Relay DG Report (for TGm Closing Report)

advertisement
Relay DG Report (for TGm Closing Report)
IEEE 802.16 Presentation Submission Template (Rev. 9)
Document Number:
C80216m-09_2134
Date Submitted:
2009-09-01
Source:
Rakesh Taori
Samsung Electronics
*http://standards.ieee.org/faqs/affiliationFAQ.html
Voice:
E-mail:
[Telephone Number (optional)]
rakesh.taori@samsung.com
Venue:
Re: Session #63 Jeju Meeting
Base Contribution:
C80216m-09_2134
Purpose:
To report the Relay DG activities in Session #63 to TGm.
Notice:
This document does not represent the agreed views of the IEEE 802.16 Working Group or any of its subgroups. It represents only the views of the participants listed in
the “Source(s)” field above. It is offered as a basis for discussion. It is not binding on the contributor(s), who reserve(s) the right to add, amend or withdraw material
contained herein.
Release:
The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an
IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s
sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this
contribution may be made public by IEEE 802.16.
Patent Policy:
The contributor is familiar with the IEEE-SA Patent Policy and Procedures:
<http://standards.ieee.org/guides/bylaws/sect6-7.html#6> and <http://standards.ieee.org/guides/opman/sect6.html#6.3>.
Further information is located at <http://standards.ieee.org/board/pat/pat-material.html> and <http://standards.ieee.org/board/pat >.
Agenda
• Establish DG goals, strategy, and process
• Review classification of contributions
– Do we want to consider all given our goals and our
strategy?
• Develop ToC
• Time for contribution presentation (voluntary
basis)
• Establish timeline for work between meetings
Relay DG Goal
• To draft relay text that can be adopted in D2
during Session #63.5 (Hawaii)
– Must have very high level of support (75% required
for adoption)
– Must be fully specified and self-consistent; cannot
contain major placeholders or vague text for which
protocols/procedures will need to be specified later.
Relay DG Strategy
• Use the DG to specify a simple baseline relay system
– Stick to a modest scope and to basic, non-controversial
relay concepts
– Generate DG document which can meet the 75%
acceptance requirement
– Provide a baseline for additional relay proposals/concepts.
• Extensions and more advanced relay concepts can be
considered as LB comments against the D2 or later
drafts.
Relay DG Process
• Classify Contributions into categories - done
• Prioritization (Scope Reduction) - done
– See the slide titled “Scope reduction”
• Adopt a ToC (For DG text development) - done
• Publish initial draft (DG chairs put together a draft)
• Review the draft using email and 4 conference calls.
• Finalize the draft during Session #63.5 (Hawaii) and
propose to the WG for adoption.
Scope reduction: Topics that we agreed not to focus on
in this DG
(during the development of the draft for Session #63.5 (Hawaii))
•
•
•
•
•
•
•
Mobile RS
Centralized scheduling
Interference mitigation
Multi-hop
Transparent RS
Cooperative Relay
RS groups
Table of Contents
(for the development of the DG draft)
•
15.5 Support for Relay
–
–
–
15.5.1 Relay Modes and General
Description
15.5.2 Support for 802.16e (official term)
MS
15.5.3 MAC
•
•
•
•
•
•
•
•
•
•
•
•
15.5.3.1 Addressing
15.5.3.2 MPDU Formats
15.5.3.3 Construction and Transmission of
MPDUs
15.5.3.4 MAC Control Messages
15.5.3.5 Security
15.5.3.6 Handover
15.5.3.7 Connection Management
15.5.3.8 Scheduling and QoS
15.5.3.9 Bandwidth Request
15.5.3.10 ARQ
15.5.3.11 HARQ
15.5.3.12 Network Entry
–
–
•
•
•
15.5.3.12.1 AMS Network Entry
15.5.3.12.2 ARS Network Entry
15.5.3.13 Ranging
15.5.3.14 Sleep Mode
15.5.3.15 Idle Mode
–
15.5.4 Physical Layer
•
•
•
15.5.3.1 Frame Structure
15.5.3.2.DL Physical structure
15.5.3.3 Downlink Control Channels
–
–
–
•
15.5.3.3.1 Relay amble
15.5.3.3.2 Superframe Header
15.5.3.3.3 Advanced Map
15.5.3.4 Uplink Control Channels
Until Session #63.5
• Work will be carried out in the DG on the basis
of the comments and contributions that were
by the CfC deadline for features (30th Aug
AOE).
• DG chairs to prepare the initial draft and
circulate it for discussion (by the 4th Sept)
• Comments and discussions based on the draft
in accordance with the plan proposed in the
slide titled “DG activities between meetings”
DG Activities Between Session #63 and #63.5
• Initial draft – To be sent by the chairs by September 4, 2009
– Chairs will prepare the draft on the basis of the
• received contributions
• agreed reduced scope.
• agreed ToC (See Doc “”)
• Conference calls:
–
–
–
–
–
–
All calls at 7 pm PST (= 10 PM EST, 11 AM KST/JST (+1), 10 AM China(+1), 6 AM Russia, 7:30 AM India(+1))
First conference call – September 8, 2009
Second CC – September 10, 2009
Third CC – September 15, 2009
Fourth CC – September 17, 2009
Try to limit the call to two hours (no longer than 3 hours).
• Revised drafts and requests for comments/inputs to be issued in
between calls.
What you need to do to join the DG activity
• Send your e-mail address to the DG chairs:
–
–
Jerry.Sydir@intel.com
Rakesh.Taori@samsung.com
Download