Proposal for IMT-Advanced Development Work Plan for 802.16m Document Number: IEEE C802.16-08/030 Date Submitted: 2008-11-10 Source: Jose Puthenkulam jose.p.puthenkulam@intel.com Sassan Ahmadi Reza Arefi Apostolos Papathanassiou Intel Corporation Venue: IEEE Session #58 Dallas, TX, USA Base Contribution: None Purpose: To provide guidance on the work plan 802.16m deliverables required for ITU-R IMT-Advanced Proposal Submission Notice: This document does not represent the agreed views of the IEEE 802.16 Working Group or any of its subgroups. It represents only the views of the participants listed in the “Source(s)” field above. It is offered as a basis for discussion. It is not binding on the contributor(s), who reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.16. Patent Policy: The contributor is familiar with the IEEE-SA Patent Policy and Procedures: <http://standards.ieee.org/guides/bylaws/sect6-7.html#6> and <http://standards.ieee.org/guides/opman/sect6.html#6.3>. Further information is located at <http://standards.ieee.org/board/pat/pat-material.html> and <http://standards.ieee.org/board/pat >. Outline • • • • • • ITU-R IMT-Advanced Status ITU-R IMT-Advanced Schedule 802.16m IMT-Advanced Proposal Intent 802.16m ITU-R Submission Package Required Proposed Development Timeline Proposed CFC Schedule ITU-R IMT-Advanced Status • IMT.REST, IMT.EVAL and CL Addendum have been finalized in Seoul Meeting in Oct.’08 • IMT.TECH and CL was initially finalized in Jun’08 • So all templates and materials for proposal submissions are available on the ITU-R website. http://www.itu.int/ITU-R/go/rsg5-imt-advanced/ • Proposals can be submitted starting Feb’09 • Proposal submission deadline is Oct’09 ITU-R IMT-Advanced Schedule WP 5D meetings 2008 2009 radio interface Recommendations 2010 Schedule for the development of IMT-Advanced No.1 No.2 No.3 No.4 No.5 No.6 No.7 No.8 No.9 (0) 2011 No.10 Step1 and 2 (20 months) Step 3 (8 months) (1) Step 4 (16 months) Steps 5,6 and 7 (20 months) (2) (3) Steps 8 (12 months) (4) Steps in radio interface development process: Step 1: Issuance of the circular letter Step 2: Development of candidate RITs and SRITs Step 3: Submission/Reception of the RIT and SRIT proposals and acknowledgement of receipt Step 4: Evaluation of candidate RITs and SRITs by evaluation groups Step 5: Review and coordination of outside evaluation activities Step 6: Review to assess compliance with minimum requirements Step 7: Consideration of evaluation results, consensus building and decision Step 8: Development of radio interface Recommendation(s) Critical milestones in radio interface development process: (0): Issue an invitation to propose RITs (1): ITU proposed cut off for submission of candidate RIT and SRIT proposals March 2008 October 2009 (2): Cut off for evaluation report to ITU June 2010 (3): WP 5D decides framework and key October 2010 characteristics of IMT-Advanced RITs and SRITs (4): WP 5D completes development of radio February 2011 interface specification Recommendations IMT-Advanced A2-01 Source ITU-R WP5D 802.16m IMT-Advanced Proposal • 802.16m is intended as a single RIT to meet or exceed the IMTAdvanced requirements in multiple test environments. Test Environment Intended IMTAdvanced Proposal Indoor Yes Microcellular Yes Base Coverage Urban Yes High Speed Yes 802.16m IMT-Advanced Submission Package Required • • • • • • • Technology Description Template (TDT) Link Budget Template (LBT) Services Compliance Template (SCT) Spectrum Compliance Template (SPECT) Performance Compliance Template (PCT) Self Evaluation Cover Sheets Proposed 802.16m ITU-R IMT-Advanced Contributions Timeline 2008 Q4 IEEE 802.16 802.16m Mar ’09 Working Doc Q2 2010 Q3 Q4 Q1 2011 Q2 Q3 Q4 Mar ’10 Sponsor Ballot 802.16m IMT-Adv Proposal TDT LBT Services Compliance SCT Spectrum Compliance SPECT Performance Compliance PCT Jan ’09 Intro. Material Sept ’09* Final Proposal Jan’09 ITU-R ITU-R WP5D Sep ’09 Letter Ballot Link Budget IMT Advanced Recommendations Q1 Nov 08* Technology Description Submission Package Q4 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec System Description 802.16m AmendmentŦ 2009 Q2 Q3 Q1 Oct ’09 Proposal Submission Proposal Evaluation Jun ’10 Oct ’10 Co-ordination, Assessment, Consensus Building, & Decision Feb ’11 Develop Radio Recommendations Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Documents may be further updated based (shown by dotted lines). Ŧ 802.16m amendment is dependent on the 802.16Rev2 Project completion Proposed Call for contributions Schedule Work item Call for Contributions for IMT-Advanced proposal Issuance Date Notes Technology Description Template Session #58, Nov 2008 SDD already partially addresses this. However some details from Amendment will be required Link Budget template Session #60, Mar 2009 TGm needs to complete features that impact link budget Services Compliance Template Session #58, Nov 2008 SDD already addresses Spectrum Compliance Template Session #58, Nov 2008 SDD already addresses Performance Compliance Template Session #60, Mar 2009 TGm needs to complete features that impact performance