IEEE C80216m-10_0 Project Title

advertisement

IEEE C80216m-10_0

Project

Title

IEEE 802.16 Broadband Wireless Access Working Group < http://ieee802.org/16 >

Correction of E-MBS resource allocation equation

Date

Submitted

2010-07-09

Source(s) Kaiying Lv

Re:

Yuqin Chen

E-mail: lv.kaiying@zte.com.cn

ZTE Corporation

Comments on Chapter 16.3.6.5.(

Downlink physical structure for E-MBS support

)

Abstract

This contribution proposes modification to equation for calculating the number of PRUs for E-

MBS in each frequency partition.

Purpose

Notice

Release

Patent

Policy

To be discussed and adopted.

This document does not represent the agreed views of the IEEE 802.16 Working Group or any of its subgroups . It represents only the views of the participants listed in the “Source(s)” field above. It is offered as a basis for discussion. It is not binding on the contributor(s), who reserve(s) the right to add, amend or withdraw material contained herein.

The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.16.

The contributor is familiar with the IEEE-SA Patent Policy and Procedures:

< http://standards.ieee.org/guides/bylaws/sect6-7.html#6 > and

< http://standards.ieee.org/guides/opman/sect6.html#6.3

>.

Further information is located at < http://standards.ieee.org/board/pat/pat-material.html

> and

< http://standards.ieee.org/board/pat >.

IEEE C80216m-10_0

Correction of E-MBS resource allocation equation

Kaiying Lv, Yunqin Chen

ZTE Corporation

1. Problem Statement

It has been accepted during #66 meeting the equation for calculating the number of PRUs for E-MBS in each frequency partition. However the second part of equation is not correctly copied from the accepted contribution into the Draft.

L

EMBS , FPm

N

1

N

1

K

SB , E

MBS

FPCT

K

SB , E

MBS

FPCT

 m

 q

1 otherwise

2. Proposed Schemes

Correct the equation.

3. Text Proposal

======================== Start of Proposed Text =====================

[Correction of equation in P497,Line 5, 16.3.6.5 Downlink physical structure for E-MBS support as follows:]

16.3.6.5 Downlink physical structure for E-MBS support

…..

In case that FP

0

is not available (e.g., reuse-3 only), the number of PRUs for E-MBS in each frequency partition, FP i

( i >0) is derived as

L

EMBS , FPm

N

1

N

1

K

SB , E

MBS

FPCT

K

SB , E

MBS

FPCT

 m

 q

1 otherwise

============================== End of Proposed Text ============================

Download