Financial Plan During the first week of each phase the project manager will assemble the remaining required members for the project. The team members required are listed in the staffing requirements section of this proposal. The salary for each respective team member has been calculated based on a range obtained from www.sarlary.com. The budget for each phase will be divided into three sections: Staffing Requirements, Hard Resources and Total Budget. Phase 1 The months that each employs works are broken down by phases and are determined from the Ghantt chart of the WBS. The months worked for each employee have been determined based on the Work Breakdown Structure (Appendix P). The employee cost has been determined based on the annual salary given for each employee and the months each employee will be needed. The employee overhead is forty percent of the total employee salary. This figure is based on Old Dominion’s employee overhead. Personal: Phase 1 Personnel Employee Project Manager Task/Doc Specialist Financial Specialist Technical Specialist Database Specialist Marketing Specialist Electrical Engineer Webmaster Total Salary Employee Overhead (40%) Total Employee Cost Communications Consultant Hardware Consultant Network Consultant Injection Molding Consultant Total Consultant Cost Total Months Pay Rate Cost 2.84 2.70 2.70 2.70 2.60 2.60 2.70 2.60 $30,000.00 $22,000.00 $24,000.00 $22,000.00 $24,000.00 $22,000.00 $60,000.00 $22,000.00 $7,100.00 $4,950.00 $5,400.00 $4,950.00 $5,200.00 $4,766.67 $13,500.00 $4,766.67 $50,633.33 $20,253.33 $70,886.67 Consultants 0.80 0.80 0.30 0.70 $50,000.00 $55,000.00 $60,000.00 $35,000.00 $3,333.33 $3,666.67 $1,500.00 $2,041.67 $10,541.67 $81,428.33 Hard Resources: The number of workstations, software, and network cables are based on the number of employees that will be working at the same time. While the consultants are assisting the team members, they will share workstations with the team members if needed. Qualified personnel will assemble an iRespond prototype unit with the resources listed below to felicitate future testing of the unit. Phase 1 Hard Resources Resource FOB Case Prototype GPS Receiver GPS Antenna CDMA Radio Chip Mobile Phone Antenna Rechargeable Battery Recharging Station Flash Memory Internal Circuits and Board Solder Soldering Iron Database Server Red hat Linux Ethernet Cables CAT 6 Number of Units 1 2 2 2 2 2 2 2 2 4 4 2 2 4 Cost Per Unit Total Cost $10,000.00 $10,000.00 $59.95 $119.90 $17.95 $35.90 $20.00 $40.00 $3.00 $6.00 $19.98 $39.96 $38.94 $77.88 $11.95 $23.90 $1.47 $2.94 $2.00 $8.00 $10.00 $40.00 $2,500.00 $5,000.00 $0.00 $0.00 $35.00 $140.00 Total Hard Resources Cost $15,534.48 Travel: The iRespond team is all located in the same geographic location. This location is also the site of our proposed office space. For these reasons, the only budget item for travel is the trip to Project Manager will make to the agency granting funding to our project. The funding for this trip is based on information received from expedia.com. Description Rental Car Hotel Meals Total Travel Cost Travel Days Cost Per Day 4.00 3.00 4.00 Total Cost $35.00 $100.00 $60.00 $140.00 $300.00 $240.00 $680.00 Total Budget: The total budget is determined based on the hard resource cost and personnel cost shown before. Total iRespond Phase 1 Budget Description Personnel Cost Hard Resource Cost Travel Cost Total iRespond Phase 1 Cost Cost $81,428.33 $15,534.48 $680.00 $97,642.81 Phase 2 All personnel required for Phase II are shown below along with their respective salaries and duration of contract. During this phase, all employees will hold at a minimum, a bachelor’s degree in their perspective field. The iRespond team has allocated funds for legal counsel if needed. Personnel: Phase 2 Personnel Employee Project Manager Task/Document Specialist Financial/Accounting Director Technical Specialist Marketing Director Networking Engineer Electrical Engineer Webmaster Call Center Supervisor Customer Service Manager HR Manager Traffic/Scheduling Analyst Sales Director Tester Design Engineer 1 Database Admin/Designer Database Engineer Total Personnel Cost Employee Overhead (40%) Total Phase 2 Personnel Cost Legal Consultant Total Months 8.25 4.00 4.00 4.00 4.00 3.00 8.00 2.00 3.00 3.00 3.00 4.00 5.00 3.00 8.00 6.00 6.00 Consultants 1.00 Pay Rate Cost $80,000.00 $55,000.00 $22,000.00 $7,333.33 $65,000.00 $21,666.67 $45,000.00 $15,000.00 $60,000.00 $20,000.00 $62,000.00 $15,500.00 $60,000.00 $40,000.00 $28,000.00 $4,666.67 $33,000.00 $8,250.00 $55,000.00 $13,750.00 $70,000.00 $17,500.00 $35,000.00 $11,666.67 $60,000.00 $25,000.00 $32,404.00 $8,101.00 $59,478.00 $39,652.00 $60,000.00 $30,000.00 $80,000.00 $40,000.00 $373,086.33 $149,234.53 $522,320.87 $80,000.00 $6,666.67 $528,987.53 Hard Resources: During the first year of the Phase II, there will be nine additional employees than in Phase I. For this reason, additionally workstations, office equipment, office space, software, and network cables will be needed. Additionally testing equipment will be required for this phase as well. FOB Case production will also occur at this time. Phase 2 Hard Resources Resource Call Center Work Stations Office Equipment Phones Network Equipment Testing Equipment Molds + Case Production + Assembly Call Center Phone Number Total Phase 2 HD Cost Number of Units 1 20 20 20 1 1 100,000 2 Cost Per Unit Total Cost $42,000.00 $28,875.00 $1,800.00 $36,000.00 $230.00 $4,600.00 $140.00 $2,800.00 $80,000.00 $80,000.00 $40,000.00 $40,000.00 $0.17 $16,500.00 $24.95 $49.90 $208,824.90 Total Budget: Total iRespond Phase 2 Budget Description Personnel Cost Hard Resource Cost Total iRespond Phase 2 Cost Cost $528,987.53 $208,824.90 $737,812.43 Phase 3, Budget Projection The budget for Phase III is based on 1 year of production. The status of the production will be reevaluated at this time and the budget adjusted accordingly for the remaining years. Personnel: Phase 3 Personnel Employee Project Manager Task/Document Specialist Financial/Accounting Director Technical Specialist Marketing Director Webmaster Call Center Supervisor Customer Service Manager Training Specialist 1 Database Maintenance Staff Customer Service Rep 1 Technical Support Rep Help Desk Support Network Systems Admin HR Manager HR Staff Traffic/Scheduling Analyst Sales Director Tester Database Admin Total Personnel Cost Employee Overhead (40%) # Employees 1 1 1 1 1 1 3 1 2 1 20 10 1 1 1 2 2 1 2 1 Months Pay Rate Cost 12.00 $95,000.00 $95,000.00 12.00 $30,000.00 $30,000.00 12.00 $65,000.00 $65,000.00 12.00 $45,000.00 $45,000.00 12.00 $60,000.00 $60,000.00 6.00 $28,000.00 $14,000.00 12.00 $33,000.00 $99,000.00 12.00 $55,000.00 $55,000.00 6.00 $38,000.00 $38,000.00 12.00 $81,791.00 $81,791.00 12.00 $18,720.00 $374,400.00 12.00 $24,960.00 $249,600.00 12.00 $37,662.00 $37,662.00 12.00 $50,000.00 $50,000.00 12.00 $70,000.00 $70,000.00 12.00 $45,000.00 $90,000.00 12.00 $35,000.00 $70,000.00 12.00 $60,000.00 $60,000.00 12.00 $32,404.00 $64,808.00 12.00 $60,000.00 $60,000.00 $1,709,261.00 $683,704.40 Total Phase 2 Personnel Cost Legal Consultant Total $2,392,965.40 Consultants 1 6.00 $80,000.00 $40,000.00 $2,432,965.40 Hard Resources: Phase 3 Hard Resources Resource Call Center Work Stations Office Equipment Phones Testing Equipment Shipping 10000 units Shipping Call Center Phone Number Server UPC Call Center Phone Number Bulk Component Cost Bulk Component Cost Marketing Costs Total Phase 3 HD Cost Number of Units 1 10 10 10 1 100,000 500,000 2 2 2 100,000 500,000 1 Cost Per Unit $42,000.00 $1,800.00 $230.00 $140.00 $40,000.00 $0.19 $0.13 $24.95 $1,000.00 $24.95 $22.66 34.65 $800,000.00 Total Cost $42,000.00 $18,000.00 $2,300.00 $1,400.00 $40,000.00 $19,305.00 $65,000.00 $49.90 $2,000.00 $49.90 $2,266,000.00 $17,325,000.00 $800,000.00 $19,781,104.80 Total Budget: Total iRespond Phase 3 Budget Description Personnel Cost Hard Resource Cost Total iRespond Phase 3 Cost Cost $2,432,965.40 $19,781,104.80 $22,214,070.20 Total Budget (Phase I through III): The total budget for Phase I through Phase III is based on the total budget for the Phase I, Phase 2 and the initial yearly budget for Phase III. Personnel Cost Description Phase 1 Phase 2 Phase 3 Cost $81,428.33 $528,987.53 $2,432,965.40 Total $3,043,381.27 Resource Cost Description Phase 1 Phase 2 Phase 3 Cost $15,534.48 $208,824.90 $19,781,104.80 Total $20,005,464.18 Travel Cost Description Phase 1 Phase 2 Phase 3 Total Cost $680.00 $0.00 $0.00 $680.00 Total iRespond Budget Description Cost Personnel Cost $3,043,381.27 Resource Cost $20,005,464.18 Travel Cost $680.00 Total $23,049,525.45 Product Cost: The iRespond product will come packaged with instructions, user manual, telephone cord, AC Adaptor and update/recharging unit. The total cost for this package, including packaging and shipping fees is $34.80. Retail costs will vary. Unit Cost Per Bulk Unit Description Cost Cost Per Bulk Unit $34.65 Shipping Per Unit $0.15 Total $34.80 Profit: Yearly Profit Description Unit Profit @ $40.00 Each Subscription Profit Less Overhead Cost Cost $24,000,000.00 $55,308,015.00 $22,214,070.20 Total Profit $57,093,944.80 Yearly Subscription Profit 600,000 Units Description Income Yearly Fee @ 25% of Subscriptions $14,998,500.00 Less 1% Inactive Units $14,848,515.00 Monthly Fee @ 75% of Subscriptions $53,946,000.00 Less 25% Inactive Units $40,459,500.00 Total Without Inactive Units Total $68,944,500.00 $55,308,015.00 Unrealized Profit $13,636,485.00 Initial Expected Profit Profit Per Unit Production Cost Break Even Point Units Sold Per Day Percentage of the Market $5.20 $22,214,070.20 555352 units 1543 0.26% Out years Expected Profit Profit Per Unit $5.20 Subscription Profit Per Year $55,308,015.00 Production Cost $22,214,070.20 Units Sold Per Day 500 Profit Per Year From Units $949,000.00 Profit Per Year from Subscription $55,308,015.00 The iRespond team will profit from sales of the actual iRespond unit. The largest profits will be generated from the subscription fees. The revenue generated from the units alone is estimated at: twenty-four-million dollars. The subscription fees will yield an annual profit in excess of fifty-five-million dollars with unrealized profit included. Total development cost from phase I, phase II and the initial production of Phase III is $23,049,525.45. This includes all aspects of the project. The team would like to turn a profit within the first year of production. The iRespond will break if 55,5352 iRespond units were sold within the first year. These figures do not include the subscription fee for each respective unit. If 600,000.00 units were sold the iRespond project would generate revenue in excess of $24,000,000.00. In terms of units alone, on average 1543 units will have to be sold each day for a year, (based on a 7 day work week). This figure would drop dramatically if subscription fees are included. Additionally this figure only accounts for .26% of our market. After the development costs have been returned, the production cost per year is estimated to be $3,495,000.00 per 100,000 units produced. The call center will incur estimated costs of $20,000,000.00. This amount will need to be made up each year in order for the team to realize a profit each year. Further estimation of profit and cost beyond the first year cannot be determined without actual sales data.