Rev 5 – Preliminary SLAC HEP Budget Meeting Summary Discussion Charts S. M. Kahn, D. B. MacFarlane, R. Alva SLAC Budget Briefing with OHEP Staff: March 3, 2009 Page 1 Outline of Presentation * Statement of SLAC PPA Vision and Near-Term Priorities for Operating Programs, and New Projects. – Addresses Laboratory role, strengths and strategic goals and program objectives. * Scenario A, (B, C) – – – – B&R Reallocation Summary Sheet High Level Summary 2009-2011 Detailed year-by-year breakouts Summary Budget Spreadsheet * Backup Material on Individual Programs – ATLAS, EXO-200 and EXO, LSST, JDEM, SuperB, Theory, Accelerator Development, ILC SRF, PEP-II D&D, Detector R&D Test Beam. Budget Briefing with OHEP Staff: March 3, 2009 Page 2 SLAC Vision for Particle Physics and Astrophysics * Maintain a leading role at the Energy Frontier through enhanced participation in ATLAS, the current LHC machine, and their planned upgrades, and through leadership of R&D for the ILC and associated detector concepts. * Become the lead laboratory within the DOE-SC complex for particle astrophysics and cosmology, and for non-accelerator physics generally. (KIPAC, FGST, LSST, JDEM, EXO, GeODM, AGIS, CMB). * Maintain strong partnerships at the Intensity Frontier through facilitating US participation in an international SuperB Project, and through supporting the design and development of the Project X facility. * Become the lead laboratory within the DOE-SC complex for electron accelerator research. Play a stewardship role for accelerator physics across disciplines within the Office of Science. Develop key innovations and technologies for future high-gradient accelerators. Budget Briefing with OHEP Staff: March 3, 2009 Page 3 SLAC Near-Term Priorities for Particle Physics and Astrophysics: Operating Programs * Continue to facilitate the optimal exploitation and preservation of the BaBar dataset. – – * Support necessary computing infrastructure through the completion of the intense and steady analysis phases Facilitate transition into the archival phase, and ensure that the BaBar data remain accessible to a broad community. Operate the LAT for FGST, and continue to spearhead scientific discovery with this unique particle astrophysics observatory. – – Support the operations, software development, and instrument support functions of the LAT, as performed by the ISOC. Maintain a vigorous LAT-based scientific analysis program at SLAC. * Play a significant role in ATLAS and LHC accelerator commissioning, initial science analyses, and computing support. * Maintain world-leading accelerator-science program – World-leading programs in beam physics theory, advanced computation, and accelerator design. Budget Briefing with OHEP Staff: March 3, 2009 Page 4 SLAC Near-Term Priorities for Particle Physics and Astrophysics: Operating Programs * Maintain a crucial, enabling role in technology development for the ILC. – – – * L-band rf. Electron source. Final focus and IR design. Lead high-gradient X-band research in the US. – Establish the fundamental limits to acceleration gradient and the optimal design of rf structures. * Maintain world-leading theoretical programs in particle physics and particle astrophysics and cosmology. * Plan and execute the orderly D&D of the BaBar detector and the PEP-II facility. Budget Briefing with OHEP Staff: March 3, 2009 Page 5 SLAC Near-Term Priorities for Particle Physics and Astrophysics: New Programs * Bring LSST into development as a joint NSF-DOE project. – – – * Lead the design and development of the LSST camera. Participate in the data management, with particular emphasis on new tools for handling and querying the extremely large database. Shepherd the involvement of the HEP community in this exciting dark energy experiment. Play a major role in the upgrade of the ATLAS detector and the LHC – – – – ATLAS Phase 1: Insertable B-layer project. ATLAS Phase 2: Tracker and TDAQ upgrades. Enhancement of ATLAS computing at SLAC. Extend LHC contributions to include fabrication of upgrade collimators, development of PS2 design, and LLRF and feedback improvements. * Construct and operate FACET for forefront experiments in beam-driven plasma wakefield acceleration. * Participate in JDEM construction, development, and science analyses. – – – Provision of warm electronics for one or more of the focal plane instruments. Possible role in fine guiding. Participation in weak lensing and strong lensing science investigations. Budget Briefing with OHEP Staff: March 3, 2009 Page 6 SLAC Near-Term Priorities for Particle Physics and Astrophysics: New Programs * Develop and construct a ton-scale version of EXO for the initial suite of mid-scale experiments at DUSEL. – – * Complete operation and testing of EXO-200. Perform the necessary R&D and engineering for full-EXO. Facilitate a significant US role in SuperB in Italy. – – – Provide components from PEP-II to reduce the cost of SuperB construction. Play a leadership role in the machine design and construction. Develop and coordinate participation in the SuperB detector collaboration. * Participate in Project-X R&D with contributions to rf power systems. * Perform state of the art experiments in laser dielectric acceleration. * Develop high power X-band rf sources to optimally exploit high gradient structures. * Initiate and maintain R&D efforts to a enable a SLAC leadership role in longer-range programs: – SiD, GeODM, and AGIS Budget Briefing with OHEP Staff: March 3, 2009 Page 7 SLAC HEP Budget Meeting Update Modified Scenarios B and C S. M. Kahn, D. B. MacFarlane, R. Alva SLAC Budget Briefing with OHEP Staff: March 3, 2009 Page 8 Modified Scenario B Description FY 2008 FY 2009 Mod. FY 2010 FY 2011 2009 -2015 FY 2012 FY 2013 FY 2014 FY 2015 Core Programs $ 60,865 $ 61,181 $ 62,780 $ 64,665 $ 66,605 $ 68,604 $ 70,663 $ 72,782 B Factory Ops/D & D $ 35,994 $ 12,907 $ 11,034 $ 10,010 $ 9,496 $ 9,330 $ 9,330 $ 9,330 Projects /LHC /ILC/Other $ 6,568 $ 21,464 $ 17,312 $ 24,248 $ 25,675 $ 31,113 $ 44,566 $ 34,032 SLAC Total $ 103,427 $ 95,552 $ 91,126 $ 98,923 $ 101,776 $ 109,047 $ 124,559 $ 116,144 366 349 345 SLAC FTEs* 341 347 353 353 353 * does not include Projects or SciDAC * High Level Impacts – – – – – – – – – Maintains present core research staffing levels with no need for reductions through attrition. BABAR D&D as planned; PEP-II D&D delayed until 2012. LSST ramp-up, assume $1.5 M (FY10) and $3M (FY12) of PED funding. EXO concept only developed at the 200 kg level. Reduced electron research program due to BABAR falloff; reduced SuperB involvement, & small ongoing ILC detector R&D studies. Continue growth of ATLAS, leading to SLAC role on ATLAS Phase 1 IBL and TDAQ ATLAS upgrades with BNL as lead; continue effort on LHC accelerator commissioning and upgrades. Accelerator science program as planned. Develop test beam and X-band rf source proposals for future funding consideration. Project X & JDEM warm electronics role commensurate with additional funding from lead labs and/or other agencies. Budget Briefing with OHEP Staff: March 3, 2009 Page 9 Modified Scenario B * Strategic Priorities: What scientific objectives and targets are being addressed? – – – – * Maintain leadership in current electron accelerator physics, but future direction in doubt without clear path for SuperB and ILC physics programs. Establish SLAC as the lead laboratory in particle astrophysics and cosmology for DOE-SC, although prospects for development of future underground program unclear. Continue leadership role at the Energy Frontier through an enhanced role in ATLAS and ongoing development of the ILC. Play a stewardship role for accelerator physics across disciplines within the Office of Science. Develop key innovations and technologies for future high-gradient accelerators. What major accomplishments have been or will be achieved? – – – – – * 2009 -2015 BABAR Intensive and Steady analysis supported. FGST support and science exploitation. LSST executed as a major DOE contribution to the project. Enhanced ATLAS role enabled, including upgrade contribution. FACET implementation and development of acc science novel concepts. Significant issues and concerns – – – No provision for full EXO as part of initial suite of DUSEL experiments. No provision for US contribution to SuperB if project proceeds on projected timescale. No provision for industrialization of SC RF 1.3 GHz sources. Budget Briefing with OHEP Staff: March 3, 2009 Page 10 Modified Scenario B Description Delta FY09-FY08 FY 2008 FY 2009 Mod. CR % Change $ 61,181 1% Core Programs $ 60,865 $ B Factory Ops/D & D $ 35,994 $ Projects /LHC /ILC/Other $ 6,568 $ 14,896 SLAC Total $ 103,427 $ (7,875) $ 95,552 SLAC FTEs* 366 316 2009 (23,087) $ 12,907 $ 21,464 (17) 349 -64% 227% -8% -5% * does not include Projects or SciDAC * High level impacts – No further attrition in core staff. ATLAS growth continues, electron reduced and reduced Super B involvement; some attrition in Theory. * Priorities: What scientific objectives and targets are being addressed? – As previously noted. * What accomplishments have been or will be achieved? – In addition to previously noted, LSST CD-1, R&D for full EXO and SuperB concept development. – FACET starts construction and acc science ramps-up according to plan. – JDEM warm electronics and Project X role commensurate with external funding. * Significant issues and concerns – Accelerated FACET construction funded from stimulus package will be challenging. Budget Briefing with OHEP Staff: March 3, 2009 Page 11 Modified Scenario B Description FY 2008 FY 2009 Mod. CR Delta FY10-FY09 FY 2010 % Change $ 62,780 3% Core Programs $ 60,865 $ 61,181 $ B Factory Ops/D & D $ 35,994 $ 12,907 $ (1,873) $ 11,034 -15% Projects /LHC /ILC/Other $ 6,568 $ 21,464 $ (4,152) $ 17,312 -19% SLAC Total $ 103,427 $ 95,552 $ (4,426) $ 91,126 -5% 366 349 SLAC FTEs* 1,599 2010 (4) 345 -1% * does not include Projects or SciDAC * High level impacts – – – * Priorities: What scientific objectives and targets are being addressed? – * As previously noted. What accomplishments have been or will be achieved? – – – – – * Reduction of 4 FTEs in B Factory Ops; BABAR D&D continues as planned, but not yet able to start of PEP-II D&D Project line: LSST ramp-up assumes ~$1.5 M of PED funding in 2010, with FACET construction ending. PED funding for ATLAS phase 1 upgrade with BNL as lead. BABAR Intensive analysis winds down and transitions to Steady analysis. ATLAS IBL design effort achieves CD-1. LSST proceeds to CD-2. Finish FACET construction, ramp-up PWFA and laser accelerator science as planned. JDEM warm electronics and Project X role commensurate with external funding. Significant issues and concerns – Briefing with OHEP among Staff: March 3, 2009 projects. Page 12 Some competition forBudget people and resources construction Modified Scenario B Description FY 2008 FY 2009 Mod. CR FY 2010 Delta FY11-FY10 Core Programs $ 60,865 $ 61,181 $ 62,780 $ B Factory Ops/D & D $ 35,994 $ 12,907 $ 11,034 $ Projects /LHC /ILC/Other $ 6,568 $ 21,464 $ 17,312 $ 6,936 SLAC Total $ 103,427 $ 95,552 $ 91,126 $ 7,797 366 349 345 SLAC FTEs* 2011 1,884 FY 2011 % Change $ 64,665 3% (1,023) $ 10,010 -9% $ 24,248 40% $ 98,923 9% 341 -1% (4) * does not include Projects or SciDAC * High level impacts – – – – * Priorities: What scientific objectives and targets are being addressed? – – * As previously noted. Moving ATLAS phase 1 upgrade and LSST projects through CD reviews into the construction phase. What accomplishments have been or will be achieved? – – * Another 4 FTE reduction in B Factory Ops; BABAR D&D and PEP-II maintenance at ~$6.5M, but resources are insufficient to start PEP-II D&D until 2012. Project line increases by ~$7M due to: LSST ramp-up (assuming $3M of PED funding for FY2011), the first fulll year of FACET operations, and an additional $1M investment to replace aging KIPAC computing equipment. Construction funding for ATLAS phase 1 upgrade with BNL as lead. Continue planned Accelerator Science growth. As previously noted. BABAR Steady analysis ongoing. Significant issues and concerns – Budget Briefing with OHEP Staff: March 3, 2009 Phasing of new initiative development schedules. Page 13 B&R KA1202011 KA1202011 KA1202012 KA1202012 KA120201 Description Accelerator Operations: PEPII MMS Accelerator Operations: PEP II D&D Detector Operations Babar D&D B-factory Operations Total Control KA120102 KA130102 KA140102 KA150102 KA150102 KA1502011 KA150302 FY 2010 Modified 1,970 583 3,226 4,374 10,153 FY 2011 2,030 600 2,872 4,428 9,930 35,994 0 35994 39 12,907 -4,009 16,916 35 11,034 (3,386) 14,420 25 6,254 35 7,178 92 22,669 40 7,725 43,825 8,610 ST B Factory B-factory Complex Total KA110102 24,144 FY 2009 Modified 1,913 566 3,867 4,181 10,527 FY 2008 15,534 Core Research FTEs Proton Research ops FTEs Electron Research ops FTEs Non-Accelerator Research ops FTEs Theoretical Research ops Core EPP Research 3,200 8,899 15,757 7,300 35,156 Core Technologies R&D FTEs National Lab Accel Science National Lab Accel Science EQU FTEs General Accel Development FTEs National Lab Detector Development Core Technologies R&D 9,201 11,232 5,276 25,709 FTEs ST KA1102054 KA1102053 KA1502021 KA120103 KA130102 KA140103 KA140104 9,250 9,250 31 10,010 730 9,280 37 9,496 246 9,250 43 9,330 80 9,250 43 9,330 80 9,250 43 9,330 80 9,250 30 7,419 30 6,389 92 23,349 39 7,756 44,913 35 8,717 25 5,506 92 24,049 38 7,789 46,061 40 10,079 20 4,571 92 24,771 37 7,823 47,243 44 11,301 16 3,788 92 25,514 37 8,058 48,661 44 11,640 16 3,902 92 26,279 37 8,300 50,121 44 11,989 16 4,019 92 27,067 37 8,549 51,625 40 9,802 300 18 4,052 13 3,203 17,356 41 10,096 300 18 4,173 13 3,299 17,868 42 10,599 309 18 4,298 13 3,398 18,604 43 11,117 318 18 4,427 13 3,500 19,362 43 11,450 328 18 4,560 13 3,605 19,943 43 11,794 338 18 4,697 13 3,713 20,542 43 12,147 348 18 4,838 13 3,824 21,157 263 263 263 263 263 263 263 0 0 8,000 0 8,000 LHC R&D Program ATLAS Operations LHC Support (LARP) LHC R&D Program Total FTEs 668 1,405 2,073 ILC R&D Lab ILC Accel R&D ILC R&D Total FTEs Other University Service Accounts National Lab Research EQU Lab SciDAC Research Theory Other Other Total FTEs Projects/LHC/ILC/Other FTEs: w/o Research Projects or SciDAC SLAC HEP Total FTEs: SLAC HEP Total w/o R Projects & SciDAC 62,780 5,311 57,469 9,250 66,605 5,636 60,969 68,604 5,806 62,798 70,663 5,981 64,682 72,782 6,160 66,622 2,000 3,446 3,000 6,000 9,000 5,000 6,000 11,000 10,000 6,000 16,000 23,000 6,000 29,000 12,000 6,000 18,000 622 1,467 2,089 6 641 1,511 2,152 6 660 1,556 2,216 6 680 1,603 2,283 6 700 1,651 2,351 6 721 1,701 2,422 6 743 1,752 2,495 6 3,670 3,670 11,300 11,300 41 11,639 11,639 41 11,988 11,988 41 12,348 12,348 41 12,718 12,718 41 13,100 13,100 41 13,493 13,493 41 69 31 - - - - 1,446 - 44 75 0 1,000 44 1,044 0 21,464 47 17,312 47 95,552 349 91,126 345 702 54 825 0 44 75 0 6,568 103,427 31 64,665 5,472 59,193 9,250 FY 2015 9,250 0 0 0 0 0 LSST MIE EXO R&D FACET: MIE FACET: Ops Research Projects Total FY 2014 9,250 61,181 5,386 55,795 Control KA1301032 KA1301032 KA1501041 KA1501041 SLAC FY 2013 5,000 1,500 2,916 9,416 60,865 0 60,865 Core Programs FY 2012 - 44 44 0 44 44 0 44 44 0 44 44 0 24,248 47 25,675 47 31,113 47 44,566 47 34,032 47 98,923 341 101,776 347 109,047 353 124,559 353 116,144 353 Budget Briefing with OHEP Staff: March 3, 2009 Modified Scenario B detail Page 14 Modified Scenario C Description FY 2008 FY 2009 Mod. PB FY 2010 FY 2011 FY 2012 2009 -2015 FY 2013 FY 2014 FY 2015 Core Programs $ 60,865 $ 62,740 $ 64,571 $ 66,494 $ 68,488 $ 70,544 $ 72,661 $ 74,841 B Factory Ops/D & D $ 35,994 $ 14,169 $ 15,480 $ 16,030 $ 13,046 $ 9,330 $ 9,330 $ 9,330 Projects /LHC /ILC/Other $ 6,568 $ 22,624 $ 24,910 $ 38,178 $ 49,255 $ 62,507 $ 84,873 $ 70,672 SLAC Total $ 103,427 $ 99,533 $ 104,961 $ 120,701 $ 130,789 $ 142,381 $ 166,864 $ 154,843 366 360 383 394 384 372 372 372 SLAC FTEs* * does not include Projects or SciDAC * High Level Impacts – Expands Scenario B to include full-scale EXO and significant US role in SuperB. • • – – – Begin full EXO in FY2013, as part of the initial suite of experiments at DUSEL, with PED in FY2011-2012, construction start in FY2013 and SLAC as lead. Begin SuperB as a new construction project starting in FY2012, with PED in 2011, assuming investment in detector and accelerator by US community with SLAC as lead. Exploit core data management capability developed for BABAR to enable enhanced ATLAS Analysis Facility. Assume funding to construct test beam for detector R&D program (2009 and 2010), Assume successful competition for accelerator development funding • • X-band rf sources, $9M over 5 years to develop viable rf source. TT60 High Radiation Test Facility, $1M to provide beam dump and window by end of CY2010. Budget Briefing with OHEP Staff: March 3, 2009 Page 15 Modified Scenario C * 2009 -2015 Strategic Priorities: What Scientific objectives and targets are being addressed? – A program at this level is commensurate with the full vision we articulated for PPA at SLAC. * What Major accomplishments have been or will be achieved? – Enhanced ATLAS role enabled, including major upgrade contribution. – BABAR Intensive and Steady State analysis supported; D&D completed in a timely way. – SLAC and US community provide crucial leadership for SuperB project in Italy, with BABAR and PEP-II components and major new hardware contributions. – FGST support and science exploitation. – LSST executed as a major DOE contribution to the project. – FACET implementation and development of Acc Science novel concepts. – Full EXO developed as a major component of the initial program at DUSEL. * Significant issues and concerns: – Phasing of various construction remains a significant challenge. Budget Briefing with OHEP Staff: March 3, 2009 Page 16 Modified Scenario C Description * % Change $ 62,740 3% $ 60,865 $ B Factory Ops/D & D $ 35,994 $ Projects /LHC /ILC/Other $ 6,568 $ 16,056 SLAC Total $ 103,427 $ (3,894) $ 99,533 366 1,875 FY 2009 Mod. PB Core Programs SLAC FTEs* Scenario B + Delta FY09-FY08 FY 2008 2009 (21,825) $ 14,169 $ 22,624 (6) 360 -61% 244% -4% -2% * does not include Projects or SciDAC High level impacts – Expand the scope of FACET to include the double sail boat configuration. – Initial $0.75M funding for test beam facility based on proposal * Priorities: What scientific objectives and targets are being addressed? – Continue development of full EXO and SuperB for consideration in later years. * * What accomplishments have been or will be achieved? – FACET construction accelerated. – Test beam design completed and construction started. Significant issues and concerns – FACET cost estimates yet to be baselined and confirmed. Budget Briefing with OHEP Staff: March 3, 2009 Page 17 Modified Scenario C Description Scenario B + FY 2008 FY 2009 Mod. PB Delta FY10-FY09 2010 FY 2010 % Change Core Programs $ 60,865 $ 62,740 $ 1,830 $ 64,571 3% B Factory Ops/D & D $ 35,994 $ 14,169 $ 1,311 $ 15,480 9% Projects /LHC /ILC/Other $ 6,568 $ 22,624 $ 2,286 $ 24,910 10% SLAC Total $ 103,427 $ 99,533 $ 5,428 $ 104,961 5% 366 360 383 6% SLAC FTEs* 23 * does not include Projects or SciDAC * High level impacts – Remaining $0.75M funding for test beam facility based on proposal * Priorities: What scientific objectives and targets are being addressed? – Moving full EXO R&D forward and continuing to develop US role on SuperB. * What accomplishments have been or will be achieved? – Complete test beam and begin operations. – Begin new accelerator development projects. * Significant issues and concerns – Potential competition for resources as multiple construction projects ramp-up. Budget Briefing with OHEP Staff: March 3, 2009 Page 18 Modified Scenario C Description Scenario B + * – – Delta FY11-FY10 FY 2011 % Change Core Programs $ 60,865 $ 62,740 $ 64,571 $ 1,923 $ 66,494 3% B Factory Ops/D & D $ 35,994 $ 14,169 $ 15,480 $ 550 $ 16,030 4% Projects /LHC /ILC/Other $ 6,568 $ 22,624 $ 24,910 $ 13,267 $ 38,178 53% SLAC Total $ 103,427 $ 99,533 $ 104,961 $ 15,740 $ 120,701 15% 366 360 383 11 394 3% SLAC FTEs* * does not include Projects or SciDAC PED funding for full EXO ~$1.9M for 2011 assuming construction starts in FY13. PED funding for SuperB $2.4M for the detector and $3.3M for the collider, assuming construction starts in FY12. Strengthen data analysis capability with the ATLAS Analysis facility: $1.5M for equipment and $1.2M operational support, ramping to 7 FTEs in 2012. Additional $1M (non-core) for general accelerator development. Moving full EXO and SuperB from development into construction. What accomplishments have been or will be achieved? – – – * FY 2010 Priorities: What scientific objectives and targets are being addressed? – * FY 2009 Mod. PB High level impacts – – * FY 2008 2011 EXO and SuperB proceed to CD-1. Begin development of ATLAS Analysis Facility. Continue accelerator development projects. Significant issues and concerns – Briefing with OHEP Staff: March 3, 2009 Aggressive program Budget for current workforce. Page 19 B&R KA1202011 KA1202011 KA1202012 KA1202012 KA120201 Description Accelerator Operations: PEPII MMS Accelerator Operations: PEP II D&D Detector Operations Babar D&D B-factory Operations Total ST B Factory B-factory Complex Total Control FY 2007 36,400 FY 2008 15,534 23,946 8,610 60,346 24,144 FY 2009 Modified President Proposal 1,913 1,000 3,867 5,009 11,789 78,496 0 78496 35,994 0 35994 SLAC FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 9,250 Modified Scenario C FY 2015 7,000 3,226 4,374 14,600 9,250 2,872 3,828 15,950 9,250 1,500 2,216 12,966 9,250 9,250 9,250 9,250 9,250 43 14,169 -2,747 16,916 61 15,480 1,060 14,420 67 16,030 6,750 9,280 55 13,046 3,796 9,250 44 9,330 80 9,250 44 9,330 80 9,250 44 9,330 80 9,250 264 264 264 264 263 263 263 Core Research FTEs ST Core Programs Control Research Projects KA1301032 LSST MIE KA1301032 EXO R&D KA12010 - ** Super B Detector - PED KA1301032 JDEM* warm electronics KA12 IBL (FYI only…SLAC not the lead) KA15020 - ** Super B Collaider - PED KA1501041 FACET: MIE KA1501041 FACET: Ops Research Projects Total KA1102054 KA1102053 KA11 KA11 LHC R&D Program ATLAS Operations LHC Support (LARP) ATALS Analysis Facilities EQU ATALS Analysis Facilities Ops LHC R&D Program Total FTEs ILC R&D Total FTEs KA120103 KA130102 KA140103 KA140104 KA1502011 KA1502011 Other University Service Accounts National Lab Research EQU Lab SciDAC Research Theory Other General Accel Development- Non Core General Accel Development- Non Core -EQU Other Total FTEs 48,569 0 48,569 60,865 0 60,865 62,740 6,945 55,795 0 0 0 0 0 0 0 0 0 0 0 0 7,200 0 7,200 7,113 100 8,659 180 898 668 1,405 622 1,467 1,078 2,073 2,089 6 641 1,511 2,152 6 660 1,556 1,500 1,208 4,924 11 680 1,603 2,300 1,750 6,333 13 700 1,651 2,300 1,803 6,454 13 721 1,701 2,300 1,857 6,579 13 743 1,752 2,300 1,912 6,707 13 16,716 3,670 10,460 37 10,774 37 11,097 37 11,430 37 11,773 37 12,126 37 12,490 37 193 69 - - - - Projects/LHC/ILC/Other FTEs: w/o Research Projects or SciDAC 702 54 927 825 18,721 6,568 1,446 31 31 66,494 7,301 59,193 3,000 1,860 2,400 3,300 1,205 6,000 17,765 0 44 2,000 0 2,075 10 44 3,000 250 3,325 15 1,000 44 3,348 0 4,392 15 21,824 53 24,910 58 38,178 63 680 54 64,571 7,102 57,469 - 68,488 7,519 60,969 70,544 7,746 62,798 72,661 7,979 64,682 74,841 8,219 66,622 5,000 4,020 5,000 10,000 10,720 5,800 23,000 20,360 5,800 12,000 20,360 5,500 7,800 6,180 28,000 7,800 6,365 40,685 6,750 6,556 62,466 3,050 6,753 47,663 44 3,448 0 3,492 15 44 3,551 0 3,595 15 44 3,658 0 3,702 15 44 3,768 0 3,812 15 49,255 65 62,507 65 84,873 65 70,672 65 142,381 372 166,864 372 Budget OHEP104,961 Staff: March 2009 145,786Briefing 103,427 with98,733 120,701 3, 130,789 SLAC HEP Total FTEs: SLAC HEP Total w/o R Projects & SciDAC 360 383 394 384 Page 20 154,843 372 What is next with the budget * As previously mentioned, with the exception of FACET the 2009 and 2010 budgets are very consistent with current level of spending. Thus what you should expect is : – – – – * Mid Year Check-Point – – * Minor or no changes to your budget. But there will be some major re-bucketing in the “DOE - HEP B&R codes”, that may mean new charge numbers for your group. Potentially more granularity in our tracking by project, particularly in KIPAC. Please support these changes working with your Financial Planner. We have already started our Mid year checkpoint, during this and next month. One of the Financial Planners will be meeting with you to review your budget and current level of spending This is a good time to correct spending trends to avoid overspending, but also to ensure that the right people and services get charged to the correct accounts. Your financial planner will be working with you. Specifically if you are new to owning a budget. – – – There is an overview training that should answer most of your questions, about finance and budget management . You are encouraged to attend. The training will be held at Kavli 3rd Floor Conference Room, next Wednesday (3/25) from 10:00-11:30 am. You can sign-in via SLAC web. Budget Briefing with OHEP Staff: March 3, 2009 Page 21