Lean Article. Support Slides. Slide 1. What We Have Done: People Involved Area Manager Head of Logistics Executive Management Head of Operations Plant Managers Executive Management 4/16/2020 Fußzeile Slide 1 Slide 2. Type and frequency of customer demand and demand flow CS X trucks per day XX - XXX Cylinders # of trucks arriving from customers Prep / Sort Customer and LifeGas Cylinders Customer XX Cylinders XX% WE FS PD LifeGas XX Cylinders XX% Cylinders Filled VGLs XX Cylinders XX% 4/16/2020 Fußzeile O2 Small Pin Index XX Cylinders XX% O2 LIV XX Cylinders XX% O2 Large XX Cylinders XX% Other Gases XX Cylinders XX% Slide 2 Slide 3. Current State: Step 3: Map the current value stream Deliver from Customer Deliver to Customer Customer Office XXX Production Ticket I Range: 0 – 1400 Avg.: 700 Prep 2 FTEs 4/16/2020 Fußzeile Delivery Ticket Production Ticket I Range: 0 – 1400 Avg.: 700 Filling 2.5 FTEs I Range: 0 – 1400 Avg.: 700 Loading 8 FTEs Slide 3 Slide 4. Current State Analysis and Future State Development Create new plant flow and layout of facility — “poke-yoke” (mistake proof) where possible 4 Cylinder Staging 5 Filling 6 Full Cylinders 7 Full Other Gas Cyl 8 Bio-med - Dirty 9 Bio-med Clean 10 Forklift 11 Technical Cabinet 12 Office Ent ry 13 Cylinder Testing 1S 17d 76 ft 15 15 Large O2 Filling 53 ft 88 ft 21 ft 114 ft 6S 6L 1L 104 ft 75 ft 108 ft 42 ft 2a 3a 17b 8b 108 ft 7a 68 ft 10 ft 9a 3b 2b 11 12 58 ft 79 ft 79 ft 16c 15 88 ft 227 ft 13 5 19 135 ft 7b 18 10 16 Hydro Storage 17 Medical excess 18 Nitrous Cage 5 ft 98 ft 14a 14b 1 truck Empty 19 Second Office Full Retest 201 ft 17a 8d 16b 9c 8c 17c 5 22. 04.2010 1 Cylinder Drop Off 2 Prep Area 3 Hydro 4 Cylinder Staging 5 Filling 6 Full Cylinders 7 Full Other Gas Cyl 8 Bio-med - Dirty 14 VGL Filling 15 Large O2 Filling Full Spec Gas Customer Empty M / T / W / T / F / Asset 130 ft 97 ft 29 ft 130 ft Stage 81 ft 16 ft 67 ft 20 ft 5 ft HQAA 45 ft HQAAHQAA HQAAHQAA Asset Hydro 11 Technical Cabinet 12 Office Ent ry 13 Cylinder Testing Future State Houston 20 ft Prep 9 Bio-med Clean 10 Forklift 145 ft 120 ft 105 ft 10 ft 196 ft 9b 8a 82 ft 72 ft 4 16a 227 ft 14 VGL Filling — Standardize processes where possible — Look for opportunities for visual management Current State Houston 10 Lanes — Reduce cross contamination of products where possible 3 Hydro Driver — Eliminate excess distance traveled Cylinder Drop Off 2 Prep Area HQAA Full MH / Asset — Assess where redundancy exists 1 Driver Lanes — Review the current state “spaghetti” diagram Cust.. Cust Pick “Simplify” 16 Hydro Storage 17 Medical excess 18 Nitrous Cage 1 truck 19 Second Office 22. 04.2010 4/16/2020 Fußzeile 18 Slide 4 Slide 5. Measure Current Performance “Easy to Read Fashion” 227ft 184ft Empty Large: 306Ft 233ft Empty Small: 234Ft Full VGL: 227 FT VGL 227 ft Full Large: 184FT Small 234 ft Full Small: 233FT Large 306 ft Empty VGL: 227Ft Texans 25% added to distance due to searching for cylinders since lack of order exists 4/16/2020 Fußzeile Slide 5 Slide 6. What We Have Done: Current State Assessment “5 Ys” 5Ys Overview — Lincoln Memorial Story…. — Provide simple overview of why we will be asking so many questions of the employees “Why 5S Is So Important” 5S Exercise — Paper simulation searching for numbers while 5S is applied to the “workspace” — Physically demonstrates to employees how 5S can reduce workload — Sort / Set In Order / Shine / Standardize / Sustain Day 1 4/16/2020 Fußzeile Day 2 Day 3 Day 4 Day 5 Slide 6 Slide 7. What We Have Accomplished: Before & After Before After — Unorganized and lacking clear placement of product — Excess inventory — Management challenge 4/16/2020 Fußzeile Slide 7 Slide 8. Large Cylinder Storage Before After — Lack of organization — Color coded painting on floor for clear separation — 4/16/2020 Fußzeile Installation of “visual” Kanban using floor coloring Slide 8 Slide 9. What We Have Accomplished: Before & After Before After — Drivers randomly dropping product where space is available — Create prioritization lanes for what to be filled next – visual management — Co-mingled Asset and Customer owned cylinders — Separate Customer owned and Asset cylinders — Add mural and signature board for commitment to the process 4/16/2020 Fußzeile Slide 9