LUSI Coordination with LCLS LUSI within the LCLS Directorate at SLAC

advertisement
LUSI Coordination with LCLS
John Arthur
LCLS
LUSI within the LCLS Directorate at SLAC
Interface between LUSI and LCLS
Coordination tools
LUSI DOE Review August 20, 2008
Coordination with LCLS p. 1
John Arthur
jarthur@slac.stanford.edu
LCLS Directorate Structure
LCLS Director
Accelerator
Systems Div
Business Div
Experimental
Facilities Div
Engineering
Physics Div
Strategic
Projects Div
LCLS
Construction
LUSI
LUSI DOE Review August 20, 2008
Coordination with LCLS p. 2
John Arthur
jarthur@slac.stanford.edu
LUSI resources matrixed in
LCLS Director
Accelerator
Systems Div
Business Div
Experimental
Facilities Div
Engineering
Physics Div
Engineers
PMCS
LUSI DOE Review August 20, 2008
Coordination with LCLS p. 3
Instrument
scientists
Strategic
Projects Div
LCLS
Construction
LUSI
Controls
John Arthur
jarthur@slac.stanford.edu
Resources move as instruments turn on
LCLS Director
Accelerator
Systems Div
Business Div
Instrument
scientists
Experimental
Facilities Div
Engineering
Physics Div
Engineers
Strategic
Projects Div
LCLS
Construction
LUSI
LUSI DOE Review August 20, 2008
Coordination with LCLS p. 4
John Arthur
jarthur@slac.stanford.edu
The Interface between LUSI and LCLS
LCLS builds hutches and common infrastructure
LUSI builds instruments in the hutches
LUSI DOE Review August 20, 2008
Coordination with LCLS p. 5
John Arthur
jarthur@slac.stanford.edu
What LCLS will provide
LCLS is constructing the Halls and Hutches in which
LUSI instruments will live
Includes lighting, HVAC, service electrical outlets
Includes electrical, water, air interface points
LCLS is providing infrastructure for experiments
Includes network, timing, MPS, 120Hz data interfaces
Includes PPS
LCLS X-ray instrumentation will be available for use
by experiments
FEE attenuator, diagnostics available for user control
LCLS prototype 2d detector available for experiments
LUSI DOE Review August 20, 2008
Coordination with LCLS p. 6
John Arthur
jarthur@slac.stanford.edu
Formalizing the interface
Details worked out through discussion
LUSI-LCLS Integration Working Group
LUSI-LCLS Project Coordination
Details recorded in Interface Control Documents
Define and describe interface points (flange, junction box)
between LUSI and LCLS or other SLAC departments
LUSI DOE Review August 20, 2008
Coordination with LCLS p. 7
John Arthur
jarthur@slac.stanford.edu
Formal coordination methods
The LUSI-LCLS Integration Working Group
Defines the interface between LCLS and LUSI
Resolves issues overlapping this interface
Formalized with Interface Control Documents
Finds common solutions to common problems
Experimental instrumentation, diagnostics
Standardization where appropriate
Members from LUSI and from LCLS Photon Systems
LUSI DOE Review August 20, 2008
Coordination with LCLS p. 8
John Arthur
jarthur@slac.stanford.edu
Integration Working Group issues
Experimental data flow and interface standards
Formed LCLS/LUSI controls working group
Defined expected data flow rates at LCLS
Defined standard interface for detectors at LCLS
Working to define standard specifications for data handling
Far Experimental Hall optimization
Defined locations of LUSI instruments
Created specifications for FEH hutches
Working with LCLS facilities to optimize FEH hutch design
Standards for common systems
Established an integrated vacuum controls system
Established common understanding of survey practices and
accuracy for installation
LUSI DOE Review August 20, 2008
Coordination with LCLS p. 9
John Arthur
jarthur@slac.stanford.edu
More formal coordination methods
LUSI-LCLS Project Coordination Meetings
Coordinates use of LCLS Engineering resources
Resolves administrative issues
Members: T. Fornek, J. Arthur, J. Galayda
LUSI DOE Review August 20, 2008
Coordination with LCLS p. 10
John Arthur
jarthur@slac.stanford.edu
Interface Control Documents
LUSI DOE Review August 20, 2008
Coordination with LCLS p. 11
John Arthur
jarthur@slac.stanford.edu
Summary
LUSI is nested into the LCLS Directorate at SLAC
The interfaces are well-defined and documented
Technical and management tools help define the
interfaces and resolve common problems
LUSI DOE Review August 20, 2008
Coordination with LCLS p. 12
John Arthur
jarthur@slac.stanford.edu
Download