LUSI Status Update Tom Fornek Project Manager 12 November 2008

advertisement
SLAC National Accelerator Laboratory
LUSI Status Update
Tom Fornek
Project Manager
12 November 2008
LUSI Update
1
Tom Fornek
tomf@slac.stanford.edu
SLAC National Accelerator Laboratory
Project description (1)
LUSI will deliver:
Three X-ray scattering instruments that have
been funded by DOE-BES as a “Major Item of
Equipment (MIE)” project:
XPP
CXI
XCS
12 November 2008
LUSI Update
X-ray Pump Probe
Coherent X-ray Imaging
X-ray Correlation Spectroscopy
2
Tom Fornek
tomf@slac.stanford.edu
SLAC National Accelerator Laboratory
Project description (2)
Near Experimental Hall
1
2
Far Experimental Hall
3
4
XPP
XCS
Beam Transport
LCLS
LUSI
12 November 2008
LUSI Update
5
6
CXI
Offset Monochromator
Exp. Chamber
Detector
3
Tom Fornek
tomf@slac.stanford.edu
SLAC National Accelerator Laboratory
LUSI Status Changes June-November
LCLS Directorate Organization
Developed
LUSI Project Execution Plan Approved
CD-2 Approved Oct. 22, 2008
LUSI Team Leader Meetings Held
12 November 2008
LUSI Update
4
Tom Fornek
tomf@slac.stanford.edu
SLAC National Accelerator Laboratory
LCLS Directorate Organization
LCLS Directorate
Dale Knutson
Mark Reichanadter, Deputy
Accelerator Systems Division
Experimental Facilities Division
John Seeman
TBD, Deputy
Jochen Schneider
Jerome Hastings, Deputy
Business Office
Engineering Physics Division
Cindy Lowe
TBD, Deputy
Dave Schultz
James Krebs, Deputy
Strategic Projects Division
John Galayda
LUSI Incorporated into LCLS Directorate
12 November 2008
LUSI Update
5
Tom Fornek
tomf@slac.stanford.edu
SLAC National Accelerator Laboratory
LCLS STRATEGIC PROJECTS DIVISION
LCLS Strategic Projects Division
John Galayda – Division Director
Michael Scharfenstein – ES&H
Darren Marsh – QA
Helen O’Donnell – Administrative Support
LCLS Construction Project
John Galayda – Project Director
Mark Reichanadter – Deputy Project Director
Jess Albino – Associate Project Director for Civil Cinstruction
LUSI MIE Project
Tom Fornek – Project Manager
TBD – Deputy Project Manager
LUSI uses LCLS Directorate Services (ES&H, QA, PMCS,
Finance)
12 November 2008
LUSI Update
6
Tom Fornek
tomf@slac.stanford.edu
SLAC National Accelerator Laboratory
LUSI INTEGRATED PROJECT TEAM
DOE-HQ
Harriet Kung, Acquisition Executive
T.E. Kiess, Program Manager
DOE-SSO
H. Joma
DOE Federal Project Director
Instrument Team
Leaders
SLAC
T. Fornek
LUSI Project Manager
TBD - Deputy
Technical Configuration Control
Committee
WBS 1.2 XPP IIT
WBS 1.3 CXI IIT
WBS 1.4 XCS IIT
D. Fritz
(Instr. Scientist)
J. Langton
( Lead Eng)
J. Delor
J. Defever
S. Boutet
(Instr. Scientist)
P. Montanez
( Lead Eng)
A. Busse
K. Fox
A. Robert
(Instr. Scientist)
E. Bong
(Lead Eng)
T. Osier
12 November 2008
LUSI Update
7
DOE-SSO
Support
LCLS
Directorate Support
Engineering
WBS 1.5 DCO
Y. Feng
(Lead Scientist)
E. Ortiz
(Lead Eng )
T. Montagne
M. Campell
R. Jackson
B. Bigornia
WBS 1.6
Data Acquisition &
Controls
G. Haller
(Lead)
Tom Fornek
tomf@slac.stanford.edu
SLAC National Accelerator Laboratory
LUSI Scope
There are six level 2 WBS elements in WBS 1.0
WBS 1.1 – Project Management
WBS 1.2 – X-ray Pump Probe (XPP)
WBS 1.3 – Coherent X-ray Imaging (CXI)
WBS 1.4 – X-ray Correlation Spectroscopy (XCS)
WBS 1.5 – Diagnostics and Common Optics
Includes XPP, CXI and XCS diagnostics and optics
WBS 1.6 – Controls and Data Acquisition
Includes XPP, CXI and XCS controls and DAQ
12 November 2008
LUSI Update
8
Tom Fornek
tomf@slac.stanford.edu
SLAC National Accelerator Laboratory
LUSI Cost Baseline
WBS
CD-2 Est.
($M)
Description
1.1
Project Management
5.5
1.2
X-ray Pump Probe (w/BNL)
5.9
1.3
Coherent X-ray Imaging
9.5
1.4
X-ray Correlation Spectroscopy (w/BNL)
7.7
1.5
Diagnostics & Common Optics
6.4
1.6
Controls & Data Acquisition
7.1
Contingency
13.0
Other Project Costs
4.9
2.0
LUSI Total Project Costs
12 November 2008
LUSI Update
60.0
9
Tom Fornek
tomf@slac.stanford.edu
SLAC National Accelerator Laboratory
LUSI Funding Profile ($M)
Prior
Yrs
TEC
FY07
FY08
FY09
FY10
FY11
FY12
Total
0.50
6.00
15.00
15.00
13.50
5.10
55.10
OPC
3.40
1.50
Total
3.40
2.00
12 November 2008
LUSI Update
4.90
6.00
10
15.00
15.00
13.50
5.10
60.00
Tom Fornek
tomf@slac.stanford.edu
SLAC National Accelerator Laboratory
LUSI ADVANCE PROCUREMENT REQUEST AT CD-2
BUDGETED COST
BUDGETED COST +
CONTINGENCY
Sample tilt Platform
245,321
380,247
Sample Kappa
Platform
130,552
228,466
Parts
186,650
281,842
XPP Detector Mover
Detector Mover
183,831
292,291
1,182,846
Coherent X-ray
Imaging
1.0 micron KB Mirror
system (Note 1)
986,450
1,775,610
1,775,610
Diffractometer
System
531,294
929,765
XCS Detector Mover
688,800
1,350,048
2,279,813
1,173,831
1,855,888
1,855,888
4,126,729
7,094,157
7,094,157
DESCRIPTION
X-ray Pump/Probe
Diffractometer
X-ray Coherent
Scattering
Diagnostics &
Common Optics
PROCUREMENT
REQUEST
Large Offset
Monochromator
TOTAL
12 November 2008
LUSI Update
11
WBS TOTAL
Tom Fornek
tomf@slac.stanford.edu
SLAC National Accelerator Laboratory
LUSI Schedule Changes
CD-2 Review Recommendation to plan for one CD-3 and
one CD-4 incorporated into baseline plan
CD-3 – April, 2010
CD-4 – August, 2012
Early science milestones for XPP and CXI established as
Level 2 milestones
XPP – October, 2010
Commissioning readiness in July, 2010
CXI – August, 2011
Commissioning readiness in April, 2011
12 November 2008
LUSI Update
12
Tom Fornek
tomf@slac.stanford.edu
SLAC National Accelerator Laboratory
LUSI Schedule Baseline
CALENDAR YEARS
2008
2009
2010
XPP Procurement
Approval
CD-2
12 November 2008
LUSI Update
XPP Early
Science
CD-3
13
2011
2012
CXI Early
Science
CD-4
Tom Fornek
tomf@slac.stanford.edu
SLAC National Accelerator Laboratory
BA Plan & BCWS to Fit BA Profile
$57,000,000
$54,000,000
Contingency
$51,000,000
1.6 - Controls
$48,000,000
1.5 - DCO
$45,000,000
1.4 - XCS
1.3 - CXI
$42,000,000
1.2 - XPP
$39,000,000
1.1 - Program Mgmt
Funding
$36,000,000
$33,000,000
$30,000,000
$27,000,000
$24,000,000
$21,000,000
$18,000,000
$15,000,000
$12,000,000
$9,000,000
$6,000,000
$3,000,000
12 November 2008
LUSI Update
4
12
-Q
3
FY
12
-Q
2
FY
12
-Q
1
FY
12
-Q
4
FY
11
-Q
3
FY
11
-Q
2
FY
11
-Q
1
FY
11
-Q
4
FY
10
-Q
3
FY
10
-Q
2
FY
10
-Q
1
FY
10
-Q
4
14
FY
09
-Q
3
FY
09
-Q
2
FY
09
-Q
1
FY
09
-Q
4
FY
08
-Q
3
FY
08
-Q
2
FY
08
-Q
1
FY
08
-Q
FY
FY
07
-Q
4
$-
Tom Fornek
tomf@slac.stanford.edu
SLAC National Accelerator Laboratory
XPP Instrument Design
Detector Mover
Detector
Diagnostics
Sample
Goniometer
12 November 2008
LUSI Update
15
XPP
D. Fritz
Tom Fornek
tomf@slac.stanford.edu
SLAC National Accelerator Laboratory
CXI Instrument Design
Particle injector
0.1 micron
KB system
CXI
S. Boutet
1 micron focus
KB system (not
shown)
Diagnostics &
Wavefront Monitor
12 November 2008
LUSI Update
Detector Stage
(Utilizing the LCLS Detector)
16
Sample Chamber
with raster stage
Tom Fornek
tomf@slac.stanford.edu
SLAC National Accelerator Laboratory
XCS Instrument Design
Optical raft (1.4.2)
Optics and Diagnostics (1.5)
Diffractometer
(1.4.4.1)
XCS
A. Robert
12 November 2008
LUSI Update
Large Angle Detector Stage
(1.4.4.3)
17
Tom Fornek
tomf@slac.stanford.edu
SLAC National Accelerator Laboratory
Instrument Team Leaders
XPP
K. Gaffney, Photon Science-SLAC (leader)
D. Reis, University of Michigan
T. Tschentscher, DESY
J. Larsson, Lund Institute of Technology
A. Nilsson, Photon Science-SLAC
XCS
B. Stephenson, ANL (leader)
K. Ludwig, Boston University
G. Grübel, DESY
CXI
J. Hajdu, Photon Science-SLAC, Uppsala University (leader)
H. Chapman, LLNL
J. Miao, UCLA
12 November 2008
LUSI Update
18
Tom Fornek
tomf@slac.stanford.edu
SLAC National Accelerator Laboratory
Instrument Update
CXI
WBS 1.3
X-ray transport tunnel
XCS
WBS 1.4
XPP
WBS 1.2
Hutch 6
Hutch 1
Hutch 2
12 November 2008
LUSI Update
XCS Offset
Monochromator
WBS 1.5
19
Tom Fornek
tomf@slac.stanford.edu
SLAC National Accelerator Laboratory
AMO
Control Room
Near Experimental Hall
XPP
Control Room
AMO
(LCLS)
XPP Endstation
Hutch 3
12 November 2008
LUSI Update
20
Tom Fornek
tomf@slac.stanford.edu
SLAC National Accelerator Laboratory
Photon Shutter
XPP Instrument @ LCLS
Intensity Monitor
Slits
Profile Monitor
Intensity Monitor
Slits
Focusing Lenses
Attenuators
Pulse Picker
Mirrors
Slits
Intensity Monitor
Profile Monitor
Sample Goniometer
Detector Mover
Profile Monitor
Intensity Monitor
Photon Shutter
12 November 2008
LUSI Update
21
Tom Fornek
tomf@slac.stanford.edu
SLAC National Accelerator Laboratory
XPP Schedule
Components Available in Mid-2010
Components Available in 2012 (or before)
Sample Goniometer (Kappa & Tilt Platform)
X-ray Focusing Lenses
Detector Mover
Harmonic Rejection Mirrors
X-ray Detector System
Attenuators
Laser System Optics and Diagnostics
Laser Power Amplifier
X-ray Slits
Optical Parametric Amplifier
X-ray Pulse Picker
X-ray Diagnostics
Controls & DAQ
12 November 2008
LUSI Update
22
Tom Fornek
tomf@slac.stanford.edu
SLAC National Accelerator Laboratory
Far Experimental Hall
Control Room
Lab Area
Hutch 6
X-ray Correlation Spectroscopy
Instrument (Hutch 4)
12 November 2008
LUSI Update
Coherent X-ray Imaging Instrument
(Hutch 5)
23
Tom Fornek
tomf@slac.stanford.edu
SLAC National Accelerator Laboratory
Photon Shutter
Requirement
Device
Remove X-ray beam halo
X-ray Guard Slits/Apertures
Attenuators
Tailor X-ray repetition rate
Pulse Picker
Pulse Picker
Characterize X-ray pulse intensity
Intensity Monitor
Guard Slits
Characterize X-ray spatial profile
Profile Monitor
Diagnostics
Characterize X-ray pulse intensity before
the sample on every shot
Non-destructive Intensity Monitor
Characterize X-ray focus
Wavefront Monitor
Align experiment without X-ray beam
Reference Laser
Maximize X-ray flux on sample
Tailor focal spot size to the sample
Focusing optics
1 micron Kirkpatrick-Baez Mirrors
0.1 micron Kirkpatrick-Baez Mirrors
Minimize air scatter and background
Position sample and final apertures
Sample environment
Position sample environment
Instrument Stand
Deliver single particles to the X-ray beam
in the gas phase
Particle Injector
Measure X-ray scattering pattern
2D X-ray Detector (Utilizing the LCLS
Detector)
Position X-ray area detector
Detector Stage
Analysis of sample fragments after
Coulomb explosion
Ion Time-of-Flight
X-ray Transport Tunnel
Guard Slits
Diagnostics
Reference Laser
Guard Slits
CXI
Physics Requirements
Tailor X-ray intensity
Attenuators
Diagnostics
KB Mirrors
Guard Slits
FEH Hutch 5
Diagnostics
KB Mirrors
Aperture
Aperture
Sample Environment
Particle Injector
Ion TOF-MS
Detector Stage
Wavefront Monitor
Beam Dump
12 November 2008
LUSI Update
24
Tom Fornek
tomf@slac.stanford.edu
SLAC National Accelerator Laboratory
Instrument Availability
Components Available in Early 2011
“CXI Early Science”
Components Available in 2012
(or before)
Alignment Laser
0.1 micron KB System
1 micron KB System
Sample Chamber for 0.1 micron KB
Sample Chamber for 1 micron KB
Particle Injector
2D Detector
Ion Time-of-Flight
Detector Stage
Diagnostics & Common Optics
Controls & DAQ
12 November 2008
LUSI Update
25
Tom Fornek
tomf@slac.stanford.edu
SLAC National Accelerator Laboratory
CXI Major Accomplishments
Added 1 micron sample chamber to reduce project risk
Conducted LUSI’s first advance procurement technical review
CXI 1 micron mirror system - October 8
Developed one micron K-B mirror system mechanical support
system concept
Provided hutch 5 specification input to LCLS Conventional
Facilities for FEH hutch design
Cornell detector system progressing well
Support system design developed
Satellite Workshop held Friday, October 17
“ Application of Coherent X-rays at the LCLS”
12 November 2008
LUSI Update
26
Tom Fornek
tomf@slac.stanford.edu
SLAC National Accelerator Laboratory
Far Experimental Hall
Control Room
Lab Area
Hutch 6
X-ray Correlation Spectroscopy
Instrument (Hutch 4)
12 November 2008
LUSI Update
27
Coherent X-ray Imaging Instrument
(Hutch 5)
Tom Fornek
tomf@slac.stanford.edu
SLAC National Accelerator Laboratory
Photon Shutter
Primary Slits
Diagnostics
Monochromator
Transport Tunnel
Secondary Slits
Diagnostics
Split and Delay
Secondary Slits
Diagnostics
Focusing Lenses
Photon Shutter
Attenuators
Pulse Picker
FEH Hutch 4
Harm. Rej. Mirrors
Defining Slits
Diagnostics
Diffractometer
Large Angle
Detector Stage
XCS Instrument @ LCLS
Goal
Time-resolved observation of coherent diffraction patterns
using LCLS coherent hard x-rays (6-25keV)
Tailor and characterize X-ray beam parameters
Spatial profile
Intensity
Repetition Rate
Spectral Bandwidth
X-ray Photon Correlation Spectroscopy
Requirements
Versatility of the instrumentation (SAXS, WAXS, GI)
Coherence preservation of x-ray optics (to the extent possible)
Detector with small pixel size/Large sample-detector
distance
Key Performance Parameters
4-20 keV energy range
Using the fundamental and third harmonic
0.1-0.01% energy resolution
12 November 2008
LUSI Update
28
Tom Fornek
tomf@slac.stanford.edu
SLAC National Accelerator Laboratory
XCS CD-4 Deliverables
Device
Ready Date
4-circle Diffractometer (Horiz. Scattering )
CD-4 (8/2012)
Large Angle Detector Mover
CD-4 (8/2012)
Large Offset Monochromator
CD-4 (8/2012)
Harmonic Rejection Mirrors
CD-4 (8/2012)
X-ray Focusing Lens
CD-4 (8/2012)
Pop-In Profile Monitor (5)
CD-4 (8/2012)
Pop-In Intensity Monitor (5)
CD-4 (8/2012)
Intensity-Position Monitors (5)
CD-4 (8/2012)
Attenuators
CD-4 (8/2012)
Guard Slits (6)
CD-4 (8/2012)
Pulse Picker
CD-4 (8/2012)
12 November 2008
LUSI Update
29
Tom Fornek
tomf@slac.stanford.edu
SLAC National Accelerator Laboratory
XCS Major Accomplishments
Developed detailed cost and schedule baseline
Provided hutch 4 specification input to LCLS
Conventional Facilities for FEH hutch design
Added XCS large offset monochromator back into
diagnostics and common optics scope
Satellite Workshop held Friday, October 17
“ Application of Coherent X-rays at the LCLS”
12 November 2008
LUSI Update
30
Tom Fornek
tomf@slac.stanford.edu
SLAC National Accelerator Laboratory
Thank You
12 November 2008
LUSI Update
31
Tom Fornek
tomf@slac.stanford.edu