LCLS Undulator System Status and Schedule Geoff Pile 17 June 2008

advertisement
LCLS Undulator System
Status and Schedule
Geoff Pile
17 June 2008
FAC Review - Undulator System
Geoff Pile
pileg@aps.anl.gov
Safety Minute
Even though you wear your PPE you’re not always as safe as you might think. This
guy is wearing his face mask while arc welding. In this case, it’s almost as useful
as an ashtray on a motorbike.
Two really important
statements –
1. Never Underestimate
the Power of Co-incidence
(There could be more safety issues
less obvious than the one you are
trying to negate)
2. ISM – Do what you say
you do!
Define the scope
Analyze (ALL) hazards
Develop/implement controls
Perform the work within
controls
Feedback & improvement
17 June 2008
FAC Review - Undulator System
Geoff Pile
pileg@aps.anl.gov
Schedule Considerations
All Argonne girder components are planned to be available at
least 1 month before the P3 “Early Start” of Girder Assembly
17 June 2008
FAC Review - Undulator System
Geoff Pile
pileg@aps.anl.gov
Controls Status and Schedule
Controls -1.4.2 – Work Remaining
Undulator In-tunnel Rack (UIR)
Intra Undulator Cables
Electronic Interface Assembly (EIA)
17 June 2008
FAC Review - Undulator System
Geoff Pile
pileg@aps.anl.gov
1.4.2 - Controls
Ongoing Work
Completed
17 June 2008
FAC Review - Undulator System
Geoff Pile
pileg@aps.anl.gov
Undulator In-tunnel Rack (UIR)
17 June 2008
FAC Review - Undulator System
Geoff Pile
pileg@aps.anl.gov
Undulator In-tunnel Rack (UIR)
17 June 2008
FAC Review - Undulator System
Geoff Pile
pileg@aps.anl.gov
Electronic Interface Assembly (EIA)
~1800 Intra Undulator
Cables
(pre-made/pre-tested)
17 June 2008
FAC Review - Undulator System
Geoff Pile
pileg@aps.anl.gov
Undulator Magnets and Supports 1.4.3
Undulators (39 @ SLAC 7/2007)
Support & Motion System - girder, cam
movers & fixed supports (37@SLAC 3/2008)
X translation issue
Quads and Correctors (36 @SLAC 4/2008)
17 June 2008
FAC Review - Undulator System
Geoff Pile
pileg@aps.anl.gov
1.4.3 - Magnets and Supports
Ongoing Work
Completed
17 June 2008
FAC Review - Undulator System
Geoff Pile
pileg@aps.anl.gov
All 40 undulators were
completed by July 2007
17 June 2008
FAC Review - Undulator System
Geoff Pile
pileg@aps.anl.gov
Girders Assembled and
Packed at Hi-Tech
Girder Manufacture at Metalex Critical
Engineering and QA Oversight by Argonne
17 June 2008
FAC Review - Undulator System
Geoff Pile
pileg@aps.anl.gov
X Translation Stage,
Limit Switches,
and Adjustable
Switch Actuator
17 June 2008
FAC Review - Undulator System
Geoff Pile
pileg@aps.anl.gov
Obtaining X Translation Limits & Stops
17 June 2008
FAC Review - Undulator System
Geoff Pile
pileg@aps.anl.gov
Tuning block modification
17 June 2008
FAC Review - Undulator System
Geoff Pile
pileg@aps.anl.gov
1.4.3.5 - Quads and Correctors
37 magnets and 2 sets of
spare coils completed 4/08
17 June 2008
FAC Review - Undulator System
Geoff Pile
pileg@aps.anl.gov
Vacuum Systems 1.4.4
46 Vacuum Chambers produced
Manufacture started September 2007 & ended May 2008
33 required
7 spares
1 LTT
5 sacrificed for surface finish measurements
Monumental task, huge effort, successful ending.
Interest has already been expressed in this technology by
other projects around the world.
17 June 2008
FAC Review - Undulator System
Geoff Pile
pileg@aps.anl.gov
1.4.4 - Vacuum
17 June 2008
FAC Review - Undulator System
Geoff Pile
pileg@aps.anl.gov
Inspection of the total
length of the LCLS
Vacuum Chamber
17 June 2008
FAC Review - Undulator System
Inspection and correction
of the LCLS VC end flange
perpendicularity
Geoff Pile
pileg@aps.anl.gov
Surface Finish Data of 46 Chambers…
33 required (7 spare – 5 sacrificed – 1 LTT)
Extrusion #
1
2
3
4
5
6
8
9
11
h (mm)
353.57
216.02
248.52
236.10
261.25
271.06
302.81
251.17
230.72
rms transverse slope (mrad)
45.45
20.03
27.78
23.69
23.03
37.19
32.23
31.14
25.14
rms longitudinal slope (mrad)
17.36
7.98
8.53
12.29
9.47
13.52
14.06
19.12
9.82
12
13
14
15
17
18
19
20
21
22
23
24
25
26
27
29
30
31
32
33
34
36
37
38
39
40
41
42
43
44
45
46
294.41
308.75
350.85
306.37
324.34
341.19
246.35
244.29
331.53
268.19
275.33
229.15
258.43
325.92
327.66
327.50
317.95
334.76
230.19
230.15
294.70
245.60
198.97
345.21
311.58
311.04
341.13
233.57
342.60
321.34
332.56
254.38
27.43
26.59
38.58
34.49
26.67
50.46
24.78
18.58
34.12
36.40
40.43
23.36
28.51
46.87
53.97
38.76
45.59
47.89
25.44
21.74
44.42
23.85
17.83
48.72
51.02
35.81
49.27
22.24
56.25
52.82
52.82
29.50
15.57
12.64
19.37
15.04
16.20
20.50
11.62
8.08
15.48
14.26
18.56
10.83
10.14
18.46
23.10
20.36
18.91
19.96
12.65
10.27
16.32
8.93
6.85
22.86
18.62
15.33
15.58
10.99
21.74
18.67
19.04
10.34
Totals (rms)
36.94
15.52
17 June 2008
FAC Review - Undulator System
Transverse:
The transverse rms slope
tolerance is 60 mrad
Longitudinal:
Slope Criteria from H-D Nuhn
adjusted for the oval shape
Desirable
Acceptable
Not Desirable
Should Avoid
Geoff Pile
pileg@aps.anl.gov
Diagnostic Systems 1.4.5
BPM – 1.4.5.5
BFW – 1.4.5.6
BLM – 1.4.5.8
17 June 2008
FAC Review - Undulator System
Geoff Pile
pileg@aps.anl.gov
1.4.5.5 - Diagnostics - BPM
17 June 2008
FAC Review - Undulator System
Geoff Pile
pileg@aps.anl.gov
BPM Testing at Argonne
17 June 2008
FAC Review - Undulator System
Geoff Pile
pileg@aps.anl.gov
Beam Position Monitor
Large effort- solved serious production problems
Many brazing issues
(differential thermal expansion)
Window QA problems
Multi-step Process now
understood
8 now delivered to SLAC
-remainder on track
Promising World Class Diagnostic
17 June 2008
FAC Review - Undulator System
Geoff Pile
pileg@aps.anl.gov
1.4.5 - Diagnostics – BFW & BLM
17 June 2008
FAC Review - Undulator System
Geoff Pile
pileg@aps.anl.gov
Beam Finder Wire
All production problems are resolved at this point,
but we were somewhat delayed due to issues with
repeatability, chamber coating, and electronic
modules.
Two units that should have shipped last week are
on the way to SLAC at this time.
Details in Dean Walters’ talk
17 June 2008
FAC Review - Undulator System
Geoff Pile
pileg@aps.anl.gov
Beam Loss Monitor
Five production BLMs will be used to protect the undulators
by inhibiting beam bunches following an “above-threshold”
radiation event.
A joint R&D effort is aimed at enhancing these 5 units to
enable LCLS to track each undulator’s accumulated
radiation dose.
Undulator protection is the highest priority. The BLM will be integrated into the
Machine Protection System (MPS) and requires only limited dynamic range
from the detectors.
Dose tracking will enable long-term magnet damage to be characterized, but
requires a radiation detector with large dynamic range (order of 106) and
sophisticated diagnostics hardware and software.
30 production BLMs may be built in FY09 if R&D is
successful
17 June 2008
FAC Review - Undulator System
Geoff Pile
pileg@aps.anl.gov
Beam Loss Monitor
Interface Module
17 June 2008
FAC Review - Undulator System
BLM in Inserted Position
(Can be easily made to track out
with Undulator)
Geoff Pile
pileg@aps.anl.gov
Long Term Test
17 June 2008
FAC Review - Undulator System
Geoff Pile
pileg@aps.anl.gov
Long Term Test
17 June 2008
FAC Review - Undulator System
Geoff Pile
pileg@aps.anl.gov
Long Term Test
17 June 2008
FAC Review - Undulator System
Geoff Pile
pileg@aps.anl.gov
Status and Schedule
Undulator System Management and Integration
CPR & Costs to go –
Generally in good shape. Some unplanned effort has been
required in the last two months to solve problems and meet
production schedules.
Most spares costs were moved to OPC. Final spares costs will
be recalculated using actuals and any required adjustments will
be made.
Green Sheet System
A Web-based, almost real time, method of managing ArgonneAPS cross- matrixed effort – (up to 60 staff 18FTE’s/year)
ASK System
A Web-based method of managing deliveries and technical
documentation. A dictionary/index style look-up system.
17 June 2008
FAC Review - Undulator System
Geoff Pile
pileg@aps.anl.gov
Summary
Almost all deliveries complete by July 2008!
Production BLMs? TBD (2009)
Argonne Construction team rolls off the
project in July
Argonne Management team drops to halftime in mid-July, and rolls off the project in
September.
FY09 – a small budget is included for
installation and commissioning support
17 June 2008
FAC Review - Undulator System
Geoff Pile
pileg@aps.anl.gov