Transport Policy Sub-Committee 10th November 2009 Agenda item 6 TPSC/09/02 Update on Projects Funded 1. Table of Projects An update on the list of projects approved and/or completed since the July meeting is given in the table overleaf as well as associated projects concerning the University. Projects related to the Colchester Cycling Town project are given in agenda item 10. A list of completed projects funded by Transport Funds will be posted on the Estates web pages shortly. 2. Car Parking Income & Expenditure The statement at July 2009 is given in Appendix 1. It covers projects approved for 2008/9, including approved projects from 2007/8 that were carried over for implementation in 2008/9 (valued at £68,000). Works on the cycle storage at Loughton were completed in July with credit in that period being recharged in August. This accounts for the anomaly in the credit figure for this project. Funds approved by TPSC for transport related schemes for 2008/9 were £159,000. Also included are the two major capital projects approved for 2009/10 that were set up (re-modelling of car park B and the cycle route to Rayleigh Square) in 2008/9 and should be completed by the end of this calendar year. A further project approved by USG on the recommendation of TPSC was the external signage for car parking (£20,000) that includes the signage for the new car parking management system. In addition, following the approval by Committee at the last meeting to endorse the action to guarantee the continuation of the Dr Bike services for the next two academic years, the University was able over the summer to procure these services for £4,950 per annum, albeit higher than anticipated. Details of the service being provided are in the project update table overleaf and available on the Essex BUG website. It has not been possible to produce a comprehensive financial report at this juncture with the new Transport Policy Coordinator starting and the work entailed in installing the new car parking management system together with other initiatives at the start of term. A more detailed financial report will be presented at the next meeting alongside the figures for Colchester campus staff and student car parking registrations (as a proportion of Colchester campus staff and student populations) and consideration then given to funding of other projects. The next financial statement will also include the final confirmed costs for the majority of the transport projects. Transport Policy Sub-Committee is requested to note this report and to approve the variation in costs for the provision of Dr Bike services for the next two years. Jo Leyland Transport Policy Coordinator UPDATE ON PROJECTS FUNDED Installation Notional cost/(£) Actual cost/(£) Comment August 2009 15,000 12,696 Location by bus stop in front of Quays Accomodation office. September 2009 36,000 36,100 Easter 2009 2,000 1,915 Increased passenger safety by moving bus stop (in accordance with Atkins Safety Check report) and assists in speed reduction on Boundary Road Constable Building parking and lining of bays infront of Wivenhoe House Hotel carried out instead. 1,000 0 Transport Projects 2008/9 Quays bus stop South Courts bus stop traffic calming Car Sharing Bays Transport Policy Sub-Committee 10th November 2009 Agenda item 6, TPSC/09/02 Litter Bins Not undertaken Cctv for car park 'A' and power the 2 P&D machines (10 & 11) Easter 2009 10,000 10,465 Replace obsolete cameras & cabling in car park 'B' and Valley car park 2009/10 15,000 0 Installation of drop kerbs for bus stands & pedestrian footways Completed September 2009 12,000 2,235 Cycle shelter for outer row of sheffield stands under Square 5 with surveillance system September 2009 11,000 10,360 Expansion of cycle storage on top of boiler house roof Improve cctv cycle storage surveillance Bus seats for Boundary Road bus stands July 2009 10,000 9,053 July 2009 5,000 0 July 2009 6,650 2,769 September 2009 35,000 23,015 Zebra crossing improves pedestrian access and ramped crossing contributes to speed reduction on Boundary Road. July 2009 10,000 3,993 17 racks fitted at Loughton and match funding of £1,310 provided for installation of 8 racks at Southend campus with Southend Borough Council delivering and paying 50% costs of racks. Pedestrian crossing linking public footpath to Wivenhoe with campus path Cycle storage at Loughton Cabling works undertaken and P&D machines now operating on mains power, including machine 14 for Sports Centre and University users. Cabling component undertaken and included in car park ‘A’ improvements. Further CCTV camera works in car parks awaiting appointment of Security Manager. Drop kerbs and pedestrian crossing on Valley Road installed. Crossing improves pedestrian safety by Under Podia area as well as enabling disabled access to bus stands. Shelter and surveillance system installed and cycle access created by fire road barrier for those accessing the cycle storage from the Wivenhoe direction. Cycle storage capacity on Rayleigh Square now increased to 192, accessed by the new Rayleigh Route due for completion December. Camera installed under square 5within cycle shelter project. BUG requested cycle surveillance funds to be allocated for provision of Dr Bike services. In situ and provided through EMS rather using Ollerton bus seats which were unsuitable. 2 UPDATE ON PROJECTS FUNDED Installation Notional cost/(£) Cost to date/(£) Comment October 2009 92,000 94,122 December 2009 78,000 Car parking spaces increased by 41 although pedestrian marking to be undertaken in Spring to improve pedestrian passage through car parks and additional spaces will reduce to 32. Sports Centre have not proposed a dual ticketing system for external sports centre visitors. Scheme to be completed by December and planned to provide good access to cycle storage on Rayleigh Square. However, October 2009 20,000 From October 2009 From October 2009 – June 2011 TBA Transport Projects 2009/10 Re-modelling of Car Park B Cycle route from Boundary Road to Rayleigh Square External signage for car parking Traffic Officer costs Dr Bike Services Associated Transport Infrastructure Projects Transport Policy Sub-Committee 10th November 2009 Agenda item 6, TPSC/09/02 Installation 4,950 p.a. Signage for enforcement of new car parking management system with Liberty installed. Revisions made to University car park signage and lining. Further minor amendments to correct ambiguities scheduled. One Traffic Officer in post full-time. Second officer commencing 3rd week November. Patrol officer overtime also included. Services to be provided twice weekly termtime between April & October inclusive, and once weekly termtime from November to March. Comment Wayfinding survey and project 2010/11 Study completed and signage being phased in. ECC provision of travel information points on Squares being incorporated into Calibra Wayfinding contract and totems. Knowledge Gateway Infrastructure 2010/11 Gateway access will improve University access for pedestrians and cyclists with signalised junction. Gateway infrastructure may provide opportunity for bus turnaround with likelihood of improved services and lower carbon footprint for University generated traffic. Wivenhoe junction of Boundary Road Long term maintenance recurrent works Estates (EMS) have thrice reported the deterioration in the road surface at the junction to the Highways Agency who have cited lack of funds to fix it. In September EMS advised that it was dangerous and requested works to be carried out as a matter of urgency. ongoing Issues have been addressed that were identified by Atkins in their full review of campus road infrastructure including recommendations related to compliance with national standards. Recommendations were incorporated into South Courts bus stop traffic calming. Ongoing programme of road repairs & footpath repairs on campus. Jo Leyland Transport Policy Coordinator 3 UPDATE ON PROJECTS FUNDED APPENDIX 1 Transport Policy Sub-Committee 10th November 2009 Agenda item 6, TPSC/09/02 University of Essex Transport Policy Sub-Committee Car Parking Income and Expenditure Statement at July 2009 October 2009 £ £ Income Pay & Display Income 187,281 Car Registration Via Payroll 7,928 Student standard car registration 1,675 Barrier controlled student registration 6,770 Cash And Cheque Paid By Staff 32,778 Barrier Controlled Staff 34,855 External Support Income Departmental Visitors Permits 107 5,542 Total Income 276,936 Staff Cost Senior Support 21,300 Non Staff Cost General Support - Training 495 EMS Programmed Services 9,659 Car Park - Expenditure Tools & Equipment 5,632 19,913 Travel & Subsistence Training Internal 3,088 Membership Dues 5,000 Sustainable Transport Events and Training 2,728 1,600 Upheld clamping fees Depreciation 555 17,834 Sub-Contracted Services: Woodland Services Student Union Sundries Total Non staff 14,402 5,389 622 86,916 Total Expenditure 108,216 SURPLUS 168,720 4 UPDATE ON PROJECTS FUNDED APPENDIX 1 Transport Policy Sub-Committee 10th November 2009 Agenda item 6, TPSC/09/02 University of Essex Transport Policy Sub-Committee 2008-9 Transport Related Projects Funded by Car Parking Income at 31st July 2009 October 2009 Approved Projects Annual Budget £ Year to July Actual Variance £ £ % Car Sharing Bays North Towers - Motorcycle Shelter 2,000 14,000 1,866 14,225 134 -225 7 -2 Quays Bus Stop Bus Stop Central Island Road Works 15,000 36,000 0 36,100 15,000 -100 100 -0 1,000 0 1,000 100 97 Litter Bins & North Towers Overflow Car Park Improvements 5,000 150 4,850 CCTV for Car Park A and Power 2 P&D Machines 10,000 10,465 -465 -5 Replace Camera's in Car Park B and Valley Car Park 15,000 0 15,000 100 Installation of Drop Kerbs 12,000 2,235 9,765 81 Cycle Shelter for outer row of Sheffield stands 11,000 16,948 -5,948 -54 Traffic calming on Boundary Road 80 10,000 2,013 7,987 Sweeping of cycles are students depart 1,000 1,057 -57 -6 6 Ollerton bus seats for Boundary Road bus stands 6,650 2,769 3,881 58 Recalibrate P & D machines for occasional users 8,000 7,614 386 5 Re-align zone car park area - North Towers 1,000 500 500 50 Power 4 P & D machines at North Towers 20,000 18,297 1,704 9 Pedestrian Crossing for Wivenhoe Footpath 35,000 23,015 11,985 34 Expansion of cycle storage on top of boiler house roof 10,000 0 10,000 100 Cycle storage at Loughton 10,000 -4,722 14,722 147 Re - Modelling of Car Park B 92,000 11,071 80,929 88 Cycle Route from Boundary Road to Rayleigh Square 78,000 730 77,270 99 392,650 144,333 248,317 63 5