CONTRACT CHANGE ORDER NO. P N

advertisement
PROJECT
PROJECT NO.
CONTRACTOR
CONTRACT NO.
ARCHITECT
DATE
CONTRACT CHANGE ORDER NO.
Note: Give complete description of work. The documents supporting this Change Order, including any drawings and estimates of cost, are referenced hereon and made a part hereof. (Reference change proposal
number, cost request bulletin number, field instruction number, change order request number, and any other documents as applicable. A copy of each shall be attached to the Trustees’ copy of this Change Order.)
C C F C
P R I O
# B # R
#
#
Description
Extra
Credit
Days
Ext.
1. Contractor does forever release and discharge Trustees, their successors, assigns, officers,
employees, attorneys, agents, consultants and each of them from any and all claims, demands,
controversies, causes of action, obligations, liabilities, expenses, costs, attorneys’ fees and damages of
whatever nature or character and of any kind, whether in law or equity, whether past, present or future,
whether known or unknown, suspected or unsuspected, now possessed or hereinafter acquired,
arising out of or related in any way to the Contract or the Project.
2. Subject to the provisions of paragraph 3 below, the Trustees do forever release and discharge
Contractor, its successors, assigns, officers, employees, attorneys, agents, consultants and each of
them from any and all claims, demands, controversies, causes of action, obligations, liabilities,
expenses, costs, attorneys’ fees and damages of whatever nature or character and of any kind,
whether in law or equity, whether past, present or future, whether known or unknown, suspected or
unsuspected, now possessed or hereinafter acquired arising out of or related in any way to the
Contract or the Project.
3. The Trustees reserve and do not release the other party from any of the following claims:
a. Claims arising from unknown, latent deficiencies in design, workmanship or materials installed in
the Project or pursuant to the Contract;
b. Claims arising from warranty or guaranty obligations stated in the Contract;
c. Claims for indemnity and/ or contribution arising from suits or claims for personal injury or
property damage asserted against the Trustees;
d. Claims arising from an audit conducted pursuant to Article 4.01(d) of the Contract.
In connection with the releases set forth above and except as provided in paragraph 3 above,
Contractor and Trustees each waive all rights under the provisions of California Civil Code Section
1542. That statute states: “A general release does not extend to claims which the creditor does not
know or suspect to exist in his favor at the time of executing the release which if known by him must
have materially affected his settlement with debtor.”
TOTALS
$0
$0
0
$0
$0
0
I hereby certify upon my own personal knowledge that budget funds are available for this encumbrance.
ACCOUNTING OFFICER
Date
Net Extra........$0
or
APPROVAL RECOMMENDED
ARCHITECT
Date
Net Credit.......$0
CONTRACTOR AGREEMENT
The undersigned hereby agrees to the above-described amendment of the contract.
(Legal firm name of Contractor)
SIGNATURE
Title
Calendar days time extended: 0
COPIES TO:
Date
Note: The Contractor's name shall be as listed on the contract. All signatures must be signed in ink.
TRUSTEES’ APPROVAL
APPROVED ($0 TO $20,000)
Title
Date
APPROVED ($20,001 TO $100,000)
Title
Date
APPROVED ($100,001 +)
Title
Date
•
•
•
•
•
•
Construction Administrator
Contractor
Architect/Engineer
University
CSU Accounting
Project Manager or
Construction Inspector
Construction Mgmt.
703.04.2 • 1/08