2009-05-19 IEEE 802.16m-09/0019 Work Plan for IEEE 802.16m Standard & IMT-Advanced Submission 1 Documents to be Developed in TGm • TGm will develop the following documents as part of 802.16m standardization process: – System Requirements Document (SRD) • A set of possible deployment scenarios and applications of the 802.16m standard. • A set of performance targets and features that 802.16m compliantsystems shall meet or exceed. – Evaluation Methodology Document (EMD) • A complete set of parameters, models, and methodologies for the link-level and system-level simulations that allow fair evaluation/comparison of various technical proposals. • Channels Models: A set of spatial channel model parameters are specified to characterize particular features of MIMO radio channels to be used for simulating technical proposals for the future 802.16m standard. – System Description Document (SDD) • Architecture and design of the 802.16m air interface amendment • Captures the core technical concepts behind the features included in the amendment • Will enable analysis and/or simulations for characterizing the coarse level performance benefits of the air interface in association with the Evaluation Methodology Document – 802.16m amendment – 802.16 IMT-Advanced Proposal 2 TGm Timelines Q2 IEEE 802.16 System Requirements IEEE 802.16m Evaluation Methodology System Description IMT Advanced Proposal 2007 Q3 Q4 Q1 2008 Q2 Q3 ITU-R IMT Advanced Circular Letter IMT.EVAL Q1 Q2 2009 Q3 Q4 2010 Q2 Q3 Q1 Sep ’07* Amendment Ready for IMTAdv evaluation Jan’08* Amendment Feature Complete. EC Conditional Approval for SB. Nov ’07 EC Conditional Approval for RevCom submission Jan 09* Amendment Ready for Industry Release. RevCom submission ITU based Updates Jan ’09 Sept ’09* Final Proposal Nov ’08 Refinements July ’09 Working Doc Jan’10 Letter Ballot May ’10 Sponsor Ballot Jun ’08 Jun ’08 ITU based potential updates Oct ’08 Jan’09 Oct ’09 Proposal Submission IMT.RSPEC Q4 Apr MayJun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr MayJun Jul Aug Sep Oct NovDec Jan Feb Mar Apr MayJun Jul AugSep Oct Nov Dec Jan Feb Mar Apr MayJun Jul AugSep Oct Nov Dec 802.16m Amendment IMT.TECH Q4 Jun ’10 Proposal Evaluation & Consensus Building Develop Recommendation ITU-R WP5D Apr MayJun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr MayJun Jul Aug Sep Oct NovDec Jan Feb Mar Apr MayJun Jul AugSep Oct Nov Dec Jan Feb Mar Apr MayJun Jul AugSep Oct Nov Dec *System Requirements and Evaluation Methodology, System Description, IMT-Advanced Proposal Documents may be further updated based on ITU output (shown by dotted lines). 3 3 Process for staging 802.16m Amendment feature development PHY/MAC features required for IMTAdvanced for a working system P802.16m draft AWD Feature inclusion vote 50% SB WG LB 75% Final feature addition meeting 50% Feature 1 RG Feature 2 RG Feature N RG Feature N+1 Amendment Feature development: -Feature developed as a RG contribution to TGm -Finally included only as a complete proposal, not a partial one -Develop as a self contained clause/subclause unless it is essential -Do not put place holders in Amendment till the feature is ready. (SDD will still have all features) -RGs should track Amendment development for consistency -WG LB recirculation scope should allow feature addition -All features have to go thru at least one WG LB recirculation Next Project (New PAR) RG AWD = Amendment Working Doc RG = Rapporteur Group LB = Letter Ballot 4 SB= Sponsor Ballot Feature RG process for the Amendment • Feature Rapporteur Groups (RG) will develop contributions for adoption by TGm as per Process (in previous slide) • RGs will be authorized/re-authorized at each TGm session • TGm will provide final deadlines for completion of RG work. • RG must start with a work plan based on TGm final deadlines. • RGs must report progress at every TGm session • RG final output contribution must be complete by TGm deadlines for adoption into the AWD/Draft • RGs may meet during TGm sessions • RGs can arrange teleconferences with 7 day advance notice • RGs conduct straw polls for decision making • RGs are open to all participants 5 Amendment Feature RG timelines SDD Cha pter Features to be discussed in RGs Essential for IMT-Adv. at Amendment level detail CFC Issued for Feature RG Target for completion 12 Inter-Radio Access Technology Functions (No SDD text) No NA ---- 13 LBS No To be decided in July’09 Nov’09 14 E-MBS No To be decided in July’09 Nov’09 15 Relay No To be decided in July’09 Nov’09 16 Co-deployment and Coexistence (No SDD text. Section deleted this session) No NA ---- 17 Femtocell No May’09 Sept’09 18 Self organizing networks No To be decided in July’09 Nov’09 20 Interference Mitigation No Mar’09 Sept’09 22 Inter-ABS Synchronization No To be decided in July’09 Nov’09 6