SLAC National Accelerator Laboratory LUSI Status Update Tom Fornek Project Manager 12 November 2008 LUSI Update 1 Tom Fornek tomf@slac.stanford.edu SLAC National Accelerator Laboratory Project description (1) LUSI will deliver: Three X-ray scattering instruments that have been funded by DOE-BES as a “Major Item of Equipment (MIE)” project: XPP CXI XCS 12 November 2008 LUSI Update X-ray Pump Probe Coherent X-ray Imaging X-ray Correlation Spectroscopy 2 Tom Fornek tomf@slac.stanford.edu SLAC National Accelerator Laboratory Project description (2) Near Experimental Hall 1 2 Far Experimental Hall 3 4 XPP XCS Beam Transport LCLS LUSI 12 November 2008 LUSI Update 5 6 CXI Offset Monochromator Exp. Chamber Detector 3 Tom Fornek tomf@slac.stanford.edu SLAC National Accelerator Laboratory LUSI Status Changes June-November LCLS Directorate Organization Developed LUSI Project Execution Plan Approved CD-2 Approved Oct. 22, 2008 LUSI Team Leader Meetings Held 12 November 2008 LUSI Update 4 Tom Fornek tomf@slac.stanford.edu SLAC National Accelerator Laboratory LCLS Directorate Organization LCLS Directorate Dale Knutson Mark Reichanadter, Deputy Accelerator Systems Division Experimental Facilities Division John Seeman TBD, Deputy Jochen Schneider Jerome Hastings, Deputy Business Office Engineering Physics Division Cindy Lowe TBD, Deputy Dave Schultz James Krebs, Deputy Strategic Projects Division John Galayda LUSI Incorporated into LCLS Directorate 12 November 2008 LUSI Update 5 Tom Fornek tomf@slac.stanford.edu SLAC National Accelerator Laboratory LCLS STRATEGIC PROJECTS DIVISION LCLS Strategic Projects Division John Galayda – Division Director Michael Scharfenstein – ES&H Darren Marsh – QA Helen O’Donnell – Administrative Support LCLS Construction Project John Galayda – Project Director Mark Reichanadter – Deputy Project Director Jess Albino – Associate Project Director for Civil Cinstruction LUSI MIE Project Tom Fornek – Project Manager TBD – Deputy Project Manager LUSI uses LCLS Directorate Services (ES&H, QA, PMCS, Finance) 12 November 2008 LUSI Update 6 Tom Fornek tomf@slac.stanford.edu SLAC National Accelerator Laboratory LUSI INTEGRATED PROJECT TEAM DOE-HQ Harriet Kung, Acquisition Executive T.E. Kiess, Program Manager DOE-SSO H. Joma DOE Federal Project Director Instrument Team Leaders SLAC T. Fornek LUSI Project Manager TBD - Deputy Technical Configuration Control Committee WBS 1.2 XPP IIT WBS 1.3 CXI IIT WBS 1.4 XCS IIT D. Fritz (Instr. Scientist) J. Langton ( Lead Eng) J. Delor J. Defever S. Boutet (Instr. Scientist) P. Montanez ( Lead Eng) A. Busse K. Fox A. Robert (Instr. Scientist) E. Bong (Lead Eng) T. Osier 12 November 2008 LUSI Update 7 DOE-SSO Support LCLS Directorate Support Engineering WBS 1.5 DCO Y. Feng (Lead Scientist) E. Ortiz (Lead Eng ) T. Montagne M. Campell R. Jackson B. Bigornia WBS 1.6 Data Acquisition & Controls G. Haller (Lead) Tom Fornek tomf@slac.stanford.edu SLAC National Accelerator Laboratory LUSI Scope There are six level 2 WBS elements in WBS 1.0 WBS 1.1 – Project Management WBS 1.2 – X-ray Pump Probe (XPP) WBS 1.3 – Coherent X-ray Imaging (CXI) WBS 1.4 – X-ray Correlation Spectroscopy (XCS) WBS 1.5 – Diagnostics and Common Optics Includes XPP, CXI and XCS diagnostics and optics WBS 1.6 – Controls and Data Acquisition Includes XPP, CXI and XCS controls and DAQ 12 November 2008 LUSI Update 8 Tom Fornek tomf@slac.stanford.edu SLAC National Accelerator Laboratory LUSI Cost Baseline WBS CD-2 Est. ($M) Description 1.1 Project Management 5.5 1.2 X-ray Pump Probe (w/BNL) 5.9 1.3 Coherent X-ray Imaging 9.5 1.4 X-ray Correlation Spectroscopy (w/BNL) 7.7 1.5 Diagnostics & Common Optics 6.4 1.6 Controls & Data Acquisition 7.1 Contingency 13.0 Other Project Costs 4.9 2.0 LUSI Total Project Costs 12 November 2008 LUSI Update 60.0 9 Tom Fornek tomf@slac.stanford.edu SLAC National Accelerator Laboratory LUSI Funding Profile ($M) Prior Yrs TEC FY07 FY08 FY09 FY10 FY11 FY12 Total 0.50 6.00 15.00 15.00 13.50 5.10 55.10 OPC 3.40 1.50 Total 3.40 2.00 12 November 2008 LUSI Update 4.90 6.00 10 15.00 15.00 13.50 5.10 60.00 Tom Fornek tomf@slac.stanford.edu SLAC National Accelerator Laboratory LUSI ADVANCE PROCUREMENT REQUEST AT CD-2 BUDGETED COST BUDGETED COST + CONTINGENCY Sample tilt Platform 245,321 380,247 Sample Kappa Platform 130,552 228,466 Parts 186,650 281,842 XPP Detector Mover Detector Mover 183,831 292,291 1,182,846 Coherent X-ray Imaging 1.0 micron KB Mirror system (Note 1) 986,450 1,775,610 1,775,610 Diffractometer System 531,294 929,765 XCS Detector Mover 688,800 1,350,048 2,279,813 1,173,831 1,855,888 1,855,888 4,126,729 7,094,157 7,094,157 DESCRIPTION X-ray Pump/Probe Diffractometer X-ray Coherent Scattering Diagnostics & Common Optics PROCUREMENT REQUEST Large Offset Monochromator TOTAL 12 November 2008 LUSI Update 11 WBS TOTAL Tom Fornek tomf@slac.stanford.edu SLAC National Accelerator Laboratory LUSI Schedule Changes CD-2 Review Recommendation to plan for one CD-3 and one CD-4 incorporated into baseline plan CD-3 – April, 2010 CD-4 – August, 2012 Early science milestones for XPP and CXI established as Level 2 milestones XPP – October, 2010 Commissioning readiness in July, 2010 CXI – August, 2011 Commissioning readiness in April, 2011 12 November 2008 LUSI Update 12 Tom Fornek tomf@slac.stanford.edu SLAC National Accelerator Laboratory LUSI Schedule Baseline CALENDAR YEARS 2008 2009 2010 XPP Procurement Approval CD-2 12 November 2008 LUSI Update XPP Early Science CD-3 13 2011 2012 CXI Early Science CD-4 Tom Fornek tomf@slac.stanford.edu SLAC National Accelerator Laboratory BA Plan & BCWS to Fit BA Profile $57,000,000 $54,000,000 Contingency $51,000,000 1.6 - Controls $48,000,000 1.5 - DCO $45,000,000 1.4 - XCS 1.3 - CXI $42,000,000 1.2 - XPP $39,000,000 1.1 - Program Mgmt Funding $36,000,000 $33,000,000 $30,000,000 $27,000,000 $24,000,000 $21,000,000 $18,000,000 $15,000,000 $12,000,000 $9,000,000 $6,000,000 $3,000,000 12 November 2008 LUSI Update 4 12 -Q 3 FY 12 -Q 2 FY 12 -Q 1 FY 12 -Q 4 FY 11 -Q 3 FY 11 -Q 2 FY 11 -Q 1 FY 11 -Q 4 FY 10 -Q 3 FY 10 -Q 2 FY 10 -Q 1 FY 10 -Q 4 14 FY 09 -Q 3 FY 09 -Q 2 FY 09 -Q 1 FY 09 -Q 4 FY 08 -Q 3 FY 08 -Q 2 FY 08 -Q 1 FY 08 -Q FY FY 07 -Q 4 $- Tom Fornek tomf@slac.stanford.edu SLAC National Accelerator Laboratory XPP Instrument Design Detector Mover Detector Diagnostics Sample Goniometer 12 November 2008 LUSI Update 15 XPP D. Fritz Tom Fornek tomf@slac.stanford.edu SLAC National Accelerator Laboratory CXI Instrument Design Particle injector 0.1 micron KB system CXI S. Boutet 1 micron focus KB system (not shown) Diagnostics & Wavefront Monitor 12 November 2008 LUSI Update Detector Stage (Utilizing the LCLS Detector) 16 Sample Chamber with raster stage Tom Fornek tomf@slac.stanford.edu SLAC National Accelerator Laboratory XCS Instrument Design Optical raft (1.4.2) Optics and Diagnostics (1.5) Diffractometer (1.4.4.1) XCS A. Robert 12 November 2008 LUSI Update Large Angle Detector Stage (1.4.4.3) 17 Tom Fornek tomf@slac.stanford.edu SLAC National Accelerator Laboratory Instrument Team Leaders XPP K. Gaffney, Photon Science-SLAC (leader) D. Reis, University of Michigan T. Tschentscher, DESY J. Larsson, Lund Institute of Technology A. Nilsson, Photon Science-SLAC XCS B. Stephenson, ANL (leader) K. Ludwig, Boston University G. Grübel, DESY CXI J. Hajdu, Photon Science-SLAC, Uppsala University (leader) H. Chapman, LLNL J. Miao, UCLA 12 November 2008 LUSI Update 18 Tom Fornek tomf@slac.stanford.edu SLAC National Accelerator Laboratory Instrument Update CXI WBS 1.3 X-ray transport tunnel XCS WBS 1.4 XPP WBS 1.2 Hutch 6 Hutch 1 Hutch 2 12 November 2008 LUSI Update XCS Offset Monochromator WBS 1.5 19 Tom Fornek tomf@slac.stanford.edu SLAC National Accelerator Laboratory AMO Control Room Near Experimental Hall XPP Control Room AMO (LCLS) XPP Endstation Hutch 3 12 November 2008 LUSI Update 20 Tom Fornek tomf@slac.stanford.edu SLAC National Accelerator Laboratory Photon Shutter XPP Instrument @ LCLS Intensity Monitor Slits Profile Monitor Intensity Monitor Slits Focusing Lenses Attenuators Pulse Picker Mirrors Slits Intensity Monitor Profile Monitor Sample Goniometer Detector Mover Profile Monitor Intensity Monitor Photon Shutter 12 November 2008 LUSI Update 21 Tom Fornek tomf@slac.stanford.edu SLAC National Accelerator Laboratory XPP Schedule Components Available in Mid-2010 Components Available in 2012 (or before) Sample Goniometer (Kappa & Tilt Platform) X-ray Focusing Lenses Detector Mover Harmonic Rejection Mirrors X-ray Detector System Attenuators Laser System Optics and Diagnostics Laser Power Amplifier X-ray Slits Optical Parametric Amplifier X-ray Pulse Picker X-ray Diagnostics Controls & DAQ 12 November 2008 LUSI Update 22 Tom Fornek tomf@slac.stanford.edu SLAC National Accelerator Laboratory Far Experimental Hall Control Room Lab Area Hutch 6 X-ray Correlation Spectroscopy Instrument (Hutch 4) 12 November 2008 LUSI Update Coherent X-ray Imaging Instrument (Hutch 5) 23 Tom Fornek tomf@slac.stanford.edu SLAC National Accelerator Laboratory Photon Shutter Requirement Device Remove X-ray beam halo X-ray Guard Slits/Apertures Attenuators Tailor X-ray repetition rate Pulse Picker Pulse Picker Characterize X-ray pulse intensity Intensity Monitor Guard Slits Characterize X-ray spatial profile Profile Monitor Diagnostics Characterize X-ray pulse intensity before the sample on every shot Non-destructive Intensity Monitor Characterize X-ray focus Wavefront Monitor Align experiment without X-ray beam Reference Laser Maximize X-ray flux on sample Tailor focal spot size to the sample Focusing optics 1 micron Kirkpatrick-Baez Mirrors 0.1 micron Kirkpatrick-Baez Mirrors Minimize air scatter and background Position sample and final apertures Sample environment Position sample environment Instrument Stand Deliver single particles to the X-ray beam in the gas phase Particle Injector Measure X-ray scattering pattern 2D X-ray Detector (Utilizing the LCLS Detector) Position X-ray area detector Detector Stage Analysis of sample fragments after Coulomb explosion Ion Time-of-Flight X-ray Transport Tunnel Guard Slits Diagnostics Reference Laser Guard Slits CXI Physics Requirements Tailor X-ray intensity Attenuators Diagnostics KB Mirrors Guard Slits FEH Hutch 5 Diagnostics KB Mirrors Aperture Aperture Sample Environment Particle Injector Ion TOF-MS Detector Stage Wavefront Monitor Beam Dump 12 November 2008 LUSI Update 24 Tom Fornek tomf@slac.stanford.edu SLAC National Accelerator Laboratory Instrument Availability Components Available in Early 2011 “CXI Early Science” Components Available in 2012 (or before) Alignment Laser 0.1 micron KB System 1 micron KB System Sample Chamber for 0.1 micron KB Sample Chamber for 1 micron KB Particle Injector 2D Detector Ion Time-of-Flight Detector Stage Diagnostics & Common Optics Controls & DAQ 12 November 2008 LUSI Update 25 Tom Fornek tomf@slac.stanford.edu SLAC National Accelerator Laboratory CXI Major Accomplishments Added 1 micron sample chamber to reduce project risk Conducted LUSI’s first advance procurement technical review CXI 1 micron mirror system - October 8 Developed one micron K-B mirror system mechanical support system concept Provided hutch 5 specification input to LCLS Conventional Facilities for FEH hutch design Cornell detector system progressing well Support system design developed Satellite Workshop held Friday, October 17 “ Application of Coherent X-rays at the LCLS” 12 November 2008 LUSI Update 26 Tom Fornek tomf@slac.stanford.edu SLAC National Accelerator Laboratory Far Experimental Hall Control Room Lab Area Hutch 6 X-ray Correlation Spectroscopy Instrument (Hutch 4) 12 November 2008 LUSI Update 27 Coherent X-ray Imaging Instrument (Hutch 5) Tom Fornek tomf@slac.stanford.edu SLAC National Accelerator Laboratory Photon Shutter Primary Slits Diagnostics Monochromator Transport Tunnel Secondary Slits Diagnostics Split and Delay Secondary Slits Diagnostics Focusing Lenses Photon Shutter Attenuators Pulse Picker FEH Hutch 4 Harm. Rej. Mirrors Defining Slits Diagnostics Diffractometer Large Angle Detector Stage XCS Instrument @ LCLS Goal Time-resolved observation of coherent diffraction patterns using LCLS coherent hard x-rays (6-25keV) Tailor and characterize X-ray beam parameters Spatial profile Intensity Repetition Rate Spectral Bandwidth X-ray Photon Correlation Spectroscopy Requirements Versatility of the instrumentation (SAXS, WAXS, GI) Coherence preservation of x-ray optics (to the extent possible) Detector with small pixel size/Large sample-detector distance Key Performance Parameters 4-20 keV energy range Using the fundamental and third harmonic 0.1-0.01% energy resolution 12 November 2008 LUSI Update 28 Tom Fornek tomf@slac.stanford.edu SLAC National Accelerator Laboratory XCS CD-4 Deliverables Device Ready Date 4-circle Diffractometer (Horiz. Scattering ) CD-4 (8/2012) Large Angle Detector Mover CD-4 (8/2012) Large Offset Monochromator CD-4 (8/2012) Harmonic Rejection Mirrors CD-4 (8/2012) X-ray Focusing Lens CD-4 (8/2012) Pop-In Profile Monitor (5) CD-4 (8/2012) Pop-In Intensity Monitor (5) CD-4 (8/2012) Intensity-Position Monitors (5) CD-4 (8/2012) Attenuators CD-4 (8/2012) Guard Slits (6) CD-4 (8/2012) Pulse Picker CD-4 (8/2012) 12 November 2008 LUSI Update 29 Tom Fornek tomf@slac.stanford.edu SLAC National Accelerator Laboratory XCS Major Accomplishments Developed detailed cost and schedule baseline Provided hutch 4 specification input to LCLS Conventional Facilities for FEH hutch design Added XCS large offset monochromator back into diagnostics and common optics scope Satellite Workshop held Friday, October 17 “ Application of Coherent X-rays at the LCLS” 12 November 2008 LUSI Update 30 Tom Fornek tomf@slac.stanford.edu SLAC National Accelerator Laboratory Thank You 12 November 2008 LUSI Update 31 Tom Fornek tomf@slac.stanford.edu