Resource Monitoring System 2003 SBIR GRANT PROPOSAL SOLICITATION NO. DOE/SC-0059 DOE USE - 03 - I ONLY APENDIX A. U.S. DEPARTMENT OF ENERGY COVER PAGE FOR SMALL BUSINESS INNOVATION RESEARCH (SBIR) AND SMALL BUSINESS TECHNOLOGY TRANSFER (STTR) PROGRAMS NOTICE FOR HANDLING GRANT APPLICATIONS. This submission is to be used only for DOE evaluation purposes. All government and non-Government personnel handling this submission shall exercise extreme care to ensure that the information contained herein is not duplicated, used, or disclosed in whole or in part for any purpose other than to evaluate the submission, without the written permission of the offeror (except that if a grant is awarded on the basis of this submission, the terms of the grant shall control disclosure and use). This is a Government notice, and shall not by itself be construed to impose any liability upon the Government or Government personnel for any disclosure or use of data contained in this submission. PROJECT TITLE: Resource Monitoring System SMALL BUSINESS FIRM NAME: Resource Monitoring Systems (RMS) I.R.S Entity Identification or SSN: Principal Investigator (See Requirements in Sec. 1.5.2) Indicate Mr., Mrs., Ms., Dr. Mrs. Janet Brunelle (757)683-4900 Title: Phone Number: E:mail address: brunelle@cs.odu.edu Topic No. (1-47): Subtopic (a-d): Amount Requested (not to exceed $100,000): $99,998 ADDRESS: Old Dominion University, Computer Science Department Hampton Blvd. CITY: Norfolk STATE: VA ZIP: 23529 Web Address: http://www.cs.odu.edu Corporate/Business Authorized Representatives Indicate Mr., Mrs., Ms., Dr. Title: E:mail address: Phone Number: Certification and Acceptance: I certify that the statements herein are true and complete to the best of my knowledge, and accept the obligation to comply with DOE terms and conditions if an award is made as the result of this submission. A willfully false certification is a criminal offense. (U.S. Code, Title 18, Section 1001) Signature: Date: RESEARCH INSTITUTION Check YES or NO: This grant application contains substantial collaboration with a research institution (see definition Sec. 2.9 and Sec. 1.5.3). X YES NO Check one: Please consider this application in the following program(s): X SBIR only. STTR only. both SBIR and STTR. Signature: Date: NAME OF RESEARCH INSTITUTION: $___________________ Old Dominion University Amount of Subcontract ADDRESS: Computer Science Department, Hampton Blvd. CITY: Norfolk STATE: VA ZIP:23529 Certifying Official: Indicate Mr., Mrs., Ms., Dr. Mrs. Janet Brunelle Title: Phone Number:(757)683-4900 E:mail address: brunelle@cs.odu.edu Certification: If this grant application is selected for award, I certify that the above research institution will conduct the work herin attributed to it. Signature: OTHER SUBCONTRACTORS: INDICATE NAME AND DOLLAR AMOUNT Date: CERTIFICATIONS AND QUESTIONS: ANSWER Y (YES) OR N (NO) Y 1. The above applicant organization certifies that it is a small business and meets the definition stated in Section 2.3. Y 2. The applicant small business will comply with the provisions regarding: (1) lobbying, (2) debarment, suspension, and other responsibility matters, and (3) drug-free workplace requirements. (See Certifications Section.) Inability to certify to any or all statements requires explanation. Y N N 3. The Principal Investigator will have his/her primary employment with the small business at the time of award (see Section 1.5.2). 4. Does this application include a subcontract with a Federal lab (see Section 1.6.2)? N 6. Has the firm and/or Principal Investigator submitted proposals containing a significant amount of essentially equivalent work under other federal program solicitations, or received other federal awards containing a significant amount of essentially equivalent work? If "yes", the application must include the required information requested in Section 3.3.4. N 7. Is the small business delinquent on any Federal debt? (If "yes," please attach an explanation.) N 8. If the proposed project does not result in an award, does the applicant permit the government to disclose the technical abstract of the application, and the name, address, and telephone of the business official to any inquiring parties? 5. The applicant small business has provided the necessary information requested in Section 3.3.7 if it has received more than 15 Phase II SBIR awards in the preceding five fiscal years. PROPRIETARY NOTICE (SECTION 5.4) For any purpose other than to evaluate this submission, these data shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed in whole or in part, provided that if a grant is awarded to this applicant as a result of or in connection with the submission of these data. The Government shall have the right to duplicate, use, or disclose the data to the extent provided in the grant. This restriction does not limit the Government's right to use information contained in the data if it is obtained from another source without restriction. The data in this submission subject to this restriction are contained on pages _______________________________________________________________________________________ 2 U.S. DEPARTMENT OF ENERGY SMALL BUSINESS INNOVATION RESEARCH PROGRAM SMALL BUSINESS TECHNOLOGY TRANSFER PROGRAM SOLICITATION NO. DOE/SC-0059 PROJECT SUMMARY Phase I Topic No. (1-47):____ APPENDIX B DOE USE ONLY - 03 -I Subtopic (a-d):____ (All information provided on this page is subject to release to the public.) FIRM NAME: Resource Monitoring System RESEARCH INSTITUTION: Old Dominion University ADDRESS: Old Dominion University College of Sciences Department of Computer Science Norfolk VA 23529 ADDRESS: Old Dominion University College of Sciences Department of Computer Science Norfolk VA 23529 NAME of PRINCIPAL INVESTIGATOR: ______Mrs. Janet Brunelle__________________ PHONE NUMBER: __(757) 683-4900_____________________ PROJECT TITLE: _____Resource Monitoring System_______________________________________________________________________________ _______________________________________________________________________________________________________________ TECHNICAL ABSTRACT (Limit to space provided) Statement of the problem or situation that is being addressed - typically, one to three sentences. Increasing demand, wasteful usage, and finite resources lead to energy and natural resource shortages. The United States will soon reach a point where it consumes more electricity that it can produce. General statement of how this problem is being addressed. This is the overall objective of the combined Phase I and Phase II projects - typically, one to two sentences. The purpose of the Resource Monitoring System is to provide the consumer with a means of monitoring, analyzing, and understanding their electrical utility consumption data in order to use energy resources more efficiently and responsibly. RMS will educate the consumer about their electrical usage habits and provide useful information and tips on how to decrease the amount of electricity used in order to conserve valuable non-renewable energy resources. What is planned for the Phase I project (typically, two to three sentences). The development of a prototype system that will be used to illustrate the RMS design’s viability and provide a means to correct, refine, or enhance its functionality to the clients and serve as a model for the final product. The prototype will be built using readily available and inexpensive computer and network equipment to simulate the automated meter reading systems and develop a customer database and user interface that would allow a client to view and analyze their electrical utility consumption. COMMERCIAL APPLICATIONS AND OTHER BENEFITS as described by the applicant. (Limit to space provided). 1. Utility companies such as electrical providers can use the RMS system to educate their customers to use power wisely and avoid over usage which would cause them to procure additional electricity at much higher prices or resort to blackouts if they cannot cope with the increased demand. 2. Business and Institutions could use the RMS system to analyze their energy budget in greater detail and find ways to save money. 3. The individual consumers can learn about their usage habits in greater detail and determine ways to use electricity more efficiently in order to save money and resources. SUMMARY FOR MEMBERS OF CONGRESS: (LAYMAN'S TERMS, TWO SENTENCES MAX.) RMS is a computerized system that allows you to monitor your utility usage on an hourly, daily, or monthly basis in great detail. It allows you to understand your usage habits and hopefully assist you in making wise decisions so that you can use utilities wisely. 3 2.0 RMS ABSTRACT Increased energy and water usage and a limited natural supply require a responsible society to utilize these valuable non-renewable resources as efficiently as possible. The current conventional methods of measuring and reporting usage by utility companies is insufficient in providing consumers (both residential and commercial) with a timely and convenient means of monitoring and analyzing, their consumption data in order to economically use these valuable resources. Resource demand is increasing steadily throughout the world. The use of our resources is reaching a level where in about 10 to 20 years we will consume more resources than we can afford to produce or import. A strong case in point can be made for electricity. The Department of Energy (DOE) contends that total U.S. electricity demand is projected to grow by 1.9 percent per year from 2001 through 2020. The DOE also projects that U.S. electricity production will start lag consumption around 2008 and continually get worse, leading to shortfalls past 2020. The Resource Monitoring System (RMS) is a cost-effective, web-based utility monitoring system that is adaptable to a wide variety of customers ranging from individual homeowners to large corporations and institutional facilities. It will educate businesses and homeowners on their resource usage patterns, it will inform the consumer of peak demand times and government imposed restrictions, it will provide an intuitive user interface, and it will format the data in a way that is useful to the consumer. In order to minimize costs, RMS will work with existing commercial off-the shelf automated meter hardware. The initial market for RMS will be electrical utility companies since there is great urgency for more efficient usage and a large network of automated electrical meters already is in place. RMS will receive consumer electrical usage data from utility companies, who will initially collect this data from their wireless meter network. The usage information will be stored onto a network of database servers and made available for analysis to end-users via an Internet web application. Features of the RMS end-user application will be the monitoring electricity consumption and water, natural gas, and oil consumption in the future as the system expands to other utilities. RMS will display current resource use, analyzes consumption data and displays it in graphical format, provide penalty notifications, provide peak-demand notifications, and contain a utility budgeting tool. In the future, RMS will also have water/gas leak detection and online bill payment. With its initial introduction into the electrical utility market, it is hoped that RMS will inform, educate, and persuade consumers to cut down usage by at least 6% and prevent an energy shortage crisis in the near future. 4 RMS RESEARCH GRANT TABLE OF CONTENTS SECTIONS 1.0 1.1 1.2 2.0 3.0 3.0.1 3.0.2 3.0.2.1 3.0.2.2 3.0.2.3 3.0.2.4 3.0.3 3.0.4 3.0.4.1 3.0.4.2 3.0.4.3 4.0 4.0.1 4.0.1.1 4.0.1.2 5.0 5.0.1 5.0.1.1 5.0.1.2 5.0.1.3 5.0.1.4 5.0.2 5.0.2.1 5.0.2.2 5.0.2.3 5.0.2.4 6.0 6.1 6.2 6.2.1 6.2.2 7.0 7.0.1 7.0.2 7.0.3 7.0.4 8.0 9.0 10.0 10.1 10.2 11.0 11.1 11.2 11.3 11.4 11.5 12.0 SBIR Documents Cover Page - Appendix A Project Summary Page - Appendix B Abstract Significance and Background Information Significance Background Current Electrical Usage and Economy Current Meter Reading Methods Business Operation Costs Public Awareness Proposed Solution Anticipated Public Benefits Public Benefits Business Benefits Government/Electrical Company Benefits Phase I – Proof of Concept Technical Approach Characteristics of the Solution Proving Feasibility Work Plan: Phase I – Proof of Concept System’s Major Task Task 1: Meter Reading Task 2: Transfer of data to our Database Task 3: How the Data will be Presented Task 4: User Benefits RMS Prototype Electrical Meter Cell Control Unit Dedicated Connection Database Work Plan: Phase II – Functional Prototype and Development Anticipated Phase I Results Significance of Phase I to Phase II RMS Coming Together User View of RMS Work Plan: Project Implementation Plan Phase 0 Phase I Phase II Phase III Principal Investigator and Key Personal Facilities/Equipment Contractual Aspects Subcontractors and Consultants Contractual terms with Utility Companies and their Customers Budget Detailed Phase I Budget Detailed Phase II Budget Detailed Phase III Budget Overall Budget for Phase I, II, and III Out Years Budget DOE Forms PAGE 2 2 3 4 7 7 7 7 8 8 9 9 10 10 10 10 10 10 10 11 12 12 12 12 12 12 12 13 13 13 14 15 15 16 16 17 18 18 20 22 24 25 26 26 26 28 29 29 30 31 32 33 34 5 SECTIONS 12.1 12.2 12.3 13.0 13.1 13.2 13.3 13.4 13.5 13.6 13.7 13.8 13.9 14.0 Grant Application Budget - Appendix C Application Checklist - Appendix D Worksheet Appendices Management Plan Evaluation Plan Software Plan Marketing Plan Gantt Chart Technical Objectives Risk Management Plan References Component Diagram Survey Results and Analysis PAGE 35 37 39 40 40 42 42 43 47 50 51 52 55 56 6 3.0 Significance and Background Information, and Technical Approach 3.0.1 Significance: Resource demand is increasing throughout the world. The use of resources is on its way up to a level where] in about 10 to 20 years we will consume more resources than we can afford to make or import. Our society is drawn towards the use of more technological tools, gadgets, ranging from electronic drink machines to electric cars. As a society, we have become a lot more dependant on technology. There are more machines and gadgets that are being introduced in market today than ever before, and they all use a great amount of electricity and other resources. The question rises, are we able to keep up with the energy that is being used by these devices and gadgets? Increased production of electricity is not the answer here due to the earth’s very limited natural resources. Even though new technologies are being introduced to maximize the output of these resources, we still cannot produce enough to meet our rising demands. Americans use more electricity energy than any other country in the world. Overall, 42% of the electricity consumed is being wasted due to inefficient use. Graph below shows the total consumption in America and highlighted covered black area is the over waste of electricity. 3.0.2 Background: Despite the great advances in production our resources in recent decades, we still cannot meet the public and business demand. Surveys show that we are running out of resources and a recent example of this serious problem was demonstrated just few years ago in California where electrical demand exceeded production and the whole state of California went through series of rolling black outs. This type of problem still exists in almost every state, and data shows that if we keep using electricity and other resources at our current rate, it would not be long before the entire country may have to suffer through a similar power shortage crisis. 3.0.2.1 Current Electrical Usage and Economy: With our current growing economy, and a hunger for technical devices to make our lives easier, electric demand seems to be 7 going out of control. As we can see through the graphs given below it is not far till we actually suffer from the shortage of electricity. The Graphs above show how the energy use per capita is increasing, and statistics have shown that by 2008, our demand for electricity will exceed production. This is not only dangerous for our natural resources, but also for our overall economy. During the summer of 2000, the state of California suffered an energy crisis that almost pushed it into recession. On June 14, 2000, businesses in the Silicon Valley suffered losses ranging from millions dollars per hour to millions of dollars per minute due to the blackouts. Over 100, 000 workers were unable to do their jobs and were sent home. The immediate financial losses for Silicon Valley alone, from these blackouts, were estimated in the hundreds of millions of dollars. Once effects like employee downtime, lost product and data, and the expense of retooling equipment are considered, one can see that it was absolutely devastating for an already fragile, technology driven economy. 3.0.2.2 Current Meter Reading Methods: Currently, between 5 and 10 percent of electrical bills are estimated due to the fact that meter readers can’t get to every single meter in time to perform the read. Additionally, most users are not even sure of exactly how much they are consuming for a period of about three months because electrical utility companies are unable to afford labor to check meters every single month. When actual meter reading is being done, the user is notified and bill is adjusted appropriately. In order to reduce labor cost and to get public usage as accurately as possible, electrical companies are seeking to put in new digital, automated meters, which are able to send data and meter reads through wireless media back to the power companies. In this way, electric companies can monitor and evaluate the usage pattern very accurately and can keep the electrical supply consistent. 3.0.2.3 Business Operation Cost: Business operational costs are greatly affected due to increases in electricity rates. Rising resource costs for companies to spend more than ever before. Unfortunately the rising utility costs are pushing some small businesses out of the market. Big businesses are turning to companies that offer electrical saving solutions in order to reduce their expenses. Studies done in power companies have shown that energy 8 savings of 15% or more occur when people have information that allows them to make informed decisions on how and when to use power. Businesses are moving toward the service companies that can save them money, such as WebGen, which promises to save business money by just providing them the real usage data and predicting the shortage time. This way, businesses can plan their tasks around that time of the electric or utility shortage or outage. Large corporations, such as Bank of America, are currently using the services of WebGen, and are actually saving 15 percent on their utility bills. 3.0.2.4 Public Awareness: More energy production is not a sufficient option to deal with the problem. Public awareness can be a solution, but people are not able to analyze their use accurately until after a three month period. With the installation of new digital automated meters, electric companies and big businesses can use real time data to limit their use of electric and other utilities in order to reduce their costs up to 15 percent. This technology should be used in homes, since they account for almost half of the overall electricity used in the country. 3.0.3 Proposed Solution Providing real time usage information to educate and inform the public, institutions, and corporations on their consumption habits could reduce the waste and save around 15 percent on their power bills. More and more electrical companies are adopting the use of electrical meters due business cost reduction and to provide better and more interactive service to their consumers. For example, electric companies, such as in State of California, want the public to save money and save electricity, because there is a limit to how much electricity can be produced by their suppliers. More than 15 percent reduction has been shown by several large corporations that have partnered with companies offering similar systems that provide real-time data in order for businesses to make intelligent decisions on ways to save money on electrical utilities. The Major functional diagram illustrated here shows how the actual real time data is currently being transferred to electrical companies from automated meters over a wireless network. Data will then be transferred to the RMS database from where the public would be able to access the information about their electricity use from a web-based application. A user then would be able to make appropriate decisions on their usage and take steps to reduce their waste. If groups such as WebGen are already providing this similar information to businesses and it has been proven that it can reduce the cost of a business by up to 15 percent, then making this data available to the public can significantly reduce our electricity waste. 9 Add to that the resource usage information of water, gas, and oil and one can clearly see the benefits of RMS. 3.0.4 Anticipated Public Benefits It’s not really a secret for anyone to know that saving energy such as electricity is good not only our environment, but also for our overall economy. The mission statement of almost every electrical company focuses a lot on the public satisfaction, which can only be achieved by saving people money while providing them a great service. As shown for industry through similar services, small businesses and homeowners can now also reduce their use of electricity up to 15 percent, if they can minimize their waste of electricity. All it takes is awareness, knowledge, and use the proper us of electricity. This knowledge and information can be provided if the real time data, as used by power companies, can also be provided to businesses and residential users. Saving up to 15 percent on their electricity bills would not only make consumers happy, but also help in economic growth and eliminate the possible power shortage of the future. 3.0.4.5.1 Public Benefits: Home owners could save up to 15 percent on their bills only if they are able to eliminate waste by observing the real time data and making proper adjustments to usage. 3.0.4.5.2 Business Benefits: Real-time data will help businesses reduce their utility expenses, give them ability to make wise decisions based on the usage of resources, and provide them with the ability to monitor their efficiency. 3.0.4.5.3 Government / Electric Company Benefits: Reduction in consumption would benefit the government by reducing reliance on energy imports. 4.0 Phase I – Proof of Concept 4.0.1 Technical Approach: We have to solve the problem of public awareness and knowledge of how much of our resources are being used, and the limits of what can be used in order for society to take the appropriate steps to reduce waste. Consumer knowledge and awareness is the key to solving this problem because, as of today, the majority of people are unable to track and monitor their resources in a timely or convenient manner. The purpose of the initial phase of the Resource Monitoring System is to provide the consumer with a means of monitoring, analyzing, and understanding their electrical utility consumption data in order to use energy resources more efficiently and responsibly. RMS will educate the consumer about their electrical usage habits and provide useful information and tips on how to decrease the amount of electricity used in order to conserve valuable non-renewable energy resources. In order for RMS to succeed, it must provide the following solutions: 4.0.1.1 Characteristics of the Solution: 10 Be on the market before the crisis point is reached when domestic electrical demand exceeds the available supply (Our projection is the year 2008). Be adaptable and able to monitor other utilities in the future such as water, oil, and natural gas before their respective crisis points are reached. Be marketed towards electrical utility companies, businesses, institutional facilities, and home owners Be marketable to other utility companies such as water, gas, and oil providers in the future Be a quality, reliable product and service at an affordable price Have an intuitive user interface and provide easy to read reports Provide the information, education, and impetus needed to encourage consumers to cut their electrical usage by at least 6% to avert a major power shortage crisis in the not too distant future Energy Use and Production through 2020 1200 Electricity GW 1100 1000 900 800 700 20 20 20 18 20 16 20 14 20 12 20 10 20 08 20 06 20 04 20 02 20 00 600 Year Produce Use 6% Reduction Total electricity demand is projected to grow by 1.9 percent per year from 2001 through 2020 – Energy Information Administration, U.S. Department of Energy 4.0.1.2 Proving Feasibility: This project is well within scope of current technology, it addresses an urgent power shortage problem in the not to distant future, and it should not be cost prohibitive that would exclude it from being adopted by the average home or business owner. Furthermore: The number of utility providers adopting the use of automated electrical meters for home and businesses is steadily growing. Businesses have an interest in reducing their operational costs, as illustrated by the WebGen example mentioned earlier and have a vested interest in having a dependable source of electricity as shown in the California example. Our survey data indicates that residential users would support the idea if we were able to provide them with good energy saving tips and data so they can control their usage and reduce their waste. This project relies on existing, commercially available off-the-shelf equipment that is readily available from a wide variety of sources 11 5.0 Work Plan: Phase I – Proof of Concept In order for RMS to reach its objective, the following must be accomplished for Phase I: Research, develop, build, and test a working prototype that demonstrates the technical feasibility of the RMS system Create and test a database system to store electrical usage data and customer information records Create an application to simulate electrical AMR meter data Create an application to read and analyze the data Create a web-based application server Develop a user interactive RMS website 5.0.1 System’s Major Tasks 5.0.1.1 Task 1: Meter Reading: Electrical companies such as Niagara Mohawk, Baltimore Gas & Electric, and Nashville Electric are installing digital meters. Reading the meter is done by automated electrical meters through a wireless network in which the usage data goes into the database of electric company. We can use this same data to show the utility customer their usage. 5.0.1.2 Task 2: Transfer of Data to our Database: Electrical company databases will be updated along with RMS databases. Data transfer will be done using maximum security, providing customers with confidentiality of their data. 5.0.1.3 Task 3 : How the data will be presented to users: User will see their usage in graphical and in data forms they access over a secure link over the Internet. Customers can set their limit of how much electricity is to be used every month. RMS will notify the user if they show a usage trend to exceed the self imposed limit, or a possible mandated limit, depending on the severity of an electrical shortage. 5.0.1.1 Task 4: User benefits: By seeing graphical and data information of the usage, user will be able to make a decision of what type of appliance to buy. What improvement to do the house or business to make the usage better. Setting up limits of usage will help users determine their daily consumption. 5.0.2 RMS Prototype: The RMS prototype will be used to illustrate the design’s viability and provide a means to correct, refine, or enhance its functionality to the clients and serve as a model for the final product. One of the main focuses for the prototype will be to minimize costs and resources by using readily available and inexpensive computer and network equipment to simulate the costly AMR meter and devices. Once the prototype and the simulation testing program has been successfully completed the RMS project will proceed to Phase 12 II, the development, creation, production, and deployment of the commercial version once financial resources and support have been secured. In order to minimize cost and save valuable development time, several of the more expensive items will be substituted with cheaper alternatives that can simulate the functionality of each component. 5.0.2.1 Electrical Meter: The AMR electrical meter can cost around $500/per unit to install and may be unavailable in the local Hampton Roads Area. This critical component will be modeled with an off-the shelf 802.11b wireless network interface card that can be found in an office technology store for around $30 to $80. The wireless NIC will be installed on a personal computer running a Java or C++ program that will simulate an AMR meter by continuously generating electrical consumption data and transmitting this information via a wireless network to a receiving Cell Control Unit. Examples of Inexpensive 802.111b Wireless NIC D-Link DWL-520+ PCI NIC Linksys WMP11 PCI NIC 5.0.2.2 Cell Control Unit: The Cell Control Unit receives consumption information from the AMR meter and relays over a network where it can be stored onto the RMS database. An actual Cell Control Unit Tower ranges from $10,000 to $250,000 and take several months to construct, not including the various permits and licenses required from local government and the FCC. The Cell Control Unit will be modeled with an 802.11b wireless network access point/router that again can be found in an office technology store for around $80 to $250. Examples of Inexpensive 802.111b Wireless Access Points with built-in routers D-Link DI-614+ Access Point with 4-Port Router Linksys WRT54G Access Point with 4-Port router 5.0.2.3 Dedicated Connection: Another potentially expensive component for the RMS system is the T3 internet connection required to receive metering data from a power utility company and serve thousands of web requests from the end customers. A T3 13 connection can cost up to $15,000 per month to lease, which makes it cost prohibitive for the purposes of this prototype. An inexpensive 10/100 base-T Ethernet multi-port switch costing around $40 to $60 and a network of CAT5 cable from an office technology supplier will suffice as our internet “backbone” and connect the “Cell Control Unit”. 5.0.2.4 Database: The wireless network access point/router is connected to a pair Linux servers running Apache Web Server and the MySQL database server for the RMS server applications. Upon the successful completion of AMR simulation software and the RMS server and database applications, a website will be developed to allow an end-user to view, track, and analyze their electrical consumption data and generate reports and graphs to illustrate the trends. RMS Prototype Component Diagram for Phase I: 14 6.0 Work Plan: Phase II - Functional Prototype and Development 6.1 ANTICIPATED PHASE I RESULTS In order to minimize the cost for both RMS and the electrical utility company, the system will work with existing COTS AMR electrical meter hardware. The key to AMR technology is the ERT, or Encoder Receiver Example of an Transmitter. ERTs are radio-based modules that fit on electric, gas ERT or water meters. ERTs can be retrofitted to existing meters or installed on new meters during the manufacturing process.1 The leading manufacturer of ERT’s is Itron Inc, who has produced over 20 million units. Itron Inc. is a leading technology provider and source of knowledge to the energy and water industry for collecting, analyzing, and applying critical data about electric, gas, and water usage.2 Other manufacturers of ERT’s are Rio Tronics, American Meter, and Sensus Technologies. The main benefit of using ITRON based AMR’s with RMS is that there already exists on the market a radio-based fixed network infrastructure and hardware that allow for remote data communication between a large number of utility meters to a central receiving station. Example of Itron’s fixed AMR system: The Phase II design shows the final implementation of the Resource Monitoring System. The AMR Electric Meter continuously transmits usage data via wireless RF technology to Cell Control Tower. This usage data is collected from the Electric Utility Company 1 2 http://www.mge.com/residential/AMR/amr_equip.htm http://www.businesswire.com/webbox/bw.090401/212470214.htm 15 and analyzed and stored by the RMS equipment. The data is then made available to the client via a web interface over the Internet. 6.2 SIGNIFICANCE OF PHASE I TO PHASE II Phase I will prove the technical feasibility of the Resource Monitoring System. It will also be used to develop many of the necessary web applications and database software that will be used in Phase II to build a fully functional prototype that will be tested in an actual residential and commercial environment. 6.2.1 RMS System Coming Together: The RMS Server Component Diagram illustrates the 2-tier system in which the application and database functions are separated into distinct units in order to avoid bottlenecks. Both servers are COTS standard Intel X86 based multi-processor platforms with redundant power supplies, multiple Gigabit Ethernet NICs, and RAID arrays. The OS used will be RedHat Linux Advanced Server (AS) along with the open-source Apache web server. The database server will also use Redhat AS with MySQL 4.0 as the relational database software. 16 6.2.2 User View of RMS: The utility customer will be able to access their consumption data via a web-based interface from their home or business computer. A series of easy to use screens and menus will provide access to electricity usage, analyzes consumption data and displays it in graphical format, provides penalty and peak-demand notifications, provides a budgeting tool, and in the future when other utilities such as oil, natural-gas, and water are added – leak detection and online bill payment. Examples of RMS Client Screens: RMS Main Page RMS Login Page 17 RMS Administration Page RMS Budget Alert Page 7.0 WORK PLAN Project Implementation Plan The Resource Monitoring System (RMS) project will span over two years. This project will be completed by employing a four-phase plan. Furthermore this project is divided into various Tasks, Assignments and Resources. Individual phases are described below. (Figure 1 – Project Phases) 7.0.1 PHASE 0 This phase is called the “CONCEPTION”; which will span over 65 days and it will continue between Wed 2/12/03 and Thu 5/8/03. This phase consists of variety of deliverables. The early stages of Phase 0 involve extensive research by the project members. In order for Phase 0 to be considered an accomplishment, RMS must prove the scientific / technical merit and feasibility of the system and its benefit to the funding organization. Review the chart (1.1) for an illustration of Phase 0. 18 Milestones for Phase 0 are as follow: T000-0100 INITIAL PROJECT RESEARCH T000-0200 DEVELOP PROJECT WEBSITE T000-0300 FEASIBLITY PRESENTATION T000-0310 RESEARCH SOCIETAL PROBLEM T000-0320 GOALS AND OBJECTIVES T000-0330 COMPETITION MATRIX T000-0340 FUNCTIONAL DIAGRAM T000-0350 RISK/LEGAL ANALYSIS T000-0360 RESOURCES/PERSONAL T000-0370 SURVEY T000-0380 GIVE FEASIBILITY PRESENTATION T000-0400 MILESTONE PLANNING PRESENTATION T000-0410 BUDGETS T000-0420 COST ANALYSIS T000-0430 WORK BREAKDOWN T000-0440 SCHEDULES T000-0450 RISK ANALYSIS T000-0460 GIVE MILESTONE PRESENTATION T000-0470 WEBSITE PRESENTATION T000-0500 DOCUMENTATION T000-0510 WEBSITE COMPLETION FOR FINAL PRESENTATION T000-0520 PROJECT PLAN/ FOR SBIR GRANT T000-0521 ABSTRACT T000-0522 GOALS/OBJECTIVES T000-0522 TECHNICAL APPROACH T000-0523 WORK PLAN T000-0524 MARKETING PLAN T000-0600 APPROVAL PRESENTATION T000-0610 PROJECT PLAN T000-0620 MARKETING PLAN T000-0630 BUDGET/FINANCIAL PLAN T000-0640 CONTRACTUAL ASPECTS T000-0650 EVALUATION PLAN T000-0660 GIVE APPROVAL PRESENTATION (Chart 1.1 – Project Implementation Plan Phase 0) Tasks T000-0000 PHASE 0 - CONCEPTION T000-0100 INITIAL PROJECT RESEARCH T000-0200 DEVELOP PROJECT WEBSITE T000-0300 FEASIBLITY PRESENTATION T000-0310 RESEARCH SOCIETAL PROBLEM T000-0320 GOALS AND OBJECTIVES T000-0330 COMPETITION MATRIX T000-0340 FUNCTIONAL DIAGRAM T000-0350 RISK/LEGAL ANALYSIS T000-0360 RESOURCES/PERSONAL T000-0370 SURVEY T000-0380 GIVE FEASIBILITY PRESENTATION T000-0400 MILESTONE PLANNING PRESENTATION T000-0410 BUDGETS T000-0420 COST ANALYSIS T000-0430 WORK BREAKDOWN Days 65 days 30 days 65 days 27 days 26 days 26 days 26 days 26 days 26 days 26 days 26 days 1 day 47 days 24 days 24 days 24 days Start Date Wed 2/12/03 Wed 2/12/03 Wed 2/12/03 Wed 2/12/03 Wed 2/12/03 Wed 2/12/03 Wed 2/12/03 Wed 2/12/03 Wed 2/12/03 Wed 2/12/03 Wed 2/12/03 Thu 3/20/03 Mon 2/24/03 Mon 3/24/03 Mon 3/24/03 Mon 3/24/03 Finish Date Thu 5/8/03 Tue 3/25/03 Thu 5/8/03 Thu 3/20/03 Wed 3/19/03 Wed 3/19/03 Wed 3/19/03 Wed 3/19/03 Wed 3/19/03 Wed 3/19/03 Wed 3/19/03 Thu 3/20/03 Thu 4/24/03 Mon 4/21/03 Mon 4/21/03 Mon 4/21/03 19 T000-0440 SCHEDULES T000-0450 RISK ANALYSIS T000-0460 GIVE MILESTONE PRESENTATION T000-0470 WEBSITE PRESENTATION T000-0500 DOCUMENTATION T000-0510 WEBSITE COMPLETION FOR FINAL PRESENTATION T000-0520 PROJECT PLAN/ FOR SBIR GRANT T000-0521 ABSTRACT T000-0522 GOALS/OBJECTIVES T000-0522 TECHNICAL APPROACH T000-0523 WORK PLAN T000-0524 MARKETING PLAN T000-0600 APPROVAL PRESENTATION T000-0610 PROJECT PLAN T000-0620 MARKETING PLAN T000-0630 BUDGET/FINANCIAL PLAN T000-0640 CONTRACTUAL ASPECTS T000-0650 EVALUATION PLAN T000-0660 GIVE APPROVAL PRESENTATION 24 days 24 days 1 day 1 day 10 days 10 days Mon 3/24/03 Mon 2/24/03 Thu 4/17/03 Thu 4/24/03 Fri 4/25/03 Mon 4/21/03 Thu 3/27/03 Thu 4/17/03 Thu 4/24/03 Thu 5/8/03 Fri 4/25/03 Thu 5/8/03 9 days 1 day 9 days 9 days 9 days 9 days 10 days 9 days 9 days 9 days 9 days 9 days 1 day Fri 4/25/03 Fri 4/25/03 Fri 4/25/03 Fri 4/25/03 Fri 4/25/03 Fri 4/25/03 Fri 4/25/03 Fri 4/25/03 Fri 4/25/03 Fri 4/25/03 Fri 4/25/03 Fri 4/25/03 Thu 5/8/03 Wed 5/7/03 Fri 4/25/03 Wed 5/7/03 Wed 5/7/03 Wed 5/7/03 Wed 5/7/03 Thu 5/8/03 Wed 5/7/03 Wed 5/7/03 Wed 5/7/03 Wed 5/7/03 Wed 5/7/03 Thu 5/8/03 7.0.2 PHASE 1 This phase is called the “PROOF OF CONCEPT”; which will span over 88 days and it will continue between Mon 5/9/03 and Fri 9/9/03. The phase 1 of RMS involves with designing prototype. Finally this phase ends with developing an actual working prototype for this project. Refer to the chart (1.2) for an illustration of Phase 1. Milestones for Phase 1 are as follows: T100-0100 PROCURE MATERIAL WITH SBIR FUNDING T100-0200 PROJECT DESCRIPTION PAPER T100-0300 TECHNICAL SUPPORT CONTRACT PAPER T100-0400 BUDGET WHITE PAPER T100-0500 PRODUCT USER MANUAL PAPER T100-0600 PROJECT WEB PAGE T100-0700 BUILD PROTOTYPE SYSTEM T100-0710 DATABASE DEVELOPMENT T100-0711 CREATE DATABASE T100-0712 DATABASE TESTING T100-0720 DATABASE SERVER T100-0721 INSTALLATION T100-0722 CONFIGURATION T100-0723 TESTING T100-0730 SOFTWARE DEVELOPMENT T100-0731 WRITE PROGRAM FOR RANDOM DATA GENERATOR (SAME FORMAT OF DATA READ BY AMR) T100-0732 WRITE PROGRAM TO ANALYZE THE DATA T100-0733 APPLICATION SERVER T100-0734 SOFTWARE INSTALLATION T100-0735 CONFIGURATION T100-0736 TESTING T100-0737 DEVELOP USER INTERACTIVE WEBPAGE T100-0800 TESTING PROTOTYPE 20 T100-0900 DEMONSTRATE PRODUCT PROTOTYPE T100-1000 DEVELOP INITIAL MARKETING PLAN T100-1010 CONTACT POTENTIAL CLIENT - POWER COMANPANIES T100-1020 MEET WITH POTENTIAL CLIENTS AND DEMONSTRATE LAB PROTOTYPE T100-1030 SIGN PRELIMINARY CONTRACT WITH A POWER COMPANY (Chart 1.2 – Project Implementation Plan Phase 1) Tasks T100-0000 PHASE 1 - PROOF OF CONCEPT T100-0100 PROCURE MATERIAL WITH SBIR FUNDING T100-0200 PROJECT DESCRIPTION PAPER T100-0300 TECHNICAL SUPPORT CONTRACT PAPER T100-0400 BUDGET WHITE PAPER T100-0500 PRODUCT USER MANUAL PAPER T100-0600 PROJECT WEB PAGE T100-0700 BUILD PROTOTYPE SYSTEM T100-0710 DATABASE DEVELOPMENT T100-0711 CREATE DATABASE T100-0712 DATABASE TESTING T100-0720 DATABASE SERVER T100-0721 INSTALLATION T100-0722 CONFIGURATION T100-0723 TESTING T100-0730 SOFTWARE DEVELOPMENT T100-0731 WRITE PROGRAM FOR RANDOM DATA GENERATOR (SAME FORMAT OF DATA READ BY AMR) T100-0732 WRITE PROGRAM TO ANALYZE THE DATA T100-0733 APPLICATION SERVER T100-0734 SOFTWARE INSTALLATION T100-0735 CONFIGURATION T100-0736 TESTING T100-0737 DEVELOP USER INTERACTIVE WEBPAGE T100-0800 TESTING PROTOTYPE T100-0900 DEMONSTRATE PRODUCT PROTOTYPE T100-1000 DEVELOP INITIAL MARKETING PLAN T100-1010 CONTACT POTENTIAL CLIENT POWER COMANPANIES T100-1020 MEET WITH POTENTIAL CLIENTS AND DEMONSTRATE LAB PROTOTYPE T100-1030 SIGN PRELIMINARY CONTRACT WITH A POWER COMPANY Days Start Date End Date 88 days 1 day Fri 5/9/03 Tue 9/9/03 Mon 5/12/03 Mon 5/12/03 2 days 6 days Mon 5/12/03 Tue 5/13/03 Mon 5/19/03 Mon 5/26/03 6 days 6 days 66 days 49 days 25 days 20 days 5 days 12 days 2 days 3 days 7 days 49 days 20 days Mon 5/26/03 Mon 6/2/03 Fri 5/9/03 Mon 6/2/03 Mon 6/2/03 Mon 6/2/03 Mon 6/30/03 Mon 7/7/03 Mon 7/7/03 Wed 7/9/03 Mon 7/14/03 Mon 6/2/03 Mon 6/2/03 Mon 6/9/03 Fri 8/8/03 Thu 8/7/03 Fri 7/4/03 Fri 6/27/03 Fri 7/4/03 Tue 7/22/03 Tue 7/8/03 Fri 7/11/03 Tue 7/22/03 Thu 8/7/03 Mon 6/2/03 Fri 6/27/03 Mon 6/30/03 Fri 7/11/03 10 days 1 day 1 day 3 days 5 days Mon 7/14/03 Mon 7/28/03 Tue 7/29/03 Wed 7/30/03 Fri 7/25/03 Mon 7/28/03 Tue 7/29/03 Fri 8/1/03 Fri 8/1/03 Thu 8/7/03 5 days 1 day Thu 7/31/03 Wed 8/6/03 Fri 8/8/03 Fri 8/8/03 Mon 8/11/03 Tue 9/9/03 Mon 8/11/03 Fri 8/22/03 Wed 8/13/03 Tue 8/26/03 Wed 8/27/03 Tue 9/9/03 10 days 22 days 10 days 10 days 10 days 21 7.0.3 PHASE 2 This phase is called the “FUNCTIONAL PROTOTYPE AND DEVELOPMENT”; which will span over 438 days and it will continue between Mon 9/10/03 and Thu 5/12/05. Refer to the chart (1.3) for an illustration of Phase 2. Milestones for Phase 2 are as follows: T200-0100 CONTRACT WITH POWER COMPANY T200-0110 DEVELOP TEST MARKET CONTRACT WITH POWER COMPANY T200-0120 ENTER CONTRACT NEGOTIATIONS T200-0130 SIGN CONTRACT AGREEMENT T200-0200 PURCHASING T200-0210 HARDWARE T200-0220 COMPUTER SYSTEMS T200-0230 EQUIPMENT T200-0240 CONTRACT EXPERTS T200-0300 INSTALLATION T200-0310 CONTRACT OUT INSTALLATION T200-0320 EQUIPMENT TO INSTALL T200-0400 DATABASE T200-0410 DESIGN SYSTEM TO INTERFACE WITH POWER COMPANY DATA T200-0420 MYSQL PROGRAMMING T200-0421 CREATE TABLES T200-0422 CREATE KEYS T200-0423 CODING FOR STORING AND UPDATING DATA IN DATABASE T200-0424 TESTING T200-0500 SOFTWARE T200-0510 WRITE A PROGRAM THAT ANALYZE DATA T200-0520 WRITE CODE THAT FORMAT DATA INTO A GRAPHICAL REPRESENTATION T200-0530 TESTING T200-0600 DATABASE SERVER T200-0610 SETUP SERVER SOFTWARE T200-0620 INSTALL DATABASE T200-0630 NETWORKING/CONFIGURATION T200-0640 APPLICATION SERVER T200-0650 SETUP SERVER SOFTWARE/APPLICATIONS T200-0660 INSTALL SOFTWARE T200-0670 NETWORKING/CONFIGURATION T200-0700 WEB-SITE T200-0710 DESIGN T200-0720 JAVA PROGRAMMING T200-0730 USER INTERFACE T200-0740 CONFIGURATIONS T200-0800 TESTING T200-0810 TEST SYSTEM T200-0820 SERVERS PROCESSES T200-0830 USER INTERFACE/ INTERACTION T200- 0900 DOCUMENTATION T200-0910 DOCUMENT DATABASE T200-0920 DOCUMENT SOFTWARE T200-0930 CREATE USERS MANUAL T200-1000 TRAINING T200-1010 USER GUIDELINES T200-1020 MAINTENANCE 22 T200-1030 TECH SUPPORT (Chart 1.3 – Project Implementation Plan Phase 2) Tasks T200-0000 PHASE 2 FUNCTIONAL PROTOTYPE AND DEVELOPMENT T200-0100 CONTRACT WITH POWER COMPANY T200-0110 DEVELOP TEST MARKET CONTRACT WITH POWER COMPANY T200-0120 ENTER CONTRACT NEGOTIATIONS T200-0130 SIGN CONTRACT AGREEMENT T200-0200 PURCHASING T200-0210 HARDWARE T200-0220 COMPUTER SYSTEMS T200-0230 EQUIPMENT T200-0240 CONTRACT EXPERTS T200-0300 INSTALLATION T200-0310 CONTRACT OUT INSTALLATION T200-0320 EQUIPMENT TO INSTALL T200-0400 DATABASE T200-0410 DESIGN SYSTEM TO INTERFACE WITH POWER COMPANY DATA T200-0420 MYSQL PROGRAMMING T200-0421 CREATE TABLES T200-0422 CREATE KEYS T200-0423 CODING FOR STORING AND UPDATING DATA IN DATABASE T200-0424 TESTING T200-0500 SOFTWARE T200-0510 WRITE A PROGRAM THAT ANALYZE DATA T200-0520 WRITE CODE THAT FORMAT DATA INTO A GRAPHICAL REPRESENTATION T200-0530 TESTING T200-0600 DATABASE SERVER T200-0610 SETUP SERVER SOFTWARE T200-0620 INSTALL DATABASE T200-0630 NETWORKING/CONFIGURATION T200-0640 APPLICATION SERVER T200-0650 SETUP SERVER SOFTWARE/APPLICATIONS T200-0660 INSTALL SOFTWARE T200-0670 NETWORKING/CONFIGURATION T200-0700 WEB-SITE T200-0710 DESIGN T200-0720 JAVA PROGRAMMING T200-0730 USER INTERFACE T200-0740 CONFIGURATIONS T200-0800 TESTING T200-0810 TEST SYSTEM T200-0820 SERVERS PROCESSES T200-0830 USER INTERFACE/ INTERACTION Days 438 days Start Date End Date Wed 9/10/03 Thu 5/12/05 45 days 21 days Wed 9/10/03 Tue 11/11/03 Wed 9/10/03 Wed 10/8/03 21 days 1 day 55 days 10 days 10 days 15 days 20 days 65 days 10 days 45 days 113 days 27 days Thu 10/9/03 Tue 11/11/03 Wed 9/10/03 Wed 9/10/03 Wed 9/24/03 Wed 10/8/03 Wed 10/29/03 Mon 12/8/03 Mon 12/8/03 Mon 1/5/04 Mon 3/8/04 Thu 11/6/03 Tue 11/11/03 Tue 11/25/03 Tue 9/23/03 Tue 10/7/03 Tue 10/28/03 Tue 11/25/03 Thu 3/4/04 Fri 12/19/03 Thu 3/4/04 Wed 8/11/04 Mon 3/8/04 Tue 4/13/04 68 days 5 days 2 days 15 days Mon 5/10/04 Mon 5/10/04 Mon 5/17/04 Wed 8/11/04 Fri 5/14/04 Tue 5/18/04 Wed 5/19/04 Tue 6/8/04 45 days 75 days 45 days Thu 6/10/04 Thu 8/12/04 Wed 8/11/04 Wed 11/24/04 Thu 8/12/04 Wed 10/13/04 Thu 8/12/04 Wed 10/13/04 30 days 32 days 2 days 10 days 5 days 5 days 5 days Thu 10/14/04 Thu 11/25/04 Thu 11/25/04 Mon 11/29/04 Mon 12/13/04 Mon 12/20/04 Wed 11/24/04 Fri 1/7/05 Fri 11/26/04 Fri 12/10/04 Fri 12/17/04 Fri 12/24/04 Mon 12/27/04 Fri 12/31/04 5 days 5 days 105 days 30 days 30 days 30 days 15 days 30 days 15 days 10 days 5 days Mon 1/3/05 Thu 11/25/04 Wed 8/25/04 Wed 8/25/04 Wed 10/6/04 Wed 11/17/04 Wed 12/29/04 Wed 12/22/04 Wed 12/22/04 Wed 1/12/05 Wed 1/26/05 Fri 1/7/05 Wed 12/1/04 Tue 1/18/05 Tue 10/5/04 Tue 11/16/04 Tue 12/28/04 Tue 1/18/05 Tue 2/1/05 Tue 1/11/05 Tue 1/25/05 Tue 2/1/05 45 days 23 T200- 0900 DOCUMENTATION T200-0910 DOCUMENT DATABASE T200-0920 DOCUMENT SOFTWARE T200-0930 CREATE USERS MANUAL T200-1000 TRAINING T200-1010 USER GUIDELINES T200-1020 MAINTENANCE T200-1030 TECH SUPPORT 45 days 15 days 30 days 45 days 30 days 5 days 10 days 15 days Fri 1/28/05 Fri 2/18/05 Fri 2/18/05 Fri 1/28/05 Fri 4/1/05 Fri 4/1/05 Fri 4/8/05 Fri 4/22/05 Thu 3/31/05 Thu 3/10/05 Thu 3/31/05 Thu 3/31/05 Thu 5/12/05 Thu 4/7/05 Thu 4/21/05 Thu 5/12/05 7.0.4 PHASE 3 This phase is called the “PRODUCTION”; which will span over 232 days and it will continue between Wed 5/13/05 and Mon 4/03/06. Refer to the chart (1.4) for an illustration of Phase 3. Milestones for Phase 3 are as follows: T300-0100 MARKETING PLAN T300-0110 LOBBY STATE AND FEDERAL GOVERNMENT FOR PENALTIES FOR OVERUSAGE OF ELECRICITY T300-0120 CONTACT AND MEET WITH OTHER UTILITY PROVIDERS (WATER, NATURAL GAS, OIL)" T300-0130 SERVICE CONTRACTS WITH UTILITY COMPANIES T300-0200 EQUIPMENT/SOFTWARE INSTALLATION T300-0300 CUSTOMER ACCEPTANCE TESTING T300-0400 INCORPORATE CHANGES/CORRECTIONS T300-0500 CUSTOMER FINAL ACCEPTANCE T300-0600 FINALIZE PRODUCTION T300-0700 DEVELOP OUT-YEAR STRATEGY T300-0800 DEVELOP OUT-YEAR PLAN/ORGANIZATION T300-0900 SHIFT TO OUT-YEARS (Chart 1.4 – Project Implementation Plan Phase 3) Tasks T300-0000 PHASE 3 - PRODUCTION T300-0100 MARKETING PLAN T300-0110 LOBBY STATE AND FEDERAL GOVERNMENT FOR PENALTIES FOR OVERUSAGE OF ELECRICITY T300-0120 CONTACT AND MEET WITH OTHER UTILITY PROVIDERS (WATER, NATURAL GAS, OIL) T300-0130 SERVICE CONTRACTS WITH UTILITY COMPANIES T300-0200 EQUIPMENT/SOFTWARE INSTALLATION T300-0300 CUSTOMER ACCEPTANCE TESTING T300-0400 INCORPORATE CHANGES/CORRECTIONS T300-0500 CUSTOMER FINAL ACCEPTANCE T300-0600 FINALIZE PRODUCTION T300-0700 DEVELOP OUT-YEAR STRATEGY Days Start Date End Date 232 days 120 days 90 days Fri 5/13/05 Fri 5/13/05 Mon 4/3/06 Thu 10/27/05 Fri 5/13/05 Thu 9/15/05 Fri 5/13/05 Thu 9/15/05 Fri 9/16/05 Thu 10/27/05 Mon 10/3/05 Fri 10/21/05 20 days 36 days Mon 10/24/05 Fri 11/18/05 Mon 11/21/05 Mon 1/9/06 20 days 15 days 5 days Tue 1/10/06 Tue 2/7/06 Tue 2/28/06 Mon 2/6/06 Mon 2/27/06 Mon 3/6/06 90 days 30 days 15 days 24 T300-0800 DEVELOP OUT-YEAR PLAN/ORGANIZATION T300-0900 SHIFT TO OUT-YEARS 15 days 5 days Tue 3/7/06 Mon 3/27/06 Tue 3/28/06 Mon 4/3/06 8.0 PRINCIPAL INVESTIGATOR AND KEY PERSONEL General Manager/Principal Investigator: Janet Brunelle - General manager of RMS. Mrs. Brunelle holds a Ph.D in Business Management and a MS in Computer Science, both from Old Dominion University. She currently sidelines as a Computer Science Instructor at Old Dominion University in her spare time. Contact: brunelle@cs.odu.edu Project Manager: Michael J. Higgins is currently a senior at Old Dominion University seeking his bachelor's degree in computer science, focusing on systems programming/engineering with a minor in computer engineering. He is currently employed as a co-op for the government. His interests include systems programming and web development. He is currently the RMS project manager in cs410. Contact: mhiggins10@cox.net Research & Development Manager: Anthony Virata is the Research and Development Manager for RMS. Mr. Virata holds a BS in Mechanical Engineering from Old Dominion University and is currently working on a second BS degree in Computer Science also from Old Dominion University. He has worked for 3 years as an engineer for Clark•Nexsen and is now currently working for SPAWAR as a computer scientist. Contact: aavirata@cox.net Marketing & Sales Analyst: Gary Calpo, 23, is working towards a BS in Computer Science with a minor in Computer Engineering. He currently attends ODU as a full-time student and writes utilities for www.fliptech.net in his free time. He plans on completing his course work in Computer Science after fall 2003. Contact: g_calpo@yahoo.com Web Development: Khuram Imtiaz is the Web Developer and Graphics Designer for RMS. He graduates from Old Dominion University in May 2004. He is currently working at Dynamic Systems Integration, a company that provides software, web, and network solutions. Khuram is working as a Software and Web Developer at DSI. He has knowledge of different web programming and scripting languages that includes: ASP.NET, VB.NET, PHP, ASP, COM and JavaScript. He plans on using his skills in the further progress of RMS. Contact: khurmie@hotmail.com Finance Manager: 25 Abdul Khan is the Finance Manager for RMS. Mr. Khan is pursuing his bachelors in computer science from ODU. Contact: abdulkhan1@msn.com Legal Analyst: Joseph Banks is a Legal Analyst for RMS. Mr. Joseph is a senior attending Old Dominion University as a full time student in the faculty of computer science. His interests in the computer science field include graphics and database programming. After he graduates, he plans to work as a full time employee and pursue his Masters degree part time. Contact: jbank007@yahoo.com 9.0 FACILITIES/EQUIPEMENT The RMS system will be developed at Old Dominion University’s Computer Science Department. The project will use the university’s existing resources such as computer and network labs, offices, storage and work areas, and ancillary services such as administrative and business offices. The cost for these resources and services will be covered through a 40% overhead factor in the RMS labor budget. All equipment and services required for the RMS project will be purchased using SBIR funding, and a detailed list has been provided in the Detailed Phase I Budget in Section 11.1, specifically under the Software and Hardware Components. 10.0 CONTRACTUAL ASPECTS Resource Monitoring System (RMS) will utilize the services of subcontractors to facilitate design and development of the project during Phases I (functional prototype) and II (system development). Below are descriptions of several subcontractors that we will employ during these phases. We will use expert consultants as necessary in order to assure the success of the project. RMS will have the need for a legal consultant to evaluate the legal validity of our project and the research potential paperwork, contracts, and forms to be processed by our organization. A software/database consultant and financial/marketing consultant will also be employed. RMS will also have contractual relationships with the utility companies and customers due to privacy rights and security requirements. 10.1 Subcontractors and Consultants Equipment Installation Technician Responsible for the initial equipment installation for the prototype design, which includes two electrical automated meters. Requires a bachelor's degree in related area and 4 years of experience in the field or in a related area. Has knowledge of networking equipment and other computer components. Works under general supervision; typically reports to the system manager. 26 Network Installation Technician Responsible for all the hardware components and installation for network infrastructure such as Cisco router, servers, firewall and computers. Requires a bachelor's degree in related area and 4 years of experience in the field or in a related area. Has knowledge of networking equipment and other computer components. Works under general supervision; typically reports to the system manager. JAVA /Web Programmer Reviews and analyzes programming systems including encoding, testing, debugging and documenting for RMS. Designs, modifies, develops, writes and implements software programming applications required for RMS. Supports and/or installs software applications. Participates in the testing process through test review and analysis, test witnessing and certification of software. Configures the software and web-site. Has knowledge of commonly used concepts, practices, and procedures utilized within the technology field. Works under general supervision; typically reports to the project manager. We plan to subcontract Soft-offshore Association (SOA), a group of St Petersburg based companies that specialize in remote software development for international customers, for all programmers that will be need to perform the programming tasks. Most of programmers have master’s degrees. SQL Programmer Reviews and analyzes programming systems including encoding, testing, debugging and documenting for RMS. Designs, modifies, develops, writes and implements the database and applications required for RMS. Supports and installs database applications. Participates in the testing process through test review and analysis. Has knowledge of commonly used concepts, practices, and procedures utilized within the technology field. Works under general supervision; typically reports to the project manager. We plan to subcontract Soft-offshore Association (SOA), a group of St Petersburg based companies that specialize in remote software development for international customers, for all programmers that will be need to perform the programming tasks. Most of programmers have master’s degrees. Lobbyist RMS plans to contract a lobbyist to try and get legislators and city councils to impose penalties for energy and water overuse. This will definitely be a benefit for RMS. Plan to contract Larry Swann, a former legislator from Doddridge County who now lobbies in several issue areas, including gambling, health and utilities. He also has a solid understanding of information and technology. Relies on experience and judgment to plan and accomplish goals. Works under general supervision; typically reports to legal manager. Document Specialist Prepares and/or maintains documentation pertaining to programming, systems operation and user documentation of RMS. Translates business specifications into user documentation. Works on training guides and user manuals. Requires a bachelor's degree 27 in related area and 4 years of experience in the field or in a related area. Has knowledge of commonly used concepts, practices, and procedures utilized within the technology field. Works under general supervision; typically reports to legal manager. Lawyer Has knowledge of commonly used concepts, practices, and procedures utilized within the technology field. Relies on instructions and pre-established guidelines to perform the functions of the job. Creates, writes, negotiates and reviews hardware and/or software licensing contracts, purchasing contracts for required materials, and production and development contracts for RMS. Works with the RMS team in establishing agreements that reflect the interests of the company. Also works drafting licensing agreements. Must have a solid understanding of information and web technology. Relies on limited experience and judgment to plan and accomplish goals. Works under general supervision; typically reports to legal manager. RMS plans to contract a lawyer from Faegre & Benson law firm. Their lawyers have handled some complex and challenging transactions, invasion of privacy, access to Government information, and data privacy matters in nearly every U.S. State. Software/Database Consultant Reviews and analyzes programming systems including encoding, testing, debugging and documenting for RMS. Designs, modifies, develops and implements software programming applications required for RMS. Supports and/or installs software applications. Has knowledge of commonly used concepts, practices, and procedures utilized within the technology field. Works under general supervision; typically reports to system manager. We plan to subcontract Soft-offshore Association (SOA) for all consultants that will be need. Financial / Marketing Specialist Responsibilities include design, implementation, and analysis of budget, accounting, purchasing, and marketing aspects of product. Responsibilities also include purchasing and negotiating materials, equipment, and supplies from vendors. Evaluates vendor quotes and services to determine most desirable suppliers. Must be qualified CPA. Have 5 years of business experiences. Finally responsible for marketing acquiring media contracts and implement of market strategies towards target demographic. Two years marketing or similar experiences required. Works under general supervision; typically reports to the finance manager. 10.2 Contractual terms with Utility Companies and their Customers Our targeting users, the homeowners and businesses must have access to a computer with dial up capability such as phone line, modem or wireless and Internet Service Provider in order to view and use the RMS interactive web-site on the World Web Wide. RMS will not be responsible for any personal computers, dial-up problems or charges. Our initial market is within the electricity companies market. The city public works (water) and gas companies are potential in a later phase. The utility companies must sign up with RMS on agreeable terms stated in contracts. These utility companies will provide 28 resources such as customer data that is read by the automated meters they already have in place or in progress of installing. RMS servers will communication with the utility companies’ database servers for the customers metering data. The data will be transfer to RMS based on customer preference along with written permission and agreement contracts to prevent a violation of privacy. RMS and utility companies will have contract agreements for the following: Cost percentage for customer signup Customer data supply and confidential protection To begin building prototype RMS and utility customers: Terms of agreement for access to confidential data to use by RMS Personal information protection 11.0 BUDGET 11.1 Detailed Phase I Budget Phase I Budget Software Component Description Database/Application Server: NuSphere PHPed - MySQL/PHP/Apache Operating System: RedHat Linux 9 Professional Dreamweaver MX SSL Certificate Miscellaneous Software Tools Quantity Unit Cost Sub Total 2 $299.00 $598.00 2 4 1 1 $149.00 $700.00 $200.00 $845.00 $298.00 $2,800.00 $200.00 $845.00 Software Total $4,741.00 Hardware Component Description Dual processor Server Monitor for Server KVM Switch Workstation w/OS and Office Suite Wireless Network Card Wireless Network Access Point/Router Managed Fast Ethernet Switch Laptop Computer w/OS and Office Suite Miscellaneous cables, connectors, tools. Hardware Total Quantity 3 1 1 11 1 1 1 11 1 Unit Cost $2,000.00 $450.00 $500.00 $2,000.00 $150.00 $200.00 $500.00 $2,000.00 $800.00 Sub Total $6,000.00 $450.00 $500.00 $22,000.00 $150.00 $200.00 $500.00 $22,000.00 $800.00 $52,600.00 29 Labor Component Description Project Manager Research Manager Finance Manager Legal Manager Marketing Manager Lawyer Quantity (hours*) 160 80 80 80 240 80 Unit Cost $36.10 $30.70 $30.70 $30.70 $30.70 $43.30 Subtotal Overhead @ 40% Labor Total Sub Total $5,776.00 $2,456.00 $2,456.00 $2,456.00 $7,368.00 $3,464.00 $23,976.00 $9,590.40 $33,566.40 Phase Total Software Total Hardware Total Labor Total Contingency @ 10% $4,741.00 $52,600.00 $33,566.40 $9,090.74 Overall Phase I Total $99,998.14 * Covers the period from after CS 411 to the end of Phase I 11.2 Detailed Phase II Budget Phase II Budget Software Component Description Database/Application Server: NuSphere PHPed Advantage - MySQL/PHP/Apache Operating System: RedHat Enterprise AS Dreamweaver MX SSL Certificate Miscellaneous Software Tools Quantity Unit Cost Sub Total 10 10 2 1 1 $495.00 $1,499.00 $700.00 $200.00 $1,000.00 $4,950.00 $14,990.00 $1,400.00 $200.00 $1,000.00 Software Total $22,540.00 Hardware Component Description Dual processor Server RAID Storage Monitor for Server KVM Switch Cisco 515 PIX Firewall Cisco Router T1 Leased Line Workstation w/OS and Office Suite Quantity 10 5 2 2 1 1 12 10 Unit Cost $2,000.00 $5,400.00 $450.00 $500.00 $2,695.00 $5,000.00 $700.00 $2,000.00 Sub Total $20,000.00 $27,000.00 $900.00 $1,000.00 $2,695.00 $5,000.00 $8,400.00 $20,000.00 30 Managed Gigabit Ethernet Switch 48-port Electrical AMR Miscellaneous cables, connectors, tools, additional software 2 2 $2,500.00 $500.00 $5,000.00 $1,000.00 1 $1,000.00 $1,000.00 Hardware Total $91,995.00 Labor Component Description Project Manager Research Manager Finance Manager Legal Manager Webmaster/Software Manager System Manager DBA SQL Programmer (2) Java/Web Programmer (2) Lawyer Technician (3) Document Specialist (2) Quantity (hours) 984 1936 160 416 2992 536 912 2432 2080 512 360 720 Unit Cost $36.10 $30.70 $30.70 $30.70 $30.70 $30.70 $30.70 $26.30 $26.30 $43.30 $16.83 $13.00 Subtotal Overhead @ 40% Labor Total Sub Total $35,522.40 $59,435.20 $4,912.00 $12,771.20 $91,854.40 $16,455.20 $27,998.40 $63,961.60 $54,704.00 $22,169.60 $6,058.80 $9,360.00 $405,202.80 $162,081.12 $567,283.92 Phase Total Software Total Hardware Total Labor Total Contingency @ 10% $22,540.00 $91,995.00 $567,283.92 $68,181.89 Overall Phase II Total $750,000.81 11.3 Detailed Phase III Budget Phase III Budget Software Component Description Operating System: RedHat Enterprise AS Database/Application Server: NuSphere PHPed Advantage - MySQL/PHP/Apache SSL Certificate Miscellaneous Software Tools Software Total Quantity 15 Unit Cost $1,499.00 Sub Total $22,485.00 15 1 1 $495.00 $200.00 $2,000.00 $7,425.00 $200.00 $2,000.00 $32,110.00 31 Hardware Component Description Dual processor Server RAID Storage Monitor for Server KVM Switch T3 Leased Line Managed Gigabit Ethernet Switch 48-port Miscellaneous cables, connectors, tools. Quantity 15 10 3 3 12 5 1 Unit Cost $2,000.00 $5,400.00 $450.00 $500.00 $10,000.00 $2,600.00 $1,500.00 Hardware Total Sub Total $30,000.00 $54,000.00 $1,350.00 $1,500.00 $120,000.00 $13,000.00 $1,500.00 $221,350.00 Labor Component Description Project Manager Research Manager Finance Manager Legal Manager Marketing Manager Webmaster/Software Manager System Manager DBA SQL Programmer (2) Java/Web Programmer (2) Lawyer Lobbyist Technician (3) Quantity (hours) 1000 320 320 560 1040 1208 608 288 288 288 960 720 320 Subtotal Overhead @ 40% Labor Total Unit Cost $36.10 $30.70 $30.70 $30.70 $30.70 $30.70 $30.70 $30.70 $26.30 $26.30 $43.30 $43.30 $16.83 Sub Total $36,100.00 $9,824.00 $9,824.00 $17,192.00 $31,928.00 $37,085.60 $18,665.60 $8,841.60 $7,574.40 $7,574.40 $41,568.00 $31,176.00 $5,385.60 $262,739.20 $105,095.68 $367,834.88 Phase Total Software Total Hardware Total Labor Total Contingency @ 10% Overall Phase III Total $32,110.00 $221,350.00 $367,834.88 $62,129.49 $683,424.37 11.4 Overall Budget for Phase I, II, and III TOTALS FOR PHASE I, II, AND III Phase I Phase II Phase III $99,998.14 $750,000.81 $683,424.37 32 OVERALL TOTAL $1,533,423.32 11.5 Out Years Budget Out Years Budget Software Component Description Redhat Enterprise Service Level Subscription PHPed Technical Support Cisco Pix Firewall Tech Support Cisco Router Tech Support Miscellaneous Software Tools Quantity Unit Cost Sub Total 25 25 1 1 1 $96.00 $299.00 $2,900.00 $5,675.00 $2,000.00 $2,400.00 $7,475.00 $2,900.00 $5,675.00 $2,000.00 Software Total $20,450.00 Hardware Component Description T3 Leased Line Quantity 12 Unit Cost $10,000.00 Hardware Total Sub Total $120,000.00 $120,000.00 Labor Component Description Project Manager Research Manager Finance Manager Legal Manager Marketing Manager Webmaster/Software Manager System Manager SQL Programmer (1) Java/Web Programmer (1) Lawyer Lobbyist Customer Service Technician (10) Subtotal Overhead @ 40% Labor Total Quantity (hours) 2080 2080 2080 2080 2080 2080 2080 2080 2080 2080 550 20800 Unit Cost $36.10 $30.70 $30.70 $30.70 $30.70 $30.70 $30.70 $26.30 $26.30 $43.30 $43.30 $16.83 Sub Total $75,088.00 $63,856.00 $63,856.00 $63,856.00 $63,856.00 $63,856.00 $63,856.00 $54,704.00 $54,704.00 $90,064.00 $23,815.00 $350,064.00 $1,031,575.00 $412,630.00 $1,444,205.00 Phase Total Software Total Hardware Total Labor Total Contingency @ 10% Overall Outyear Total $20,450.00 $120,000.00 $1,444,205.00 $158,465.50 $1,743,120.50 33 12.0 DEPARTMENT OF ENERGY (DOE) FORMS 34 DOE F-4620.3 (09-90) APPENDIX C U.S. DEPARTMENT OF ENERGY SMALL BUSINESS INNOVATION RESEARCH (SBIR) AND SMALL BUSINESS TECHNOLOGY TRANSFER (STTR) GRANT APPLICATION BUDGET (Please Print or Type) FIRM NAME: Resource Monitoring System A. PERSONNEL (Employees) NAME Michael J. Higgins Anthony A. Virata Joseph Banks Gary Calpo Khuram Imtiaz Abdul Khan ROLE IN PROJECT EST. HOURS 160 80 80 240 0 80 HOURLY RATE 36.10 30.70 30.70 30.70 30.70 30.70 B. CONSULTANTS NAME ROLE IN PROJECT EST. HOURS HOURLY RATE Faegre & Benson law firm Lawyer 80 43.30 \ Project Manager Research Manager Legal Manager Marketing Manager Web/Software Manager Finance Manager FRINGE TOTAL COST BENEFITS 5,776.00 2,456.00 2,456.00 7,368.00 0 2,456.00 3,464.00 C. LEASED EQUIPMENT (Specify Time and Rate, or Other Basis) ITEM None AMOUNT D. PURCHASED EQUIPMENT ITEM Database/Application Server: NuSphere PHPed - MySQL/PHP/Apache x 2 @ $299.00 Operating System: RedHat Linux 9 Professional x 2 @ $149.00 Dreamweaver MX x 4 @ $700.00 SSL Certificate Miscellaneous Software Tools Dual processor Server x 3 @ $2,000.00 Monitor for Server $450.00 KVM Switch $500.00 Workstation w/OS and Office Suite x 11 @ Wireless Network Card $150.00 Wireless Network Access Point/Router $200.00 Managed Fast Ethernet Switch Laptop Computer w/OS and Office Suite x 11 @ Miscellaneous cables, connectors, tools. $598.00 $298.00 $2,800.00 $200.00 $845.00 $6,000.00 $450.00 $500.00 $22,000.00 $150.00 $200.00 $500.00 $22,000.00 $800.00 $2,000.00 $500.00 $2,000.00 $800.00 E. TRAVEL N/A 35 F. OTHER DIRECT COSTS 1. Materials and Supplies………………………………………………………………………………………………….......... ...............… 2. Publication Costs…………………………………………………………………………………………………………..... ..............…… 3. Testing Services (Including work at Government Installations)………………………………………………......................…… 4. Computer Services………………………………………………………………………………………………………... .....................… 5. Research Institution………………………………………………………………………………………………………. .....................… 6. Other Subcontracts................................................................................................................................. ...................................... 7. Other……………………………………………………………………………………………………… ……………….........................… TOTAL OTHER DIRECT COSTS…………………………………………………………………………………………….............. ..............… G. TOTAL DIRECT COSTS (A through F) $81,367.00 H. INDIRECT COSTS (Specify Rate and Base) Overhead expenses @ 40% labor rate = $9,540.40 Contingency expenses @ 10% total budget = $9,090.74 TOTAL INDIRECT COSTS $18,631.14 I. TOTAL COSTS (G plus H) $99,998.14 J. FEE OR PROFIT 0 K. TOTAL AMOUNT OF THIS REQUEST (Item I plus J) $99,998.14 L. Has any executive agency of the United States Government performed any review of your accounts or records in connection with any other grant or contract within the past year? Yes No. If Yes, give name, address, and phone number of reviewing office and official: No M. CORPORATE/BUSINESS AUTHORIZED REPRESENTATIVE - TYPED NAME AND SIGNATURE DATE: (Signature) 36 APPLICATION CHECKLIST APPENDIX D (Not Counted in the 25-page Limitation) Firm Name: Resource Monitoring System Project Title: Resource Monitoring System Please complete both sides and paper clip (one copy only) to the cover sheet of the original (signed) copy of the grant application. DOES THE APPLICATION SATISFY THE FOLLOWING REQUIREMENTS: Yes X No One, and only one, topic from the Technical Topics Section identified on the cover page. One, and only one, subtopic from the Technical Topics Section identified on the cover page. X The cover page is completed and signed by all authorizing parties. X Principal Investigator will work a minimum of 195 hours or at least 5 hours / wk on the project. X All certifications and questions on cover page marked Y (yes) or N (no). X Amount requested from Government is not in excess of $100,000. X The project summary contains the same topic and subtopic as selected on the cover page. X Abstract contains no proprietary information and does not exceed space provided on the Project Summary Page (Appendix B). X Main text (technical content) is included as requested in Section 3.3. X Application, including all enclosures, not more than 25 pages. However, this checklist (Appendix D) and the Documentation of Multiple Phase Awards (Section 3.3.7) will not be included in the 25-page count. X No font smaller than 12 point times new roman in main text. X No pages other than 8 1/2” x 11”. X Level of effort in compliance with Section 3.3.5a. (For SBIR, the small business must perform at least 2/3 of the research and analytical effort. For STTR, the small business must perform at least 40% and the research institution must perform at least 30%.)* X * For grant applications that are to be considered for both SBIR and STTR, prepare the grant application to meet the requirements of the SBIR program. If the application is selected for STTR, budgetary adjustments can be completed during the negotiation period before the grant begins. ATTENTION: GRANT APPLICATIONS NOT MEETING ALL OF THE ABOVE REQUIREMENTS WILL BE DECLINED WITHOUT FURTHER ACTION. 37 STATISTICAL INFORMATION Yes The proposing firm certifies that it is a socially and economically disadvantaged small business. (See Section 2.4.) No X The proposing firm certifies that it is a women-owned small business. (See Section 2.5.) X The proposing firm is located in a HUB Zone. (See Section 2.7.) X 38 WORKSHEET For calculating the percent of the research and analytical effort performed by the small business, the research institution, if any, and other consultants or subcontractors (see Section 3.3.5.a.) Small Business Research Institution (if any) Other Consultants and/or Subcontractors (1) Total Value of Project (line I + line J from budget page $96,534.14 (2) Value of leased, purchased, or in-kind equipment, and materials & supplies (3) = (1) - (2) Research or analytical effort (4) Percentages (Divide entries on line (3) by total for line (3).) TOTAL $99,998.14 $0.00 $3,464.00 (lines C+D+F1 from budget page) (Applicable portion of Research Institutions subcontract) (Applicable portion of consultant and/or other subcontracts) $57,391.00 $0.00 $0.00 $57,391.00 $20,512.00 $18,631.14 $3464.00 $42,607.14 48% 44% 8% 100% 39 13.0 APPENDICES 13.1 MANAGEMENT PLAN The management structure in the figure below has been in place since January 2003. The General Manager oversees the entire project from inception to production. The Project Manager directs the individual department managers in their responsibilities, works to keep the project on schedule, and addresses problems that arise when deadlines are not met. The Project Manager has also developed a Project Implementation Plan that will guide us through each of the three project phases. The Finance Manager handles all budget issues, including personnel costs, resource requirements, and allocation of received funding. He also has contacted funding agencies and assessed their qualifications based on mission statement, monetary allotment and schedule history. The manager of the Research and Development Department designed our product, determined the development timeline, established testing and evaluation procedures, and has supplied information on the history of the problem area our product is addressing as well as future projections on this area. The Research and Development Manager has developed a Work Breakdown Structure containing a Gantt chart detailing our tasks, their beginning and completion dates, and the parallel and interdependence status of each task. The Marketing Manager has developed our marketing strategy and plan and has also determined the agencies and individuals with which we must arrange contract agreements. Our Web Master has created the company web page containing company information, documentation, and product description and he has also developed artwork used by RMS. The Project Manager is carrying out the duties of Editor and Presentation Coordinator. All members of our team assist with questions during company presentations. Initial Management Structure: 40 As development of the project continues, the management structure will be expanded. The figure below illustrates this tentative expansion, but will not be finalized until the beginning of Phase II. 41 13.2 EVALUATION PLAN Throughout the life of the project, periodic evaluations will occur to assess the Project State. Following are the methods, along with a detailed description, that will be utilized for these assessments. Periodical reporting will be used to track progress of the project. Program Design Reviews A program design review will be conducted during each phase of the RMS project. This review between the project manager, contractors and managers allows the monitoring of progress on the project during the early stages of each phase. Technical Review Evaluates the direction taken in design, development, and testing of the project Preliminary Design Review (PDR) Preliminary Design Review (PDR) is the critical technical review in a series of reviews, which will be used to establish the technical soundness of the performance baseline, and obtain feedback and recommendations from experts on how the design, plans, and cost and schedule estimates could be improved. Critical Design Reviews (CDR) A critical design review will be conducted during each phase of the RMS project. The CDR is a significant milestone in the life of the RMS project. Results of all these reviews will be tied directly to future funding of each project phase. Quality Reviews The quality review will be conducted on the RMS product prior to completion. Specifications will be developed for this review during the later phase of production. The formulation of these specifications will be a joint effort between the RMS team and all subcontractors involved in the development of the system. Evaluate the processes used by team members to perform tasks. Evaluate deliverables for compliance with contractual requirements. Recommend corrective and preventive actions if necessary. Customer Acceptance Test At time of completion, the RMS team will conduct a customer acceptance test on the fully assembled functioning system. The formulation of the test specifications will be a joint effort between the RMS team and all contractors involved in the development of the system. 13.3 SOFTWARE PLAN Server Application RMS plans to develop software to run on the application server. In the prototype and system design, we will implement a server software application that will interface with the RMS web- 42 site. The software will be implemented on PC in Java, a high-level programming language. Java technology is an object-oriented, platform-independent, multithreaded programming environment. It is the foundation for Web and networked services and allows us to securely extend our project through platform independence. The application will be compiled using GCJ, a portable, optimizing, ahead-of-time compiler for the Java Programming Language. Debugging is supported using recent versions of the GNU debugger GDB. The software will use the real-time automated read consumption data of individual clients to provide current usage and to analyze for budging functions. Analyze consumption data will be used to produce graphs for the customer. There will be alerts and graphical indication for high consumption increasing near penalty use for imposed restrictions amount. Analyze for tremendous high consumption to alert an indication for leaks. The application will also inform the consumer of peak demand times. User Interface The graphical user interface will rely upon the web-site design. The user interface for the software will be configured with the RMS client main web page. 13.4 MARKETING PLAN The commercial potential of the Resource Monitoring System (RMS) lies in the finite nature of resources distributed by utility companies and the desire of such companies to curtail consumption of these resources. The primary business of these utilities is the acquisition and sales of electricity, water, oil, and natural gas. In the United States, the demand of a commodity as ubiquitous as electricity is projected to exceed local supply by the year 2008. To avoid this, utilities must either build additional sources (power generators, water pipelines) or find means to limit consumption. RMS will provide the latter as a far more cost effective solution. Undertaken by the RMS Group, an informal study (see Section 14.0) has found that 9 in 10 respondents found the rising costs of resources of at least some importance (Question 3). 5 in 6 respondents would find use in tracking of their resource usage (Question 4). 7 in 10 respondents admitted that they felt they were not using their resources effectively 43 (Question 12). RMS will address these desires to monitor and more effectively use resources. If nothing more, RMS would give utility companies in competitive deregulated markets a distinct advantage. 5 in 6 survey respondents would favor a utility offering RMS over a competing utility that did not offer RMS (Question 5). In the example of electricity monitoring, users empowered with RMS and rates that offer additional discounts for low monthly kilowatt-hour totals will help drive down electricity usage. Another type of rate plan that can be paired with RMS is Time of Use (TOU) pricing which offers significant discounts on off-peak (early-morning/late-evening) usage but higher-than-normal rates during peak times (usually 9 to 5). RMS users would be able to track their hour-by-hour usage and minimize their on-peak usage by shifting activities to off-peak times. By reducing overall electricity demands—especially peak demand—utility companies will rely less upon backup generators that tend to cost more to operate than their regular generators. In some instances, utilities may avoid the necessity of rolling blackouts which characterized California summers in 2000-01. While there are several similar services that offer subsets or supersets of the capabilities of RMS geared mainly to large businesses, RMS group aims to capture portions of the same markets in addition to large untouched markets (homeowners) where other services cannot effectively compete due to prohibitive costs. The initial marketing strategy of the RMS group will be to establish relationships with electric companies with sufficiently advanced meter technology. Such technologies would permit RMS users to access resource consumption statistics with minimal delay. RMS group chooses electric companies over other markets such as water and natural gas because of the immediate risk of electricity consumption exceeding local production in only 5 years. By comparison, the other markets’ resources are in less immediate danger. The preliminary target would be Nashville Electric Service (NES). NES has a relatively small base of 200,000 customers. Only 17,500 of which will be compatible with RMS service with little or no modification to their existing meters. Through this partnership, NES customers will receive free RMS service for most of the Phase II period of over a year. This initial market will provide RMS with the experience to expand to larger markets in Phase III. In Phase III, RMS will continue its partnership with NES and establish a relationship with Duquesne Light in Pittsburgh, Pennsylvania. Unlike Nashville Electric, every customer of Duquesne Light can receive RMS service with little or no modification to existing meters. This combined user base would be about 600,000 members in size. The monthly service rate for RMS service will be $1.00 per month per customer and will be charged directly to the utilities. The utilities, in turn, will have the option of absorbing the costs of RMS for their customers or simply pass the costs along as a non-disputable $1.00 fee. This passing-along of fees would be similar to the ubiquitous FCC fees for 44 wireless phone services. With this expanded market size, a profit will be realized within the first few months of Phase III and this profit will continue to grow into the out years. During Phase II and Phase III, communication will be established with additional prospective customers (utilities). In the out years, RMS will seek to form partnerships with PECO Energy of Philadelphia, Pennsylvania, and Kansas City Power & Light. These utilities have large user bases, and individual meters will not have to be modified. The combined user base will grow to over 3 million users. Keeping the $1.00 monthly user fee, income would exceed $40 million annually. While this figure may seem impressive for a service that is planned to cost $1.7 million to operate annually, the monthly charge of $1.00 is not necessarily excessive. $1.00 a month is a small price to pay given the potential of customers to save sizable amounts of money off their utility bills annually. Furthermore, operational cost does not fully anticipate hardware and personnel demands beyond the first year. Portions of surplus income will be reinvested in expansion and the covering of the true operational costs. The remainder of surplus income could conceivably be invested in expanding RMS capabilities. For example, RMS could contact out “smart meter” installers to effectively create market opportunities where there were none before. The effectiveness of RMS can be largely enhanced by a promotional campaign highlighting the benefits of RMS service. The costs for this advertising would initially be at the discretion of the partnered utility companies, but to gain a greater mindshare, RMS may directly invest in advertising of its own. Future expansion will not be limited to electric companies. During the out years, RMS will research the expansion to water, natural gas, and heating oil providers. Doing so would double if not triple the potential market. Already RMS group has identified potential initial markets in these areas. Similar to the markets identified for electricity, these utility companies have an already-existing user base with smart meters. RMS expansion into water utilities would begin with Boston Water & Sewer Commission (79,000 customers). Expansion into natural gas providers would begin with Nicor Gas serving Northern Illinois (10,000 customers). While there are no known existing “smart meter” equipped heating oil tanks, a possible partnership with Switzerland-based Sensile Technologies could help form that market. With RMS attaining credibility, expansion may go beyond American borders. Since finite resources are not limited to the United States alone, Resource Monitoring System may find a lucrative international market. This direction will require extensive research into international and foreign laws and policies. Also, internet service in many foreign countries is not as ubiquitous as it has become in the United States. 45 46 13.5 GANTT CHART Entire Project (Phases 0, 1, 2, and 3): Phase 0 (Major Milestones): Phase 1 (Major Milestones): 47 Phase 2 (Major Milestones): Phase 3 (Major Milestones): 48 Gantt Chart: Entire Project with all Tasks and Subtasks 49 13.6 TECHNICAL OBJECTIVES To design, develop and carry out clinical trials for new and innovative ways to save electricity in United States, based on the fact that information and data will be delivered to the customers in real time, enabling them to make decision regarding their usage. Scattered resources of electrical companies such as energy saving tips and information on the different products can be unified in RMS to give customer a more broad view of tips, and techniques available to reduce electrical waste. As it is already proven for the businesses, information to customers about their usage is the key to success in order to reduce the electrical waste, and it can be accomplished for the home user. The overall RMS goal is a 15 percent reduction of our electrical resources, leading toward saving resources, and a decrease in operating costs for the power plants. More awareness is the answer to deal with the shortage of electricity. RMS will: Use meters, sensors, and software for analyzing data Use off the shelf hardware and existing infrastructure as much as possible Educate businesses and homeowners on their resource usage patterns Provide the utility companies with more detailed usage data in order to better prepare for the periods of peak demands Methods for the collection, handling, and storage of electrical usage data: Electrical data is already available to power companies in real time through digital meters, and wireless technologies. Study and research methods to transport electrical data from the Power Company database to RMS. Analyzing the most efficient make the real time data available to public. Storing the data in a way that it would be protected against natural disasters Initial system setup that should be able to handle the heavy traffic, and must be able to process the efficiently. Methods would be studied way to implement the system to reduce the latency, and ways to reduce too much overhead in bandwidth Making the data as secure as possible so it can only be accessed by the actual user. User end configuration for displaying data User graphical interface development Critical Path analysis (customer decides the critical path) Inform the consumer of peak demand times and government imposed limits Provide Customers with tips to reduce their electrical usage, based on the data Centralizing the resources, tips and methods available leading to waste reduction Predictions for users and Power Companies Researching in development of methods to evaluate the over usage in a specific area Identifications of patterns in electrical usage 50 Availability of the future usage , based on the evaluations of patterns, being available to power companies and public to take actions in reduction 13.7 RISK MANAGEMENT PLAN 1. Marketing Risk: Insufficient Market Probability: Moderate Consequence: Severe Solution: To offer a wide variety of monitoring systems to accommodate the needs and budgets of different clients. The initial version will concentrate on the electrical utilities and be initially offered to areas that already have smart meters installed by the utility company. As the increased population and greater demand on utilities continue to strain the existing resources, it will reach a point where demand will outpace supply and cause a shortage crisis. This will force much stricter control over usage habits and provide an immediate need for resource conservation in which RMS could play a vital role in educating and assisting consumers in make smart energy use choices. Other resources, such as water, gas, and oil face similar shortage situations and will be incorporated with the RMS system. 2. Marketing Risk: Lack of Utility Company Cooperation Probability: Moderate Consequence: Severe Solution: Most utility companies are moving towards AMR systems. The RMS system is a logical extension of current AMR technology. Based on future projections by the DOE, electrical utility companies cannot keep up with the projected future demand and satisfy the needs of its customers. The utility company may be forced to secure power from outside sources at exorbitant prices or may have to resort to “rolling blackouts” to counter an over demand. It is only logical that the power company would want consumers to use the available resources as efficiently as possible in order to keep demand in check. Without the use of some sort of real-time monitoring system to monitor usage, this will be very hard to implement. The RMS system fills this role by informing and educating users of their power usage habits. In the event of total noncooperation from utility companies, RMS will develop systems that can function independent from the utilities meters. The main draw is the cost of the system will go up as the client will have to pay for the equipment and installation of the monitoring devices. 3. Legal Risk: Lack of Government Cooperation Probability: Low Consequence: Moderate Solution: RMS will employ lobbyist to gain government support with local, state governments and federal agencies such as the DOE to mandate energy conservation measures to avert a future national crisis when electrical demand exceeds the supply. The RMS system can provide a vital role in energy conservation by supplying users with real time information and data needed to keep their energy budgets in check with what the power companies can supply. 51 4. Marketing Risk: Competition Probability: Moderate Consequence: Moderate Solution: RMS will offer a wide variety of systems to encompass a larger customer base, specifically the home market where costs have generally made these types of systems uncommon. Most companies that supply a service similar to RMS only concentrate on a few utilities, or are too expensive for the average homeowner to acquire. By partnering with a utility that has already incorporated AMR technology, RMS will be affordable to homes, business, and institutions. RMS will also have the ability to adapt to monitoring other utilities such as water, gas, and oil. 5. Technical Risk: Non-Approval from Standards Organizations Probability: Moderate Consequence: Low Solution: RMS will use as many existing devices/equipment that are already in compliance with the various standards. 6. Marketing Risk: Inability to Secure Sufficient Funding Probability: Moderate Consequence: Low Solution: Phase II, the design, development, and refinement of the RMS prototype, is relatively inexpensive. The ominous energy crisis in the future should provide sufficient motivation for power utility companies and the DOE to fund projects like RMS in order to avert a potential national crisis. In conjunction with the DOE and a participating power company, Phase III of RMS should be attainable. 7. Marketing Risk: Lack or Loss of User Interest in RMS Probability: Low Risk: Low Solution: If financial penalties are imposed for over usage of electricity during periods of extreme over demand, this should provide sufficient motivation for consumers to user RMS regularly. 8. Technical Risk: Information overload – Customers may be overwhelmed with the myriad of data provided Probability: Fair Consequence: Moderate Solution: RMS will format the data in a way that isn’t overwhelming and easy to understand and apply for users that do not have a technical background. 9. Production Risk: Loss of a Vendor or Equipment Supplier Probability: Low Consequence: Low 52 Solution: AMR devices are manufactured by numerous companies. The other components for the RMS are mainly off-the-shelf computer and network devices that are readily available from many manufacturers. 10. Technical Risk: Information overload – Current AMR network may not be able to handle the volume of data from large number of customers: Probability: Moderate Consequence: Moderate Solutions: Use technologies such as spread spectrum modulation where the transmitted bandwidth greater than minimum bandwidth the signal requires. Use meters with ERT’s (Encoder Receiver Transmitter) in “bubble” mode, where it continuously transmits data. Use more frequencies to transmit data (AMR’s currently use 952-956MHz, but the FCC recently approved the 1.4GHz band). Work with a manufacturer of ERT’s to modify them to store a day’s worth of data, and then transmit once a day instead of every hour. 11. Marketing Risk: Customer must be pro-active in use of RMS Probability: Moderate Consequence: Moderate Solution: RMS will work with power companies and government to use rewards and penalties to encourage more responsible usage of electricity during peak demand times. Through the use of lobbyist, RMS will support legislation that assesses over-usage penalties for customers during times of a critical emergency caused by extreme peak demand. With the support of the electrical utilities, an energy rebate could be offered to customers that responsibly use electricity during times of peak demand. 53 13.8 REFERENCES • http://www-hoover.stanford.edu/research/conferences/calelectricity/ • http://www.saudiembassy.net/profile/energy/energy_elec.html • http://www.eia.doe.gov/ • http://www.hd.org/Damon/photos/natural-science/ • http://www.itron.com/products/product.asp?id=1 • http://www.cs.odu.edu/~cpi/cpi-s2002/flow • http://www.energy.gov • http://www.smithmarketing.net • http://www.dcb.du.edu • http://www.experian.de • http://www.dom.com/customer/efficiency/res/index.jsp • http://www.dom.com/about/environment/envir_rpt/energy_efficiency.jsp • http://www.nua.ie/surveys/analysis/graphs_charts/1999graphs/us_ad_spend.html • http://www.amstat.org/sections/srms/brochures/survwhat.html • About REBA • AMR Cost • Analyze Your Home or Business ENERGYguide.com - Lower Your Energy Bills • Annual Energy Outlook with Projections to 2025 Fig 3 • Annual Energy Outlook with Projections to 2025 Fig 4 • Annual Energy Outlook with Projections to 2025 Fig 5. • Annual Energy Outlook with Projections to 2025 figures • Annual Energy Outlook with Projections to 2025 • Automatic Meter Reading by Tom Tamarkin • Automatic Meter Reading for water, gas and electricity utilities - AT RAMAR • Badger Meter, Inc. Utility Case Studies-Ad Slicks • Current Affairs - AMR pilot for water and gas meters [issue 3 2002] • Data Unplugged Opportunity Knocking, Copyright ) 2001 PUR Inc. • DOE Building Energy Codes - Home • dti Energy - Environment - Energy efficiency - Smart metering • Energy Flow Charts for the United States -- Main • Energy Information Administration Annual Energy Review 2001 • Foote Parnters Sample Salary Data Tables • Google Groups View Thread Water meter • http--www.carilec.com-Assets-Presentations 2001-eng_2001_cuc_hosein.pdf • http--www.energystar.gov-ia-partners-manuf_res-lowessurvey.pdf • http--www.medicalogic.com • http--www.smartsynch.com-pdf-Frost-Sullivan Profile.pdf • March 4, 2003 - US Drought Monitor • Network Computing -Reliability Reporting at Florida Power and Light • New Page 1 • News story Benefits of smart metering in homes recognised • Open Directory - Business Energy and Environment Utilities Software • Pepco News Releases • Resource Monitoring System • RMS Survey Statistics • Smart Meters Reporting What, When, and How Much • SMUD Energy efficient home products • Status of State Electric Industry Restructuring Activity • The Business Case for Smart Metering • The EMS system can also be integrated into Automatic Meter Reading • TheMeterGuy.Com • Welcome to SpeedRead • Welcome to the Edge 54 • WHAT IS AMR • ZDNet Networking and Wireless Solution Competitors • http://www.cannontech.com • http://www.niagramohawk.com • http://www.atr-group.com/index2.html • http://www.sotaew.co.uk • http://www.smartsynch.com/index.asp • http://www.systems-ecm.com/index.html • http://www.energycite.com • http://www.webgensystems.com/mktportal/index.htm 13.9 COMPONENT DIAGRAM Above is the major functional component diagram of Resource Monitoring System. The illustrated diagram shows how the actual real time data is currently being transferred from the commercial and noncommercial sector to the electrical companies. The data is being transferred over a wireless network using automated meters. Electric companies will then transfer the data to the RMS database servers. From here the public would be able to access the information about their electricity using a web based application. A user then would be able to make appropriate decisions on their use and steps they can take to reduce their waste. 55 14.0 SURVEY RESULTS AND ANALYSIS RMS presented a survey in order to determine the not only the initial market, but also to know the expectations of customers from the electric company. Survey was unscientific, question upon which our project really depends. Beneath given are significant questions found in survey, results, and conclusion formed by RMS based on responses. Question #1: It was nearly and even split between home owners and renters. Question #2: Due to the fact that RMS would work closely with homes and businesses, this question is significant due to our initial market. RMS would include both businesses and homeowners as an initial market. Question #3: Close to 90 percent of the people accepted that cost of utilities was an important issue or somewhat important issue. Utility expenses are important to people, but there is nothing to help them understand what is the actual resource usage, and how to eliminate waste. Knowing the actual problem is the key to saving energy. Question #4: The public wants to know what resources they are using - what they are paying for, and how can they reduce their expenses based on their use. Currently most believe the power company about their usage. Usage data is not updated till maybe couple of months later, and it is obsolete due to the changing 56 weather conditions. RMS will provide customers with their account information and usage on the account. Users will be able to set their own standards and monitor their usage in real time. Question #5: More than 82 percent users are willing to pick Power Company “A” over Power Company “B” due to availability of real time data. If there is competition, in a given area, power companies will do anything to attract more customers. It would not only save customers a lot of money, it would be really beneficial for power company itself. Question #6: Over 90 percent of the people would like to monitor their electricity usage, and more than 76 percent would like to monitor their water bill. Current increase in electric bill, and water bill , due to drought, might be the biggest reasons for these results. RMS initial target is electricity, and then other resources would be implemented later into the system to form a complete customer package. 57 Question #7: RMS will offer the complete list of services, listed above. RMS is a way to organize all of your utility expenses in order to analyze usage data, for future references. Question #8: Interest in RMS dropped if a significant charge was applied for this service. Clearly, this service must be done as inexpensively as possible to gain support from the general public. 58 Question #9: The RMS contract will be direct with the power companies. An estimated prediction cost of the system is less than a dollar, which eventually ends up being free. Mailing expense would be eliminated, equalizing the cost to almost nothing at the user end. Power companies would reduce a lot of the monitoring, billing and processing expenses, and may end up giving incentives to customers proactive in RMS. Question #10: The majority of our RMS survey responses were in the age range of 18-45. Question #11: The survey respondents were spread out from a wide salary range. Question #12: Users know they are wasting resources, but they are unable to find where it is being wasted 59 and what they can do about it. Information on saving tips is available, but it is not conveniently located all in one place. Awareness of the problem would help us a lot in solving the problem. 60