RR-TAG Opening Report
Date: July, 2013
Authors:
Name
Company
Address
Phone
email
Michael
Lynch
MJ Lynch &
Associates
LLC; Silver
Spring
Networks;
Dallas Area
Rapid Transit
108 Brentwood Court
Allen, TX 75013
1.972.814.4901
mjlynch@mjlallc.c
om
Notice: This document has been prepared to assist IEEE 802.18. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in
this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein.
Submission
Slide 1
Michael Lynch, MJ Lynch & Associates LLC
July, 2013
doc.: 18-13/0086
Overview
• This document reports on the regulatory matters considered and
outputs after the end of the March, 2013, both by teleconferences and
during the May, 2013.
• Specific documents/actions were approved by the RR-TAG in
response to new regulatory proceedings and inputs from various WGs.
• The RR-TAG is input driven. The attendance varies depending on the
topics & documents being considered. For example at the most recent
session in Atlanta there were 25 people from different WGs helping
draft an output.
• As was begun at the September, 2012 meeting final approval of
documents is intended to be done on Thursdays during AM1 and AM2.
Submission
Slide 2
Michael Lynch, MJ Lynch & Associates LLC
July, 2013
doc.: 18-13/0086
FCC items considered during this period
• The RR-TAG continued to develop inputs to the FCC:
– 18-13/064r6, Draft 802 Comments to the FCC U-NII band NPRM FCC 13-49. This
filing was completed at the July meeting and filed with the FCC shortly thereafter.
– 18-13/017r1, the RR-TAG reviewed the status of the FCC’s NOTICE OF
PROPOSED RULEMAKING regarding the 5 GHz U-NII frequency band. The goal
is to have IEEE 802 comments completed by the end of the July meeting in
Genève.
• Prior to the start of the July meeting in Genève the RR-TAG became
aware that the FCC had (or would) issue an order permitting Progeny
to operate their M-LMS system in the 902 – 928 MHz frequency band..
– This order removes the regulatory certainty and “safe harbor” that license exempt
systems have had in that frequency band. It is expected that IEEE 802 will develop
a response (along with others) to this during the Genève meeting.
• RR-TAG prepared a response to the European Union’s Radio
Spectrum Policy Group’s draft opinion, “Strategic Challenges facing
Europe in addressing the Growing Spectrum Demand for Wireless
Broadband.” 18-13/047r4. The RR-TAG’s remit includes this action.
Submission
Slide 3
Michael Lynch, MJ Lynch & Associates LLC
July, 2013
doc.: 18-13/0086
ITU-R items considered in this period
• The RR-TAG approved and submitted for EC approval the latest
contribution to ITU-R WP1A, Question ITU-R 236/1, “Smart grid
power management systems”, 18-13/067r3.
– This contribution provided the requested technical data on IEEE 802 wireless
systems for inclusion in the Preliminary Draft New Report.
– It is expected that IEEE 802 will make a further contribution to the 2014 meeting of
WP1A and that IEEE 802.3 will be included.
– It seems possible that WP1A will use their 2014 meeting to advance this document
to the status of Draft New Report and send it to their parent group, ITU-R SG1, for
approval at their 2014 or 2015 meeting.
– There is a possibility that administrations involved in the work on this question will
support adding the spectrum requirements for Smart Grid to the next WRC’s
agenda.
• The RR-TAG approved document 18-13/035r3, the Update of
WirelessMan-Advanced RIT of Recommendation ITU-R M.2012 and
sent it for a 10 day EC ballot. It was approved and will be has been
forwarded to ITU-R WP5D.
Submission
Slide 4
Michael Lynch, MJ Lynch & Associates LLC
July, 2013
doc.: 18-13/0086
RR-TAG Items for September:
• Further responses to ITU-R on Question ITU-R 236/1 for WP1A’s
meeting in June, 2013. .
– It is recommended that the IEEE 802 contributions be completed by end of the
March, 2014 Plenary.
• Further contributions to ITU-R, FCC, especially as regards white
spaces and licensed use by Progeny and others of the 902 – 928 MHz
frequency band and to other regulatory bodies as needed.
• The RR-TAG agenda can be found on the RR-TAG’s Mentor web site;
expect that as normal there will be many revisions prior to the start of
the meeting.
• Don’t forget that for the most part you can maintain your voting rights
in your home group when you participate in the RR-TAG (and, of
course, log your attendance correctly!).