Proposal for IMT-Advanced Development Work Plan for 802.16m Document Number: Date Submitted: Source:

advertisement
Proposal for IMT-Advanced Development Work Plan for 802.16m
Document Number:
IEEE C802.16-08/030
Date Submitted:
2008-11-10
Source:
Jose Puthenkulam
jose.p.puthenkulam@intel.com
Sassan Ahmadi
Reza Arefi
Apostolos Papathanassiou
Intel Corporation
Venue: IEEE Session #58 Dallas, TX, USA
Base Contribution:
None
Purpose: To provide guidance on the work plan 802.16m deliverables required for ITU-R IMT-Advanced Proposal Submission
Notice:
This document does not represent the agreed views of the IEEE 802.16 Working Group or any of its subgroups. It represents only the views of the
participants listed in the “Source(s)” field above. It is offered as a basis for discussion. It is not binding on the contributor(s), who reserve(s) the right to
add, amend or withdraw material contained herein.
Release:
The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the
creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this
contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor
also acknowledges and accepts that this contribution may be made public by IEEE 802.16.
Patent Policy:
The contributor is familiar with the IEEE-SA Patent Policy and Procedures:
<http://standards.ieee.org/guides/bylaws/sect6-7.html#6> and <http://standards.ieee.org/guides/opman/sect6.html#6.3>.
Further information is located at <http://standards.ieee.org/board/pat/pat-material.html> and <http://standards.ieee.org/board/pat >.
Outline
•
•
•
•
•
•
ITU-R IMT-Advanced Status
ITU-R IMT-Advanced Schedule
802.16m IMT-Advanced Proposal Intent
802.16m ITU-R Submission Package Required
Proposed Development Timeline
Proposed CFC Schedule
ITU-R IMT-Advanced Status
• IMT.REST, IMT.EVAL and CL Addendum have
been finalized in Seoul Meeting in Oct.’08
• IMT.TECH and CL was initially finalized in Jun’08
• So all templates and materials for proposal
submissions are available on the ITU-R website.
http://www.itu.int/ITU-R/go/rsg5-imt-advanced/
• Proposals can be submitted starting Feb’09
• Proposal submission deadline is Oct’09
ITU-R IMT-Advanced Schedule
WP 5D
meetings
2008
2009 radio interface Recommendations
2010
Schedule
for the development of IMT-Advanced
No.1
No.2
No.3
No.4
No.5
No.6
No.7
No.8
No.9
(0)
2011
No.10
Step1 and 2
(20 months)
Step 3
(8 months)
(1)
Step 4
(16 months)
Steps 5,6 and 7
(20 months)
(2)
(3)
Steps 8
(12 months)
(4)
Steps in radio interface development process:
Step 1: Issuance of the circular letter
Step 2: Development of candidate RITs and SRITs
Step 3: Submission/Reception of the RIT and SRIT proposals
and acknowledgement of receipt
Step 4: Evaluation of candidate RITs and SRITs
by evaluation groups
Step 5: Review and coordination of outside evaluation activities
Step 6: Review to assess compliance with minimum requirements
Step 7: Consideration of evaluation results, consensus building
and decision
Step 8: Development of radio interface Recommendation(s)
Critical milestones in radio interface development process:
(0): Issue an invitation to propose RITs
(1): ITU proposed cut off for submission
of candidate RIT and SRIT proposals
March 2008
October 2009
(2): Cut off for evaluation report to ITU
June 2010
(3): WP 5D decides framework and key
October 2010
characteristics of IMT-Advanced RITs and SRITs
(4): WP 5D completes development of radio
February 2011
interface specification Recommendations
IMT-Advanced A2-01
Source ITU-R WP5D
802.16m IMT-Advanced Proposal
• 802.16m is intended as
a single RIT to meet or
exceed the IMTAdvanced
requirements in
multiple test
environments.
Test
Environment
Intended IMTAdvanced
Proposal
Indoor
Yes
Microcellular
Yes
Base Coverage
Urban
Yes
High Speed
Yes
802.16m IMT-Advanced Submission Package
Required
•
•
•
•
•
•
•
Technology Description Template (TDT)
Link Budget Template (LBT)
Services Compliance Template (SCT)
Spectrum Compliance Template (SPECT)
Performance Compliance Template (PCT)
Self Evaluation
Cover Sheets
Proposed 802.16m ITU-R IMT-Advanced Contributions Timeline
2008
Q4
IEEE 802.16
802.16m
Mar ’09
Working Doc
Q2
2010
Q3
Q4
Q1
2011
Q2
Q3
Q4
Mar ’10
Sponsor Ballot
802.16m IMT-Adv Proposal
TDT
LBT
Services
Compliance
SCT
Spectrum
Compliance
SPECT
Performance
Compliance
PCT
Jan ’09
Intro.
Material
Sept ’09*
Final Proposal
Jan’09
ITU-R
ITU-R WP5D
Sep ’09
Letter Ballot
Link Budget
IMT
Advanced
Recommendations
Q1
Nov 08*
Technology
Description
Submission
Package
Q4
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
System
Description
802.16m
AmendmentŦ
2009
Q2
Q3
Q1
Oct ’09
Proposal Submission
Proposal Evaluation
Jun ’10
Oct ’10
Co-ordination, Assessment, Consensus Building, & Decision
Feb ’11
Develop Radio Recommendations
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Documents may be further updated based (shown by dotted lines).
Ŧ 802.16m amendment is dependent on the 802.16Rev2 Project completion
Proposed Call for contributions Schedule
Work item
Call for Contributions for
IMT-Advanced proposal
Issuance Date
Notes
Technology Description
Template
Session #58, Nov 2008
SDD already partially
addresses this. However some
details from Amendment will
be required
Link Budget template
Session #60, Mar 2009
TGm needs to complete
features that impact link
budget
Services Compliance
Template
Session #58, Nov 2008
SDD already addresses
Spectrum Compliance
Template
Session #58, Nov 2008
SDD already addresses
Performance
Compliance Template
Session #60, Mar 2009
TGm needs to complete
features that impact
performance
Download