construction 2006 Installation in tunnel, beam lines and buildings 2007 -2011 Commissioning 2012 Start XFEL operation 2013 CAS Power Converter Warrington May 2004 20