Broadband over power-line Project • The standards board recently approved a project for broadband over power-line • At the March plenary meeting there were several concerns regarding the BPL PAR – The architecture committee had some architecture concerns – The 802.19 coexistence TAG had some concern regarding potential interference to wireless systems 1 Broadband over power-line Project • The BPL PAR states that voting will be by entity and not individual • It was suggested that 802 join the BPL sponsor ballot as an entity • In checking with Steve Mills 802 cannot become an entity since it does not have an independent board of directors • Hence 802 cannot join the BPL sponsor ballot 2 Comment from Geoff Thompson • Geoff Thompson requested that his following comment be on record in the EC meeting minutes, – Geoff considers the denial of access to 802 to voting is denial of participation to a "materially interested party" and thus potentially grounds for an appeal of the IEEE process to ANSI. – The IEEE needs to get this fixed. We have a legitimate interest in this project. 3