Title of the Project:
Key Words:
(Please provide a maximum of 5 key words that describe the project.)
Group Members
Seat No Role Name Contact Number Email
Group
Leader
Mem.
Mem.
Mem.
First Advisor (Must Choose from Respective Faculty):
Name:
Designation:
Second Advisor (May be from NED or outside):
Name:
Designation:
Company:
PEC Number:
Contact:
Email:
Is this Project Funded : Yes / No (circle one)
If Yes; Provide following details
No. Sponsoring Organization Amount Duration
Project Status(Please mark
)
⊡ New
⊡ Extension/Modification to previous Project (Specify)
Nature of Project (Please mark all that apply
)
⊡ Study (need approval from chairman)
⊡ Simulation based
⊡ Hardware based
Project Description( Use separate sheets for description )
A. Scope of the Project:
<type here>
B. Introduction:
B1. Project Background and Literature Review:
(Detailed summary of what all has been done internationally in the proposed area quoting references and bibliography. Please note that this section demonstrates the depth of knowledge of the project team and builds the confidence of the evaluators about capability of the team in achieving the stated objectives.)
<type here>
B2. Current State of the Art:
(Please describe the current state of the art specific to this research topic.)
<type here>
C. Challenges:
(Please describe the challenges, specific to this research topic, currently being faced internationally.)
<type here>
D. Motivation and Need:
(Please describe the motivation and need for this work.)
<type here>
Objectives and Deliverables (300 words)
E. Specific Objectives Being Addressed by the Project:
(Please describe the measurable objectives of the project and define the expected results. Use resultsoriented wording with verbs such as ‘to develop..’, ‘to implement..’, ‘to research..’, ‘to determine ..‘, ‘to identify..’ The objectives should not be statements and should not include explanations and benefits. The objective should actually specify in simple words what the project team intends to achieve (something concrete and measurable/ deliverable). Fill
only those objectives that are applicable to the proposed project.)
<type here>
F. Key Milestones and Deliverables:
(Please list and describe the principal milestones and associated deliverables of the project. A key milestone is reached when a significant phase in the project is concluded, e.g. selection and simulation of algorithms, completion of architectural design and design documents, commissioning of equipment, completion of test, etc.)
The information given in this table will be the basis of project monitoring and marks assignment to the project group. (Add rows as per need)
No. Elapsed time from start (in months) of the project
1.
2.
Milestone Deliverables
Beneficiaries
{Here specify communities directly and indirectly benefiting from this project. State; who and how (use bullets)}
Project Management(150 words + Gantt Chart)
{Break your work into number of tasks and associate a logical sequence to them. Generate Gantt chart to mark timelines also mark key miles stones achieved/deliverables in a result of completing an intermediate task. Highly
Relevant to Final Scoring}
Task1
Tasks Jan Feb March April May June July August Sept
Task2
Task3
Task4
Task5
Report Writing
References / List of Accessed Resources:
{Specify most important Human/Internet/Literature resources which you accessed for proposal}