Project Management Terry A. Ring Chemical Engineering University of Utah Waterfall Style of Project Management Waterfall Style of Project Management with Recycle Loop Agile Project Management • Agile methodologies are proven to be 3x more successful than traditional waterfall methodologies and 2x faster Estimating – Hours for Deliverables • Scope of Work/Schedule Development • 10 hrs for PFDs • 10 hrs for Process Simulations & Equipment Data Sheets • 5 hrs for P&IDs • Development of Process Design Basis • 20 hrs for PFDs • Includes • Plant Wide Control System • Major Components of Safety System • 10 hrs for Process Simulations • 10 hrs for P&IDs • PFDs • 20 hrs for PFD Development • 4 hrs/PFD for PFD Review • 4 hrs/PFD for Materials of Construction Breaks Estimating – Hours for Deliverables • Scope of Work/Schedule Development • 10 hrs for PFDs • 10 hrs for Process Simulations & Equipment Data Sheets • 5 hrs for P&IDs • Development of Process Design Basis • 20 hrs for PFDs • Includes • Plant Wide Control System • Major Components of Safety System • 10 hrs for Process Simulations • 10 hrs for P&IDs • PFDs • 20 hrs for PFD Development • 4 hrs/PFD for PFD Review • 4 hrs/PFD for Materials of Construction Breaks Estimation • Process Simulations • 2x PFD hours • Includes • • • • H&MB Tables for PFDs Utilities Summary Feed and Effluent Summaries Could Increase for: • Startup, Shutdown, Overdesign, Underdesign, Summer, Winter Operations, Impurity Dispositions • P&IDs • • • • • 80 hrs per Inside BL P&ID 40 hrs per Outside BL P&ID 20 hrs per Outside BL P&ID 8 hrs per Demolition P&ID In-house reviews • 6 P&IDs per day for Design Team • Reviews at 50% and 100% complete Estimation • Process Simulations • 2x PFD hours • Includes • • • • H&MB Tables for PFDs Utilities Summary Feed and Effluent Summaries Could Increase for: • Startup, Shutdown, Overdesign, Underdesign, Summer, Winter Operations, Impurity Dispositions • P&IDs 10% • • • • • 80 hrs per Inside BL P&ID 40 hrs per Outside BL P&ID 20 hrs per Outside BL P&ID 8 hrs per Demolition P&ID In-house reviews • 6 P&IDs per day for Design Team • Reviews at 50% and 100% complete Estimating • Equipment List & Data Sheets • 4 hrs. for Equipment List Formating • Pumps & Compressors • 6 hrs each on PFD • 12 hrs each on P&ID • Vessels/Tanks/Towers • 4 hrs each on PFD • 12 hrs each on P&ID • Reactors • 8 hrs each on PFD • 24 hrs each on P&ID • Heat Exchangers/Fin-Fans • 4 hrs each on PFD • 8 hrs each on P&ID • Fired Heaters • 16 hrs each on PFD • 24 hrs each on P&ID • Engineering Support for Vendor Requests and Non ChEs • 30% of Hrs for Equipment List & Data Sheets • Process Data for Piping • 5% of Total P&ID hours 6 Hours for AIChE Project using Aspen/ProMax Equipment Data Sheets Estimating AIChE Cost Estimation – 6 hrs • Process Data for Process Instrumentation • 2 hrs for each instrument • 2 hrs for each Process Control Loop • Process Safety Valve Design • Assume 1 PSV per vessel • 4 hrs per PSV • Support for Cost Estimation • Done by the Cost Estimation Team • 5% of Hrs for Equipment List Items for PFD Items • 5% of Hrs for Equipment List Items for P&ID Items • HAZOP Analysis • Review of 4 P&IDs per day • 2 process engineers, 8 hrs/day Estimating Supervision • Supervision and Coordination • 10% of a Process Engineering hrs for PFD development • 5% of a Process Engineering hrs for P&ID development • 5% of Process Engineering hrs for • • • • Equipment List and Data Sheets Piping Data Instrumentation PSV Designs AIChE Project add 10% of total project time for Communication • Documentation/Data Books/Reports • 5% of PFD hours • 2% of P&ID hours • Contingency • + 10% of Total PFD hours • + 10% of Total P&ID hours