REQUEST FOR PROPOSALS CONSTRUCTION MANAGER AT RISK SERVICES WITH GUARANTEED MAXIMUM PRICE (GMP) (for Major Projects only) TABLE OF CONTENTS Document/Section/Title Notice to Proposers / Request for Qualifications for Construction Manager at Risk with Guaranteed Maximum Price Request for Proposals for Construction Manager at Risk with Guaranteed Maximum Price 1 Introduction 2 RFP Contents 3 Project Description 4 Project Schedule 5 Scope of Construction Manager’s Services 6 Preconstruction Phase 7 Construction Phase 8 CM Selection Process 9 Technical Proposal Requirements 10 Fee Proposal Requirements 11 Project Award and Commencement 12 Miscellaneous 13 Classification of Project Costs – Table A Appendices 1 2 3 4 Service Agreement for Preconstruction Phase Services Agreement Forms for Construction Phase: Agreement (2 pages), Form #702.01CM Payment Bond, Form #702.09CM Performance Bond, Form #702.15CM Certification (Award), Form #702.03CM Subcontractor Directory, Form #702.04S Notice to Proceed, Form #702.16 Contract General Conditions for Construction Manager at Risk with Guaranteed Maximum Price Projects Sample Forms [Use forms from http://www.calstate.edu/cpdc/CM/forms/ unless noted otherwise. Use forms provided as part of the RFP that are denoted “RFP copy”.] 4.1 Forms to be submitted with Fee Proposal Package in response to the RFP Fee Proposal Form (RFP Copy), Form #700.05CM Certification (Bid), Form #702.03 Noncollusion Affidavit, Form #701.05 Small Business Preference and Certification Request, Form #701.09 Certification of Appropriate License and California Co., Form #701.08 Bid Proposal Form Signature Page, Form #701.06 4.2 Forms Used by University to Identify Winning Proposer Technical Proposal Evaluation Score Sheet (RFP Copy) Abstract of Fee Proposals, Form #701.01.CM 4.3 Forms Used by University in Awarding Preconstruction Services Agreement (See Appendix 1) Payee Data Record, Form #STD204 Revised June, 2013 - Page 1 of 2 pages Table of Contents Request for Proposals for Construction Manager at Risk Services With Guaranteed Maximum Price (GMP) 4.4 5 6 7 8 9 10 11 12 13 14 Forms to be Used by CM during Trade Bid Process / Submittal of GMP CM Letter to CSU Warranting Construction Documents (RFP Copy) Trade Contractor Prequalification Documents (RFP Copy) List of Trade Contractors for CM at Risk Projects, Form #701.04A-CM DVBE Forms: DVBE Transmittal, Form #DVBE-T DVBE Summary of DVBE Participation, Form #DVBE-1 Bidder’s Certification re: DVBEs-Status of Subs/Suppliers, Form #DVBE-2 DVBE Declarations, Form #STD843 DVBE Subcontractor Activity Report, Form #DVBE-AR (to be submitted at end of project) 4.5 Forms Used by University in Awarding Construction Agreement (See Appendix 2) 4.6 Forms for Use during Construction Site Survey and Acceptance, Form #702.08 Contractor’s Construction Waste and Recycling Plan, Form #0115A Contractor’s Building Demolition Waste and Recycling Plan, Form #02060A Subcontractor Directory, Form #702.04S Fair Employment Practices Compliance Report, Form #702.18 Time and Material Daily Log, Form #702.26 Report of Injury, Form #702.10 Field Instruction, Form #702.22 Request for Information (RFI), Form #702.29 Cost Request Bulletin, Form #702.20 Hourly Labor Rate Worksheet, Form #703.33 Change Order Request Summary (CM), Form #703.34 Change Order Request Summary (Trade Contractor), Form #703.34S Change Order, Form #703.04 Contractor/CM Payment Request, Form #702.12 Schedule of Values for Construction Manager at Risk, Form #702.21CM Uniformat Building Systems Breakdown by Discipline, Form #702.21A Request for Payment of Materials on Hand, Form #702.17 Contractor’s Reuse, Recycling, and Disposal Report, Form #01151B Bldg Demo: Contractor’s Reuse, Recycling, and Disposal Report, Form #02060B Request for Special Inspection, Form #702.23 Inspection Request, Form #702.24 Guarantee Quality and Performance, Form #702.19 Notice of Completion, Form #702.02 Punch List, Form #702.07 Contractor Performance Evaluation, Form #703.13 Supplementary General Conditions (RFP Copy) Division One (RFP Copy) CSU Procedure Manual for Capital Projects, available at: http://www.calstate.edu/cpdc/ae/pro-serv-agree/documents/Procedure_Manual.pdf Prevailing Wage Rates (RFP Copy) CSU Project Architect/Engineer Agreement Documents for CM at Risk Projects, available at: http://www.calstate.edu/CPDC/ae/pro-serv-agree/cm-risk.shtml Project Summary, Architectural Plans and Elevations and Maps (RFP Copy) Geotechnical Report (RFP Copy) OCIP Insurance and Safety Manuals (for project $10 million or greater), available at: http://www.calstate.edu/cpdc/CM/OCIP.shtml CEQA Mitigation and Monitoring Program (RFP Copy) Design-Build and Design-Assist Subcontracting Revised June, 2013 - Page 2 of 2 pages