iSa : Intelligent Speech Assistant 2008 SBIR GRANT PROPOSAL Table of Contents Grant Application (Mahn)…………………………………………………3 Abstract (Wood)………………………………………………………..…4 Overview (Travaglio, Mahn)….…………………………………………. 5 Goals (Mahn)…………………..………………………………………… 6 Management Plan (Sayler)…….…………………………………………. 7 Evaluation Plan (Sayler)………….……………………………………….14 Marketing Plan (Travaglio)………….……………………………………27 Funding Plan (Seto, Mahn)……………………………………………….33 Resource Plan (Eldridge, Sayler)……………………………………..…. 35 Staffing Plan (Sayler)……………………………………………….. …...38 Prototype Plan (Sayler)…………………………………………………...46 Risk Management Plan (Wood)…………………………………………..47 Budget Plan (Seto, Wood)………………………………………………. 49 Team Biographies (Mahn)……………………………………………… 51 Conclusion (Mahn)……………………………………………………… 53 2 Grant Application 3 Abstract Communication is essential in many areas, such as going to the store, attending a religious institution, or attending a learning environment. However, one in ten Americans have a communication disorder, which makes them the largest group of Americans with disabilities. There are many causes of communication disorders today. The causes can be from physical disabilities, physical injury, mental trauma, disease or infections. In order to help those who have a communication disorder, we will develop the iSa. The Intelligent Speech Assistant (iSa) is aimed to provide a mobile platform for voice synthesis in order to assist in the communication process. Users of the iSa will be able to enter text or select predetermined words or phrases and the iSa will then speak the desired content. Using the technology in the iTouch and iPhone, the users will be able to not only use the keypads on the devices, but also to use the touch-screen for entering the desired output. The iSa will be able to help the user even further by predicting what the user is typing, as well as having preprogrammed user-defined shorthand to speed the communication process and make the whole process even more personal to the user. The users for the iSa are intended to be those with communication disorder who are looking to enhance their communication with others. Some of the users will be students in schools using the iSa to learn interaction and communication, whereas other users will be those who wish to improve their communications. Using the touch-screen technology we also plan to have the iSa be useful to the people with communication disorders that are caused from physical disorders, as the touch-screen will allow those users to be able to select words and phrases without having to use the small buttons on the device itself. 4 Overview Effects Health & Safety Their health and safety are at risk when they are unable to: Indicate an emergency Communicate their condition and needs to others Social Those affected by speech disorders suffer negative social effects. As depicted in the graph below, there is a difference in the quality of life between those who are affected by disabilities compared to those who are not. The particular social problem is that “people with disabilities live in relative social isolation.” 5 Those affected by speech disorders suffer negative social effects when they are unable to: “According to data from the 1990 NHIS, those with disabilities are twice as likely to live alone as those without disabilities “ Express feelings Obtain quality employment Speak or speak at length with others Otherwise properly function in society Decreased Self-Esteem Goals Develop a Portable Speech Assistant to help those with speech disabilities better communicate with others, using existing iTech (iTouch/iPhone) hardware Provide user-friendly augmentations such as text prediction that reduces keystrokes in consideration of those whose speech disability accompanies a significant physical disability Allow customization (i.e. Shorthand, Themes) to provide users the capability to maximize their effectiveness in variable settings (work, social, etc.) Develop, test, and produce the product while consulting experts and end users along the way Market the product to schools and other organizations that aim to help those with speech disabilities 6 Management Plan The purpose of this plan is to describe the management philosophy, program organization, schedule, and major milestones that serve as the guidelines for execution of iSa. Program Identification This program management plan (PMP) is for iSa. This program will deliver ISa hardware, software, and documentation. Team Blue is responsible for the integration, acceptance testing, and training for this project. Program Management Overview Execution of this program will be performed in accordance with the procedures defined by the set of planning documents. These documents include Program Management Program (PMP), Resource Plan (RP), Funding Plan (FP), Marketing Plan (MP), Staff Plan (SP), and Risk Management Plan (RMP). The responsibilities of each team member, the capabilities of the system, and the Program deliverables are detailed under the contractual provisions, as well as Blue Team’s technical, management, and cost proposals. This Program Management Plan (PMP) describes the management philosophy, program organization, schedule, and major milestones that serve as the guidelines for execution of this project. The PMP also provides the customers and the team with the information needed to monitor and evaluation the progress. This plan provides the following information: Corporate organization Areas of responsibilities of each member of the organization Work breakdown structure (WBS) Program planning Progress reporting and team management Detailed schedule and major milestones Program overviews This PMP also provides the guidelines for these followings: Risk Management Evaluation Plan Testing Plan Resource Management Plan Funding Plan Marketing Plan Installation Plan 7 Corporate Structures Blue team was formed in spring 2008 at Old Dominion University. Blue team’s members are responsible for the planning and development of the iSa System. We will be either directly involved in the entire process or outsource the responsibilities to other entity. The corporate structures are: CEO & President, Blue Team corporation Vice President iSa System Program Office that will execute the program and provide day-to-day management, engineering, and administrative resources necessary to management and maintain the program. Management Approach Blue Team’s goal is to work closely with the customers and specialists to fully understand the system requirements. The management approach, therefore, is based on the philosophy that successful Programs are delivered by goal-oriented teams. A program manager (PM) will lead the team toward this goal. A PM is responsible for all planning, programmatic, technical and financial aspects of the program. The PM will assigned and distribute tasks among each team member to assure that the project is carried out effectively and successfully. The primary duties of the PM include these aspects: Planning Scheduling Technical activities Customer liaison Program related decisions (with the approval and suggestion from team members) A key element of Blue Team project is specialist and customer involvement. Blue Team seeks specialists’ opinions during the development and installation process as well as customer active involvement to create a product that meets that customers’ goal. Project Team Blue Team’s goal is to provide an effective, low cost COTS system. Through strategic planning and an extensive selection process, Blue Team has assembled a cohesive Program Team that will work together to develop and implement each component that is needed to comprise the ISa System. Program Manager (PM) - Matthew D Salyer Senior at Old Dominion University, expected graduation date: December 2009 Major in Computer Science with a minor in Information Technology Interest: graphics design, web design, web database 8 Skills: Programming (C++, Java, Visual Basic), graphic design and web design (DreamWeaver), web design, Responsibilities The PM will manage the Blue team and is responsible for the planning and coordination of the day-to-day technical, contractual, and financial aspects of the program. She/he is responsible for the development and management of all program schedules, the coordination of all team members and all program activities. Hardware Specialist (HS)/ Risk Specialist (RS) - Scott Wood Senior at Old Dominion University, expected graduation date: December 2008 Major in Computer Science with a minor in Computer Engineering Interest: Networking, Programming Skills: Programming (C++, ASP, VBasic), Networking Responsibilities The RS is responsible for identifying all possible risks that are associated with the iSa. All identified risks will need mitigating actions to reduce or eliminate the risks. The HS is responsible for evaluating existing hardware options that are available to the team. The HS is in charge of determining where and when COTS are acceptable and when new hardware must be developed. The HS must evaluate available hardware options and advise the team on which options are best for the fulfillment of the team’s goals . Senior Engineer (SE) - Dominic Eldridge Junior at Old Dominion University, expected graduation date: December 2008 Major in Computer Science Interest: Database, Network Security Skills: Database Administration, Network Security, UNIX/LINUX System Administration, Web design, Programming (Perl, C++, HTML) Responsibilities The SE is responsible for the development and implementation of the system software function as defined in the system specification. She/he will assure that the integration for all systems components meet the performance requirement for the system. Financial Director (FD) / Webmaster (WB) - Scott Seto Senior Old Dominion University, expected graduation date: May 2008 Major in Computer Science 9 Interest and Skills: Software engineering, computer network, and military history Responsibilities FD is primarily responsible for managing the financial risks of the ISa System project. She/he is also responsible for financial planning and record keeping, as well as defining and reporting the budget for each project phase (defined in staffing plan). He will work closely with the technical director to ensure that the project meet budget requirement for each phase. The WM is responsible for determining the functionality and look of the website that will house the rate-it engine. As WB, the responsibilities include creating the team and product websites, as well as managing the web developers in future phases. Marketing Manager - Brad Travalgio Senior at Old Dominion University, expected graduation date: December 2008 Major in Computer Science Interest: Network, web database, web design, web programming Skills: Web database and programming (PHP, HTML, XML, mySQL, pl/SQL), Skills: programming (Java, C/C++) Responsibilities MM is primarily responsible for managing contact with subcontractors. This person is responsible for strengthening and expanding awareness of the iSa System and developing new marketing channels that are critical for the success of the product. As a guardian for brand values, the MM will develop, implement and evaluate the annual strategic plan and oversee various marketing programs including developing market research programs. Finally, the MM will build the framework for marketing initiatives and devise marketing and PR campaigns. Documentation Specialist - Mark Mahn Senior at Old Dominion University, expected graduation date: December 2008 Major in Computer Science Interest: Artificial Intelligence Skills: Programming (Java, C++, ANSI C, Perl, and SQL) Responsibilities The DS provides overall documentation direction for the Program Team. The DS will ensure that everyone on the team has met the required documentation specifications, and that each person is aware of the tasks he/she has been assigned. The DS will also provide documentation of each meeting in which an overview of tasks assigned is given. 10 Program Duration The iSa program is a 3-year duration project, from initializing the project to delivering the first product. The schedule consists of the preliminary design phase which will last through May of the year 2008, the construction and development process will be completed around the last quarter of 2009, the evaluation and testing process will last though the third quarter of 20010 and the first delivery of the product will be in April of 2011. Work Breakdown Structure (WBS) Constructed using Microsoft Visio, WBS1 reflects the budgeted cost versus resources required to complete each task. The WBS phase (see staffing plan) numbers are integrated as part of the master program schedule. For each WBS element, the Project Manager manages budgets for work planned, actual cost and estimates to complete with the assistance of the Funding Director. The WBS is an essential tool used to track program costs, progress, and earned values relative to master program schedule. Program Planning The Blue program team will maintain the program master schedule. The master schedule contains a line item for each WBS element and will be used to track the progress of each element. All deviations from the master schedule must be coordinated with the program office It is the responsibility of each team member to call attention to possible schedule deviation at the earliest opportunity. The program will be developed in phases 2. Formal review will play an integral part in monitoring program progress. Team Blue will use the “top-down approach” for our schedule. This means that we will start with the largest items of the project and break them into their subordinate items. This helps make constructing the WBS more convenient. Progress Performance Assessment (PPA) All members of the Blue Team will participate in the PPA. As a team, all members will track technical and financial progress of the project. Reviews will be held weekly to ensure the project’s goals will be met. The PPA contains the followings, 1 2 Report of progress to date Present work to be performed for the next period Present status of all the deliverable Discussion of technical and programmatic issues (if exist) For detailed WBS see Work Breakdown Structure document For detailed phase information see Staffing Plan and WBS document 11 In preparation for each meeting, the PM will collect the current status of on-going activities, progress against schedule and budget, and plan the activities for the next meeting. Quality reviews for all documentations and activities will be performed periodically. Technical Progress and Report The schedule of the program is established during the planning phase and monitored throughout the performance period. The schedule contains an entry for each WBS element. The percentage of completion for each WBS element is determined as necessary to manage program progress and is reviewed at least quarterly. Financial Management and Report The financial management for the program is established during the planning phase and is monitored throughout the performance period. A budget representing labor costs, material purchase, overhead cost, travel expenses, and other expenditures is prepared and implemented for each phase. The Project Manager with the assistance of the Financial Manager will oversee the overall spending profile of the program. They will use the financial summary provided by the Contracts Administrator to assess the technical progress in order to track the overall status of efforts. Earned Value Ratio (EVR) EVR will be reported quarterly. The EVR will be reported in form of Schedule Performance Index (SPI) ratio and the Cost Performance Index (CPI) ratios. If the ratios are below 0.90, further explanation is needed. SPI and CPI are defined below: SPI = BCWP/BCWS CPI = BCWP/ACWP Where BCWP = Budgeted Cost of Work Performed BCWS = Budgeted Cost of Work Scheduled ACWP = Actual Cost of Work Performed Quality Process and Reporting Quality management on the program will be a team effort. It is the responsibility of the quality system manager to coordinate conduct, quality reviews, and audits. The Project Manager task is to oversee the development and implementation of the System Quality Program Plan. 12 Monthly Progress Report To ensure the goals of the project are met, Blue Team will produce a monthly progress report. The report should include, but not limited to the followings, Progress summary Milestone deliverables, planned, actual, and forecast Earned value schedule and cost performances indices Critical list of all items, responsibilities, and activities Risk status Resource profile Milestones/deliverables planned, actual, and forecast status Quality Actions Configuration change control issues Reviews Reviews will play an integral part in the management and monitoring of all phases of the iSa System project. Informal reviews with the program team members will be held on a weekly basis to ensure that the project stays on track and meet the planned deadlines. Reviews includes the followings, Program management review Technical reviews Software requirement review Hardware requirement review Preliminary design review Critical design review Quality review 13 Evaluation Plan In order for our project to be successful, iSa must be evaluated on a regular basis to make sure we are adhering to the four main goals of our project: quality, cost, time, and scope. In order to properly evaluate the project we must specify criteria for determining success. Below are the detailed criteria necessary for our project’s success. iSa Limitations In order to properly evaluate iSa, then we also have to understand the scope of the project. While iSa is designed to help people with a speech disorder communicate better in society it is not intended to solve all communications problems. Evaluation Criteria Our project will be broken up into 4 phases: phase 0 (project inception), phase 1 (product prototyping), phase 2 (product design), and phase 3 (product out years). For project phases 0 and 1, the success of our project will be gauged through weekly group meetings and by consulting the CS 410 instructor and expert panel. During these two phases the success of the project will be closely monitored and necessary changes will be made to ensure its success. Overall success in phase 0 will be also determined by a successful SBIR proposal and completion of additional required documentation. Once we have received our initial SBIR grant, then we can proceed with phase 1. In phase 1 the main criteria for success are to implement a functional prototype and to secure a phase 2 SBIR grant. Project phases 3 and 4 are mainly concerned with being able to mass produce the iSa system and support it throughout the product lifetime. Once we have secured the phase 2 SBIR grant, then we can proceed with phase 2. In phase 2 our main task is to improve on the functional prototype and apply lessons learned in order to create a final product. More emphasis will be put on marketing and product distribution, while our research and development costs will go down. Success in phase 2 will be determined by the overall commercial success of our product. In phase 3 the main focus will be on the product out years, and our continuing support of the product. Again, our business success and how well we market and sell iSa will determine the success of phase 3. Each phase will be evaluated based on the evaluation checklist for that phase. Major evaluations will occur every 3 months or as deemed necessary by the PM. The evaluation checklist consists of five subcategories. They are as follows: 1) Personnel Factor: each member of the team will be evaluated based on technical, communication, management (if applicable), and overall impact to the group. 14 2) Administrative Factor: scheduling and task breakdown analysis is included in this evaluation factor. 3) Financial Factor: the scheduled budget for the current phase will be evaluated for cost efficiency, and funding allocation. 4) Marketing Factor: the current target market and an updated list of competitors will be validated. 5) Technical Factor: the components of the software, hardware and overall system will be evaluated for completion, testing, and integration. Phase 0 Phase 1 Phase 2 Phase 3 Evaluation Checklist (Phase 0, 1, 2 or 3) Technical Factor Personnel Factor Marketing Factor Administrative Factor Financial Factor Phase 0 Breakdown The main concern in phase 0 was to come up with a feasible project idea. After initial discussions and planning we decided on creating a drowning detection system. After determining our project concept we then had to complete all of our deliverables in order to assure that we had a idea that worth continuing with. The work done in preparation of the Feasibility and Milestone presentations has refined our idea so much that we have 15 determined that it can and should be done, and that we are ready to prototype the system in order to test it. The overall goal of phase 0 is to accomplish the following deliverables and to eventually secure a phase 1 SBIR grant. Deliverables Feasibility Presentation Milestone Presentation Proposal Presentation SBIR Phase 1 Proposal Product Website Personnel Factor Weekly meetings will need to be conducted so that not only a good project idea can be determined, but that we can collate all of our individual research and apply it to the overall progress of the group. Personnel success in this phase is based around the following: 1) Good communication between group members about what needs to be done, and when it will get done. 2) Good collaboration is necessary so that the work is spread evenly and that it can all be tied together seamlessly 3) Each member must contribute equally and have work of a high enough quality so that the group does not suffer. Administration Factor Specific scheduling of tasks and the breakdown of the work is assigned by the project manager. Meetings must be scheduled and properly led so that the group knows and understands its tasks. The project manager must also facilitate the group members so that they have the materials necessary to complete their tasks. The project manager must ensure that all work is done by the time required and that it is of high enough quality to be considered finished. Specifically for phase 0, success is determined by: 1) Assignment of the research to determine the necessity and feasibility of our project and the associated documentation by the project manager and its completion. 2) Assignment of all of the required deliverables (presentation work and plans) and their completion in the proper timeframe. 3) The ability of the project manager to integrate the team’s work so that the project can proceed to the next phase. Financial Factor 16 Determination of overall and projected costs is important in the success of a project. For phase 0 there are no associated costs, so the bulk of the financial work involves estimating the future costs of the project and determining the overall bottom line of the project. For this phase success is determined by: 1) Accurately estimating the associated hardware, software, and personnel costs for the upcoming phases. 2) Preparation of the financial documentation necessary for the SBIR proposal. Marketing Factor As with the financial considerations, since there is no product to market yet, we must consider the implications of our product in the market place. We have to examine our competitors and look at their product’s capabilities and make sure that our product isn’t lacking. We also need to gauge the market’s desire for a product like ours and see if our product will be marketable. Marketing success in this phase is determined by: 1) Correct competition assessment (hence the completion of the competition matrix) 2) Contacting potential customers and accurately gauging their interest in our product. Technical Factor Understanding the technical implications of our project is necessary so that we can actually make a product. If the technology necessary is not understood the product cannot be made and then the project fails. In phase 0 since there is no product yet, but only an idea, research must be done so that we can determine what technology will allow us to achieve our goals. For phase 0, success is determined by: 1) Understanding the technological barriers and limitations for our project, and finding technologies that overcome these. 2) Researching these technologies and making sure that these will overcome the project limitations 3) Making sure we have the support of the technology’s manufacturers so that we can effectively prototype the product. Phase 1 Breakdown Now that we have come up with a feasible project idea it is time to test it. We have determined that the product can be done (personnel and technical factors) and we have 17 determined that it should be done (financial and marketing factors), so now it is time to create a prototype. Assuming that we have a Phase 1 SBIR grant, the money must be managed so that we can properly prototype and test our product and then begin to refine and market it. Completing the Phase 1 deliverables will help us to pursue a Phase 2 SBIR grant. Deliverables iSa Prototype SBIR Phase 2 Proposal Personnel Factor Since we are now required to create a prototype of our product, our personnel requirements have changed from phase 0. In addition to the personnel requirements in phase 0, we might also need to hire new personnel (specialists) and increased cooperation and collaboration is necessary while we integrate the various parts of the product. Personnel success in phase 1 will be determined by: 1) Having the personnel in order to effectively create a product prototype, and hiring more if necessary. 2) Increased cooperation during the integration phase in the product prototype. Administration Factor The project manager’s role now shifts from collating everybody’s ideas to keeping everyone on the same page. The project manager has to make sure that the software and hardware specialists have enough money/tools in order to create a prototype. The manager also has to relay between the hardware / software specialists and the financial / marketing specialists and the so that they have accurate cost estimates and accurate product release dates. In phase 1 administrative success will be determined by: 1) Proper delegation of tasks between group members while creating the prototype. 2) Making sure all group members understand the needs of others, so that delays can be avoided, and all group members work can progress in a timely manner. 3) Making sure that if there is a delay, that its cause can be resolved and that all group members are informed so that their work can reflect the delay. Financial Factor 18 Having secured a Phase 1 SBIR grant, we now have $100,000 to proceed with. This will contribute to personnel salaries, implementation cost, and marketing cost to name a few. This money has to be wisely spent and properly distributed between group members so that everyone can accomplish their tasks. In the same sense, the money has to be accurately accounted for, for business purposes (taxes etc…) and costs will also need to be accounted for the next SBIR proposal. Ultimately we should be working towards securing a phase 2 SBIR grant. Success will be measured by: 1) Making sure that the appropriated funds are adequately distributed in order to be able to successfully create a prototype. 2) The money must be properly accounted for and all expenses recorded for tax and SBIR proposal 2 purposes. 3) Areas must be identified where we can cut costs for phase 2. Marketing Factor Since we are now working on a product, we can reasonably try to market it. Now that we have a prototype the marketing expert has a decent understating of what our product does and does not do, and it can be marketed accordingly. Also as part of an effective marketing / testing strategy, we can offer to beta test our system at various watermarks, and use our success stories as more marketing fuel. Marketing success in phase 1 can be determined by: 1) Marketing potential beta testing to various water parks should allow for real world testing and provide great marketing examples for future marketing campaigns. 2) The marketing tools should accurately reflect what iSa is and what exactly it does. 3) Marketing success will result in increased interest and future purchase of our system. Technical Factor Now that we are prototyping our system, this is where a large bulk of the technical work is done. The hardware we are using needs to be tested individually so that we can determine that it is actually working. We must also test the software to make sure that it does exactly what we want. Then once we integrate everything we have to test the whole system again and make sure everything works correctly. Our product testing will involve various strategies including design and code reviews, module testing, integration testing, and finally beta and end-user testing. Once our product is tested then we can find hardware / software errors that we can then fix. After the prototype has been tested to satisfaction we can begin to refine the product for phase 2, which is our eventual goal. In order to measure our success for this phase the following must be met: 19 1) A working prototype must be created. 2) The prototype must pass all of the required testing in order to be considered a successful trial. 3) After we have thoroughly tested the system it must be successfully demonstrated to be working. 4) Lessons learned should be documented so that refining the prototype will be easier in phase 2. (See the iSa Product Evaluation section for testing strategies) Phase 2 Breakdown Now that we have successfully prototyped the iSa system and secured funding for phase 2 it is time to refine the iSa system further and mass produce it. Also now that we have a working product, marketing and financial factors have a higher priority and our business has to become self-sufficient. Deliverables A Fully Functional iSa System Personnel Factor Since our iSa system has been refined and is now in production, our personnel needs have changed from phase 1. We will now need marketing experts, good accountants, and a lawyer to make sure that the business will stay afloat. The engineers will now shift their duties primarily to system upkeep, and will focus on further refining it, rather than developing it. Success will be measured by the following: 1) Keeping the required staff that is necessary to support our product throughout its development, refinement, and out years. 2) Hiring more staff to manage and keep the business running. Administration Factor The project manager’s role is similar to that in phase 1. The project manager needs to make sure that the tasks are assigned and that each team member does their work. This includes making sure that the system engineers refine the iSa system and make it ready for deployment, as well as making sure that the marketing and financial people are taking care of their end of the business. Success is met by doing the following: 1) Proper delegation of tasks between group members while making iSa ready for deployment. 20 2) Making sure all group members understand the needs of others, so that project delays can be avoided, and all group members work can progress in a timely manner. 3) Making sure that if there is a delay, that its cause can be resolved and that all group members are informed so that their work can reflect the delay. Financial Factor Having secured a Phase 2 SBIR grant, we now have $750,000 to proceed with. With this money we need to become self-sufficient. That money will help cover salaries and start-up costs, but it needs to be handled efficiently and correctly so that we do not run out of cash on hand. Costs must be analyzed so that it can be determined where costs can be cut, and where the business is successful. Financial success can be determined by: 1) Proper accounting techniques are used to track and manage the money supply. 2) The money must be adequately distributed so that the business does not suffer in any way. 3) Cost cutting measures must be taken so that the business can be selfsufficient and remain in the black. Marketing Factor Now that our system is in production it is available for sale. So we need to steadily increase our marketing and come up with new strategies. Good marketing will be the key to keeping our business alive. Success will be determined by the following: 1) The marketing for iSa accurately depicts what our system does in an easy to understand way. 2) Gaining new customers. 3) Retaining our old customers and making sure that if they need another system installed, they will come to us again. Technical Factor Since iSa has been prototyped successfully and has been properly tested and evaluated it is time to fix whatever went wrong with the prototype and to improve and refine the current design. After the improvements have been made then we will need to retest the system in the same way we did for phase 1. After successful testing has been accomplished then we to prepare to produce the system as a whole. The following will conclude success in this area: 1. The prototype must be refined to production level quality. 21 2. The Production model must successfully pass all testing measures. 3. All design modifications and lessons learned should be documented for the upcoming product out years. (See the iSa Product Evaluation section for testing strategies) Phase 3 Breakdown Now that we have a successful product on the market, the main focus is to maintain a stable growing business. We need to aggressively pursue more customers, while refining our product and providing support to old customers. Deliverables A Working iSa System with Product Support Personnel Factor Now that our system is in production and it works, the main focus with personnel is to have enough people to maintain / refine the system, and enough people to keep the business running. If there is substantial business growth, or major upgrades / improvements to the system then more people will be need to be hired to maintain the business and help support the product. Personnel success will be judged by: 1. Keeping the required staff that is necessary to support our product throughout its development, refinement, and out years. 2. Hiring more staff to manage and keep the business running as necessary. Administration Factor The project manager’s role is the same as in phase 2. The project manager needs to make sure that the tasks are assigned and that each team member does their work. This includes making sure that the system engineers refine the iSa system and improve it as necessary, as well as making sure that the marketing and financial people are growing the business. Success is met by doing the following: 1. Proper delegation of tasks between group members while making iSa ready for deployment. 2. Making sure all group members understand the needs of others, so that project delays can be avoided, and all group members work can progress in a timely manner. 3. Making sure that if there is a delay, that its cause can be resolved and that all group members are informed so that their work can reflect the delay. 22 Financial Factor After phase 2 our business should be self-sufficient. If it is not, then other means of securing funds should be pursued (i.e. grants). Also over the lifetime of the business and our iSa system, cost cutting will be important to maintaining profits, and it may be wise to start looking into LEAN or Six Sigma practices to help maintain them. Financial success will be measured by the following: 1. Proper accounting techniques are used to track and manage the money supply. 2. The money must be adequately distributed so that the business does not suffer in any way. 3. Cost cutting measures must be taken so that the business can be selfsufficient and remain in the black. LEAN and Six Sigma opportunities should be investigated. Marketing Factor Marketing strategies are similar to those in phase 2. We will want to pursue more and more customers in order to grow the business. We will also need to get customer feedback so that we can improve our system over its lifespan so that it can stay innovative and fresh. It would also be prudent to explore possible alternative markets for our product, so that we can maximize sales. Success is measured by the following: 1) New customers must be gained and old customers must be retained. 2) Feedback from customers must be obtained so that we can improve the current iSa system. 3) Alternative markets must be found to increase profits. Technical Factor Now that we have overcome most of the technical challenges in just creating something that will work, the bulk of the technical work in phase 3 will be to upgrade and add features to the current system. Feedback should be taken from existing and potential customers to see what should be added (if anything) and then all additional changes and releases should be tested as before. Product support also has to be provided over the lifetime of the business. Success will be measured by: 1) There must be well-organized and correct documentation for the iSa production model. 2) The system engineers should make upgrades and improvements as necessary (taking into account customer feedback) and they should be tested as before. 23 3) Customer support must be a priority in order for us to retain customers. (See the iSa Product Evaluation section for testing strategies) iSa Product Evaluation The major challenge of this entire project is overcoming the technical difficulties of creating a drowning detection system the way we are. We will be using hardware in a way it has never been used before, and we will also be using it in a complex environment (water, concrete, etc). Getting this hardware to connect with the software will also be a specifically difficult thing to accomplish, however it can be done. Building the iSa prototype will be difficult at first, and we will no doubt have many errors in our system, so in order to find them and fix them we need to develop an effective testing strategy. BDUF and Design Reviews Starting with the overall design of the system (hardware and software) a Big Design Up Front (BDUF) needs to be set forth so that a lot of basic flaws are avoided. After the initial design has been made then there needs to be a series of design reviews that go over every single part of the design so that nothing is missed. Then once the system is being designed the code for the software needs to be reviewed periodically (this can be done through pairs programming) so that any errors in the design of the software can be caught and fixed before they become major problems. Total system review will make all team members more knowledgeable how iSa should work and it allows the whole team to do their jobs more effectively. Module Testing Once each individual piece of the design (The software, hardware components, etc) has been implemented, there needs to be an automated testing strategy for each piece. Building up an automated set of trial cases for a module allows you to make sure that your module is working as it should. If an error is found that is not a test case it can then be added and that error can be prevented in the future. Also when a change is made to a module it helps identify errors that were introduced by accident. Integration Testing In the integration testing a combination of top-down and bottom-up testing would be used to make sure all of the modules work together as intended. This will test for validity and effectiveness in regards to all other existing pieces. This step is to ensure that all components of the project continue to work well in relation to one another. 24 Performance Testing This type of testing is necessary that our software interacts well with the hardware. We will need to make sure that the software we make can be handled well by the computer system. Some things to check are the size of the software when installed, the amount of main memory and/ or secondary storage it requires and the demands made of the operating system when running within normal limits or the response time. Testing the performance of the sensor hardware and the software it communicates with under the worst conditions will help prove the reliability of the software. Stress testing and Recovery Testing In this type of testing we basically try to break the system and see how well it handles the increased stress. We will put abnormal demands upon the software, such as increasing the rate at which it is asked to accept data or the rate at which it is asked to produce information in order to see if it will crash. More complex tests may attempt to create very large data sets or cause the software to make excessive demands on the operating system. After we have strained the software as much as possible we will then deliberately interrupt the software in a number of ways by taking the hard disc off line or even turning the computer off, to ensure that the appropriate techniques for restoring any lost data will function. Beta Testing This is where the system will be released to the actual end users and tested in their pools. Alpha releases will be done at ODU and they will be tested thoroughly for errors. Once the alpha release has been tested successfully then the errors that have been made known will be fixed and a beta version will be released. We will then release the beta version to various water parks (etc) to finalize testing. From these tests and polls, we will evaluate the usability and effectiveness of our product. Alpha and Beta testing plan The following will be checked during testing: Product functionality 1) It will monitor numerous sensor tags at once. 2) It will register the sensor tags with some identifying information. 3) The sensors tags will send an alarm if it has been motionless or underwater for too long 4) The receivers will send a signal to the terminals that will alert the lifeguards to the emergency Product’s user-friendliness 25 1) It will have a graphical user interface 2) It will have a touch screen for ease of use 3) It will have a user friendly help menu User Documentation 1) Each tester will be given some personal instruction 2) Each tester will have a user manual to figure out how to use the system 26 Marketing Plan The purpose of this document is to briefly describe the iSa System and the approach it takes to improve communication. Also, it provides a study on iSa's competitors and potential customers, sales and marketing strategies, break even analysis estimation, customers’ benefits, and ROI. 1. Promotional Statement The following are the slogans that will be used in the promotion campaign of iSa when this has been introduced to the market: “intelligent Speech assistant, Let iSa be your voice.” “Have you heard what iSa.” “What I need, iSa.” 2. Product Description The ability to communicate is our most basic human characteristic. Communication is essential to learning, working, and social interactions. However, one in 10 Americans has a communication disorder. This makes them the single largest population of challenged Americans (1), with nearly 6 million of those affected being children under the age of 18. iSa plans to aid those who have difficulty having their speech misunderstood. We will provide a program for the Apple iTouch/iPhone that will allow the user to communicate with a voice synthesizer through our applications interface. iSa also plans to add other features that will enhance the users experience with the program. To make iSa easier to use the ability to use short hand notation was added. This would help by saving typing time when using a commonly used phrase. Another feature that can be personalized is our the theme Another time saving feature is that while you type iSa will attempt to predict the word you are type and save a few keystrokes. 3. Market Analysis Our potential customers are people with speech disabilities and people who use English as a second language. As of 2002, there were approximately 2.6 million Americans who have difficulty having their speech understood, about 600,000 had severe disabilities. From a Survey in 2006 approximately 2.4 million Americans who use English as a second language reported that they spoke English less than “very well”. The following is a look at 3 of our competitors: 27 Lingo Lingo features seven message locations each with 25 seconds of recording time and one memo location with a full 60 seconds of recording time. Each message location can be recorded and erased independently making it easy to change individual messages on the fly. Plus, Lingo’s memo button offers a list feature that allows for adding a message without recording over previous messages. Lingo also boasts a digital engine for crystal clear voice output. Disadvantages Cost - $179 Limited to 25 second phrases Only allows preprogrammed messages Limited Storage Afforda Speech KN-200 MiniKey Keyboard Communicator The Keyboard Communicator is a portable miniature keyboard based speech synthesizer. Featuring the industry standard DECtalk voices, you have a highly intelligible and configurable text-to-speech system. With its mini keyboard, one can directly key in messages to be spoken, or you can recall phrases from one of the 36 commonly used phrases that you have stored within its internal memory. Disadvantages Cost $ 795 Needs a keyboard to work Limited to 36 stored phrases Runs on 4xAA batteries Palmtop 2G Palmtop2G is an excellent AAC solution for individuals requiring powerful communication and extreme portability. Full-featured Impact communication software and sleek styling combine to appeal to augmented communicators of all ages with existing or emerging literacy skills. Disadvantages Cost $2895-$3895 All of these products are trying to solve one problem, making communication easier to understand. And what makes iSa different from its competitors? Its adaptability and low cost is the difference. iSa is not a stand-alone product. It is meant to be used along side the iTouch/iPhone and in this manner this is a major difference between our 28 solution and the competition. iSa does not require very expensive hardware because it uses the technology that comes with the Apple iTouch/iPhone, which helps us to keep the cost of our product down. iSa also inherits the functions that come with the iTouch/Phone. 4. Target Market Our initial target will be the 2.6 million Americans who have difficulty communicating. Since our product is software the distribution would not limit us to a single state and we could potentially reach all of those in need of our solution. Another possible market is the 2.4 million Americans who use English as a second language. iSa could help those Americans by giving them a clear voice without the distortion from their accent We have made a few steps in applying to Apple as iTouch/iPhone developers. As developers we would then be able to submit programs to be sold on the iTunes store. This should gain us some exposure with those who like to add features to their Apple products. This could also be a market that we could expect some sales from. Overall our target market is as follows: Primary target: People with speech disorders People who use English as a Second Language Secondary target iTouch/iPhone enthusiasts 5. Sales Plan iSa has a broad market. We will not be able to set-up a store and sell our product in retail chains. Our product will be made available through Apple's iTunes store. To encourage sales a website will be made to offer a place for people to review our product and ask any questions. We will also submit our product for review to websites like downloads.com and slashdot.org in the hopes of gaining some feedback and exposure. 6. Advertising Strategy We will advertise iSa through our own website and via iTunes. Thanks to Apple and the release of the iTouch/iPhone SDK there is a buzz about the development of new programs to enhance the current iTouch/iPhones. We could also target schools because iSa could be used as an aid to improve communication for students with communication problems. One other strategy we were hoping to employ is asking for our product to be 29 reviewed. These reviews can help to expose our product to potential customers. Hopefully after a successful launch the first iSa customers will be so satisfied that they would refer people to us when in need of a program for communication. To summarize we will use the following mediums to initially advertise iSa. Our website iTunes Schools Word of Mouth(Blogs, Reviews, Customer responses,...) 7. Price Point for Blue Team This is the product’s estimated cost to implement the iSa system. Phase 0 $ 0.00 Phase 1 $ 100,688.00 Phase 2 $ 375,144.00 Phase 3 $ 647,668.00 Total $1,123,500.00 Funding $ 325,000.00 Cost $ 773,500.00 8. Price Point for Customer The following provides detailed information on an approximated customer cost for the iSa. iPhone iSa software $399 $499 Total Cost to customer $898 Overall, our final selling price for our software is $ 499.00 Our total solution price is $898.00 9. Break Even The estimated cost to implement all phases is $ 773,500. We will be able to break even, after we sell 2215 iSa systems. 10. Marketing Objectives 30 Blue Team has set some basic objectives for the first three years of iSa in the market First Year - Generate revenues for $ 300,000.00 (860) - Pay part of note payable account - Advertise iSa Second Year - Generate revenues for $ 400,000.00 (1150) - Pay part of note payable account - Advertise iSa Third Year - Generate revenues for $ 689,900 (1975) - Close note payable account - Get international customers 11. Customer Benefits Within all the benefits offered by iSa there is one thing that stands out among the others. This benefit is the priceless satisfaction of having your speech understood. Other benefits offered are: Low cost Improved quality of life No additional cost for hardware warranty 12. Customer Return on Investment 31 The customer will gain a tool that in combination with the iTouch/iPhone will greatly increase the ease at which communication can occur. 32 Funding Plan Many people have speech disabilities and are unable to feel comfortable going out in public. This affects their social well-being and may contribute to feelings of loneliness or isolation. A solution to this problem that relies on the hardware and software created by this organization is the intelligent speech assistant. We have six group members that are concerned with the health and happiness of those with special needs as one of our group members has a speech disorder himself. We have experts on our side that desire to use their expertise to benefit society. Together as a team, we can fulfill our goal of reducing the struggles of people with this debilitating disorder. There are a few ways to approach this problem that can be done without the help of technology. One option is to ignore the problem and let people with a speech disorder not benefit from enjoyable social interactions. However, we will not ignore the problem and we will focus our efforts to solving the problems through our innovative product. The prototype will need to be constructed. Then it needs to be tested and advertised. We will deploy our product and sell it to the mass market. We will continue to update and support it past the two years and for a long time forward. It will cost $100,000 for Phase 1 and $401,000 for Phase 2. Financing To finance all phases of the iSā project from conception through production, we submit a grant proposal for Phase 1 and Phase 2. Phase 3 will be funded through venture capital investment. Funding Agency A grant proposal will be sent to the Department of Health and Human Services. They offer up to $325,000. The purpose of the HHS research program is to develop, implement, and measure the effectiveness of interventions that promote the health and wellness of people with disabilities and prevent secondary conditions across the lifespan. The goals are to define the precise targeted populations for the intervention program, convey the capacity to identify, reach, enroll, and follow this population; and measure and evaluate the effectiveness of the intervention. Phase 1 Requires $100,000 for the development of the iSā prototype. This development work will include planning, identification of requirements, hardware setup, design, coding and testing. Phase 2 Requires $225,000 for ongoing development from Phase 1, additional hard resources, technical documentation and actual beta testing of the product with users. 33 Phase 3 Having acquired the necessary funding in Phases 1 and 2 to complete the prototype, iSā will be in a position to enter production and commercialization. Funding will provide for the production and commercialization of our product and will be provided through investment by venture capital firms. Additional Funding Additional funding sources available outside of the grant include a Proposal Assistance Award and Growth Acceleration Program (GAP) from the CIT. The Proposal Assistance Award can be used to pay for Phase I and II proposal preparation and review costs. Amounts available under this program include $1,000 for Phase I and $2,000 for Phase II. The CIT’s GAP Investment program provides up to $100,000 and will be available as an additional funding option for Phase III and in the Out Years. Budget Summary Phase 1 Hardware Costs Personnel Costs Total $752 $100,688 $101,440 Phase 2 Hardware Costs Personnel Costs Total $26,705 $375,144 $401,849 Phase 3 Hardware Costs Personnel Costs Total $5,068 $647,668 $652,736 34 Resource Plan Purpose This document defines the hard resources associated with the project per phase. The purpose of this document is to define what hard resources are necessary per phase and to explain their purpose. Each phase defines new hard resources that are introduced; however it should be assumed by the reader that any hard resource that is used in a previous phase will be used for the same purpose in subsequent phases unless otherwise noted. Although human resources are in integral part of the resource plan, these resources have been addressed in the separate document, Staffing Plan, contained within this SBIR. The reader is referred to the funding plan for any detailed financial information. Phase 0 In this phase the initial SBIR proposal is created along with a proposal presentation and product website. Since this phase only involves research and the proof of concept, no hard resources are required. Phase 1 In this phase a lab prototype will be developed and the SBIR Phase 2 proposal will be developed. Success will be measured by the successful completion of those two deliverables. The following hard resources are needed for Phase 1: Phase 1 Resource Product # Cost/ Unit Queue Server DELL PowerEdge SC1430 Debian Linux Embeddable Predictive Text Library OpenMary MySQL Interface Design Mozilla Debian Administration 25' CAT6 Network Cable Contingency Reserve 1 1 1 1 1 1 1 1 1 1 Software Technical Support Ethernet Cable Contingency Total Total 730 0 0 0 0 0 0 0 30 5,000 730 0 0 0 0 0 0 0 30 5,000 $5,800 Queue Server – This queue server will advertise and distribute iSa related software. In addition the queue server will host iSa’s data center. This computer will use Debian Linux. Ethernet Cable – A network cable used to connect queue server to the Internet. Technical Support – It is necessary to have support for administrating any OS. Contingency – Project are by nature full of uncertainty. This small contingency reserve would cover small expenses not specifically identified in this plan. 35 Phase 2 In this phase the actual prototype of the product will be developed. The following hard resources are needed for Phase 2: Phase 2 Queue Server Workstation Router Ethernet Cables iTouch Phone USB Speakers Prototype DELL PowerEdge 2950 III Macintosh, Windows, Linux, and UNIX Cisco 2800 Series Router 25' CAT6 Network Cables iTouch iPhone iPhone/iTouch USBs iTouch Speakers iSa used on personal computer Prototype Product Cost 10 4 1 15 10 10 20 10 1 1 1,400 1,300 1,500 30 250 400 3 13 0 0 14,900 5,200 1,500 400 2,500 4,000 60 130 0 0 $30,000 Total Queue Server (10) – These are the queue servers that make up a rack in the data center. These are setup to relieve the load from the main queue server (DELL PowerEdge SC1430). Workstations (4) – Necessary for beta testing multi-platform porting capabilities. Router (1) – With the increase in office staff, development and test machines a router is required. The router connects the machines to each other as well as the Internet. Ethernet Cables (15) – These are used to patch the PCs into the router. The product line that we fell will best support our system because of ease of use for the end users. During beta testing is when we want to put that real product in their hand so that we can see how well these things work together. These product lines include iTouch, iPhone, USBs, and speakers. Prototype – The cost of the prototype is detailed above. The prototype will be a personal computer that represents how iSa functions by running its software. Phase 3 This phase is the main rollout of the product. In this phase the warehouse and manufacturer is secured and actual production begins. The marketing campaign also begins in this phase. The following hard resources are needed for Phase 3: Phase 3 Workstation DELL Precision 370 7 699 49,000 36 25' CAT6 Network Cables 7 25 Total 180 $49,180 With the data center built out in Phase 2 and the prototype created in Phase 2, we only need to purchase PCs for our new office staff. Workstation (7) - – These workstations will be installed with the default version of Windows. These workstations are for the new staff that is brought on in Phase 3. These include the administrators and developers. Out Years The phase is the functional and support phase of the project. The tasks in this phase are ongoing and are not part of the project. Since Out Years maintains and supports the products that are created in the project, any hard resources needed for that support would have been identified and setup in Phase 3. Therefore there are no hard resources defined specifically for Out Years the Out Years hard resources come from previous phases. 37 Staffing Plan The purpose of this plan is to define the staffing for each phase of the project. This document describes the staff that will be needed for each phase as well as their responsibilities. 1. Phase 0 This is the first phase of the project where the initial SBIR will be created along with the proposal and milestone presentations. As well, the project's website is created. For Phase 0, we need the following staff Figure 1 1.1. Staffs and Responsibility Project Manager Assure that all tasks are assigned and are performed with high quality Resolve difference and conflict Develop the WBS Assign resources Prioritize tasks Define tasks dependencies Marketing Specialist Determine the target market Support the marketing aspect of the project Choose and manage the marketing vendor Determine the overall marketing plan 38 Hardware Specialist / Webmaster Determine the best hardware for iSa System Estimate the cost of hardware Assist the financial specialist with hardware budget Research sensor technologies and other hardware for iSa System Research the best method of developing and attaining hardware components Create the team website that includes team biography, presentations, and documentations Software Specialist Determine the algorithm for the iSa System Estimate the cost of developing the software Determine the most suited method for developing and maintaining the software Financial Specialist Receive fund Create budget Determine product cost Financial and funding plan 2. Phase 1 In this phase, a lab prototype will be developed. Along with this, the SBIR phase 2 proposal will be written. Success will be measured by the successful completion of those 39 The following staffs will be needed for this phase: Figure 2 2.1. Staffs and Responsibility Project Manager Assure that all tasks are assigned and are performed with high quality Resolve difference and conflict Develop the WBS Assign resources Prioritize tasks Define tasks dependencies Marketing Researcher Determine the target market Support the marketing aspect of the project Determine the overall marketing plan Webmaster Create the team website that includes team biography, presentations, and documentations Software Specialist Determine the algorithm for the iSa System Estimate the cost of developing the software Determine the most suited method for developing and maintaining the software 40 Financial Specialist Receive fund Create budget Determine product cost Financial and funding plan Product Manager Determine the functionality that will be included in the iSa System Defining the requirements from a customer’s perspective Technical Specialist Determine the technical requirements Managing the technical staff Determine and solve technical problems Risk Specialist Managing project risk Determine what risks exists in the project Evaluate risk severity Probability of the risks Attempt to mitigate the risks Phase 1 Staff Salaries Title Financial Specialist Marketing Specialist Product Manager Project Manager Risk Specialist Software Specialist Technical Specialist Webmaster Yearly Rate $41,600 $41,600 $41.600 $52,000 $41,600 $41,600 $41,600 $41,600 Hourly Rate $20 $20 $20 $25 $20 $20 $20 $20 Hours 536 536 260 536 536 399 260 399 Total $10,720 $10,720 $5,200 $13,400 $10,720 $7,980 $5,200 $7,980 Total: 40% Overhead $15,008 $15,008 $7,280 $18,760 $15,008 $11,172 $7,280 $11,172 $100,688 3. Phase 2 In this phase, an actual prototype of the product will be created. The following staffs will be needed for this phase. 41 Figure 3 3.1 Staffs and Responsibility Project Manager Assure that all tasks are assigned and are performed with high quality Resolve difference and conflict Develop the WBS Assign resources Prioritize tasks Define tasks dependencies Webmaster Create the team website that includes team biography, presentations, and documentations Manage the web developers in the future Software Engineer 1 & 2 Determine the algorithm for the iSa System Estimate the cost of developing the software Determine the most suited method for developing and maintaining the software Financial Specialist Receive fund Create budget Determine product cost Financial and funding plan Product Manager Determine the functionality that will be included in the iSa System Defining the requirements from a customer’s perspective 42 Technical Director determine the technical requirements managing the technical staff Phase 2 Staff Salaries Title Financial Specialist Product Manager Project Manager Software Engineer 1 Software Engineer 2 Technical Specialist Webmaster Yearly Rate $64,000 $64,000 $68,640 $56,160 $56,160 $62,400 $62,400 Hourly Rate Hours Total $30 1040 $31,200 $30 504 $15,120 $33 1040 $34,320 $27 774 $20,898 $27 774 $20,898 $30 504 $15,120 $30 774 $23,220 Total: 40% Overhead $43,680 $21,168 $48,048 $29,257 $29,257 $29,257 $21,168 $225,086 4. Phase 3 In this phase, the delivery of the first product occurs. With the warehouse and manufacturer is secured, the actual product begins. Also, the marketing campaign is rolled out. The following staffs are needed for this phase. 43 Figure 4 4.1. Staffs and Responsibility Project Manager Assure that all tasks are assigned and are performed with high quality Resolve difference and conflict Develop the WBS Assign resources Prioritize tasks Define tasks dependencies Marketing Specialist Determine the target market Support the marketing aspect of the project Choose and manage the marketing vendor Determine the overall marketing plan Webmaster Create the team website that includes team biography, presentations, and documentations Manage the web developers in the future Software Engineer 1 & 2 Determine the algorithm for the iSa System Estimate the cost of developing the software Determine the most suited method for developing and maintaining the software 44 Financial Specialist Receive fund Create budget Determine product cost Financial and funding plan Product Manager Determine the functionality that will be included in the iSa System Define the requirements from a customer’s perspective Technical Director Determine the technical requirements Manage the technical staff Procurement Manager3 / Lawyer Create all contracts Handle customer negotiations HR Manager4 Hiring Handle employee paperwork Set salaries Administrative Assistant Manage the administrative needs of the staffs Take minutes, type up paper work, et cetera Bookkeeper Produce financial reports of the project Operations Manager Manage functional organization of the project Manage the staff who maintains the product after the project is closed iSa Customer Support Take customer orders Take complaints and questions Generally, take care of customers’ needs 3 4 Require legal procurement experience Human resource management skills needed 45 Prototype Plan We will be developing a prototype for the iSa Product. This prototype will contain some aspects of the real world product but some of the things in the real world product will be simulate in the iSa prototype. iSa Prototype MFCD The following is a major functional components diagram of the iSa prototype: Limitations and Features of the Prototype In the iSa prototype we will be simulating the iTouch aspect of the iSa real world product though the use of a computer. Also because of time we will only be using one theme whereas the iSa real world product will be using a lot of themes. But the iSa prototype will include text prediction and voice synthesis. 46 Risk Management Plan A - Difficult to type B - Difficult to afford C - Hardware becomes outdated D - Delays in the database A. Difficult to type Cause: 20% of our target market has physical disabilities that can limit their use of the iTouch or iPhone. If they are unable to use the iTouch or iPhone, then they will also be unable to easily use iSa. Mitigation: By using image groupings, where the user can select an image instead of typing, the users with physical disabilities may be able to use our software. The images will be larger then the standard keys used for typing on the iTouch or iPhone, making them easier to press correctly. The images will correlate with predefined phrases or words. Likelihood: Low Consequences: Moderate B. Difficult to afford 47 Cause: The majority of people in America have a private health insurance plan that does not have coverage for speech disabilities. Nearly 60% of Americans have these plans. Most of the plans either do not have coverage, or the coverage must be asked for at the time the plan is established. Mitigation: The iSa is planned to have a selling cost of $100, which is lower then the competition. Speech aids range from $200 to $5000. These devices are not multi-use hardware. With the iSa being on an iTouch or an iPhone, the iSa hardware is multi-use. Likelihood: Moderate Consequences: Low C. Hardware becomes outdated Cause: It is inevitable that all hardware will become outdated. The iSa is designed to be run on an iPhone or an iTouch. When these devices become outdated, iSa itself becomes outdated. Mitigation: The core of the coding for the iSa will be able to be ported from one device to another. The only changes that will be required is to remove the iTouch SDK and replace it with the new hardware's SDK. This will allow the iSa to easily port from the iTouch platform to any new platform that may come out. Likelihood: High Consequences: Negligible D. Delays in the database Cause: The iSa package will require more then one database. Each database will have tables that need to be created and entries into each table. The word prediction database will need to be filled with common words to start. The task of filling the databases may require more time then allotted. As the database is the longest single step, the longer it takes the more delay is put on the release of the iSa. Mitigation: Using SQLite's zero-configuration database, the time required to create and setup the databases will be reduced. SQLite is designed for use on portable devices, which increases its overall appeal to the iSa project. Lowering the time needed to create and setup the database will allow more time for filling the database. Likelihood: Low Consequences: Low 48 Budget Plan Phase 1 Personnel Resources Title Yearly Rate Financial Specialist $25,600 Marketing Specialist $25,600 Product Manager $25,600 Project Manager $32,000 Risk Specialist $25,600 Software Specialist $25,600 Technical Specialist $25,600 Webmaster $25,600 Hourly Rate $20 $20 $20 $25 $20 $20 $20 $20 Hours 536 536 260 536 536 399 260 399 Phase 2 Personnel Resources Title Yearly Rate Hourly Rate Hours Financial Specialist $64,000 $50 Product Manager $64,000 $50 Project Manager $70,400 $55 Software Engineer 1 $57,600 $45 Software Engineer 2 $57,600 $45 Technical Specialist $64,000 $50 Webmaster $64,000 $50 Phase 3 Personnel Resources Title Yearly Rate Administrative Assistant $25,600 Bookkeeper $32,000 Customer Support 1 $25,600 Customer Support 2 $25,600 Customer Support 3 $25,600 HR Manager $64,000 Lawyers $140,800 Marketing Specialist $64,000 Operation Manager $64,000 Procurement Manager $64,000 Product Manager $64,000 Project Manager $70,400 Hourly Rate $20 $25 $20 $20 $20 $50 $110 $50 $50 $50 $50 $55 Hours 960 274 960 960 960 960 71 960 960 466 466 960 Total $10,720 $10,720 $5,200 $13,400 $10,720 $7,980 $5,200 $7,980 Total: 40% Overhead $15,008 $15,008 $7,280 $18,760 $15,008 $11,172 $7,280 $11,172 $100,688 Total 40% Overhead 1040 $52,000 $72,800 504 $25,200 $35,280 1040 $57,200 $80,080 774 $34,830 $48,762 774 $34,830 $48,762 504 $25,200 $35,280 774 $38,700 $54,180 $375,144 Total: Total $19,200 $6,850 $19,200 $19,200 $19,200 $48,000 $7,810 $48,000 $48,000 $23,300 $23,300 $52,800 40% Overhead $26,880 $9,590 $26,880 $26,880 $26,880 $67,200 $10,934 $67,200 $67,200 $32,620 $32,620 $73,920 49 Software Engineer 1 Software Engineer 2 Technical Specialist Webmaster $57,600 $57,600 $64,000 $64,000 $45 $45 $50 $50 714 814 466 714 $32,130 $36,630 $23,300 $35,700 Total: $44,982 $51,282 $32,620 $49,980 $647,668 Out Years Resources Title Bookkeeper Customer Support 1 Customer Support 2 Customer Support 3 Operations Manager Yearly Rate $52,000 $41,600 $41,600 $41,600 $104,000 Hourly Rate $25 $20 $20 $20 $50 Hours Per Year 2080 2080 2080 2080 2080 Total $52,000 $41,600 $41,600 $41,600 $104,000 Total: 40% Overhead $72,800 $58,240 $58,240 $58,240 $145,600 $393,120 50 Team Member Biographies Matthew Salyer – Project Manager Matthew graduated, in the spring of 2006, from Mountain Empire Community College with an Associates Degree in Computer Software. He is currently pursuing a bachelor’s degree in Computer Science at Old Dominion University. He is employed with the Virginia Department of Mines Minerals and Energy as an intern where he develops web applications and has gained experience developing web applications using Visual Basic.NET, and database programming. After graduation, Matthew hopes to continue working with the Virginia Department of Mines Minerals and Energy as a software developer. Dominic Eldridge – Software Specialist Dominic is pursuing a Bachelor’s in Computer Science at Old Dominion University. He expects to grade in 2008. He is interested in databases and network security and has developed skills in Database Administration, Network Security, UNIX/LINUX System Administration, and web design. Dominic is proficient in programming with C++ and Perl. Mark Mahn – Documentation Mark started career on a Jazz Scholarship to Hampton University and later obtained his Bachelor of Science in Government Administration, with a Legal Studies major from Christopher Newport University. Though accepted to law school, Mark opted to try some small business ventures. He served clients as prominent as International Paper. Interest in computer science, led him to Northrop Grumman where he was hired as part of a software development team for a Command and Control System currently fielded by the United States Armed Forces. In working towards a bachelor's degree in Computer Science, Mark has gained experience with Java, C++, ANSI C, Perl, and SQL. He has completed graduate level courses in Artificial Intelligence, and hopes to complete his degree in computer science in December 2008. In his spare time, Mark enjoys playing poker, which he played professionally for four years. Scott Seto – Webmaster Scott is a Computer Science senior at Old Dominion University. His interests are websites design, Java Server Pages and tennis. He is currently working on a 3D modeling project in which he is highly interested and has started a business of building websites. Scott enjoys tennis when he’s away from his computer. 51 Brad Travaglio – Marketing Brad is a senior at Old Dominion University and expects to graduate by December 2008. His major in Computer Science has sparked interests in networking and web technologies. He has become proficient with PHP, HTML, XML, mySQL, pl/SQL, Java, and C++. Scott Wood – Hardware / Risk Management Scott is currently working towards finishing a bachelor’s degree in Computer Science at Old Dominion University. He was awarded the Computer Science Achievement award at Western Branch High School in 2001, and is an intern at IssueTrak. Scott’s interests lie in Programming and Networking and he has developed programming skills in the C++, ASP, VBasic languages. 52 Conclusion Those who are affected by speech disability are disadvantage in social, professional, and emergency situations. When their inability to communicate clearly with others has negative impact on their well-being, professional, or social status they may withdraw from those situations and their quality of life suffers, and in some cases they are not able to communicate vital needs. Existing solutions to these problems fall short of reducing these disadvantages significantly, are prohibitively expensive, are difficult to use, or are too bulky to be useful to some of those affected by speech disability. The implementation of the iSa would provide a solution that does not suffer from these shortcomings and it has price point that is only a fraction of lessor devices. It provides ease of use with user-friendly features that are especially helpful to those who may suffer physical disabilities from which their speech disability may derive. Finally, it is implemented on a popular device heralded for its ease of use and hand-held, portability. We believe the iSa can be a greater help to those who suffer speech disability than existing products. 53