X-ray Overview John Arthur – LCLS Expt’l Facilities Div May 14, 2009 X-ray overview FAC meeting 8-10 June 2009 1 1 John Arthur jarthur@slac.stanford.edu Current LCLS Organization LCLS Director Dale Knutson Accelerator Systems Div Experimental Facilities Div John Seeman Jochen Schneider operate accelerator for science Business Div Cindy Lowe operate instruments for science Engineering Physics Div David Schultz Strategic Projects Div John Galayda LCLS Construction X-ray overview FAC meeting 8-10 June 2009 2 2 LUSI John Arthur jarthur@slac.stanford.edu LCLS Organization is changing Joachim Stöhr to become director of LCLS Accelerator parts to be split off into new directorate Will take several months to finalize Will not affect X-ray operations much X-ray overview FAC meeting 8-10 June 2009 3 3 John Arthur jarthur@slac.stanford.edu Division of responsibility ASD responsibility Undulator Hall XFD responsibility Near Experimental Hall Front End Enclosure Far Experimental Hall X-ray overview FAC meeting 8-10 June 2009 4 4 John Arthur jarthur@slac.stanford.edu Experimental Facilities Division (XFD) Jochen Schneider Operations J. Arthur Safety Instrumentation Projects Science J. Hastings Z. Van Hoover G. Pile (acting) Photon Beamlines Soft X-Rays FEE LCLS Project LUSI Instruments Document Control Hard X-Rays Technical Support Unit User Support Floor Coordinators X-ray overview FAC meeting 8-10 June 2009 ES&H Detectors, DAQ Data Analysis Application Software Scientific Computing Development of Optics and Diagnostics 2nd Generation Instruments 5 5 Quality Assurance Matrixed Org. John Arthur jarthur@slac.stanford.edu Experimental Facilities Division Tasks Manage safe operations in LCLS experimental areas Manage LCLS user program Maintain and upgrade X-ray instrumentation Enable good user science; initiate in-house research X-ray overview FAC meeting 8-10 June 2009 6 6 John Arthur jarthur@slac.stanford.edu Current XFD Priorities LCLS Construction: Installation in FEE, Hutch 1 Augment scientific and support staff Create structure for safe operations Begin User program LUSI: Accelerate schedule X-ray overview FAC meeting 8-10 June 2009 7 7 John Arthur jarthur@slac.stanford.edu FEE installation plan Two-phase installation Solid Attenuators Phase 1 Gas Attenuator Calorimeter Slit Gas Detectors K-Mono 5 mm collimator Direct Imager (Scintillator) FEL Offset Mirror Systems Phase 2 X-ray overview FAC meeting 8-10 June 2009 8 8 John Arthur jarthur@slac.stanford.edu FEE installation details Phase 1 includes all X-ray diagnostics Most items shipped to SLAC from LLNL, being installed Most wiring done, testing in progress First beam by end of June Phase 2 includes mirrors Install most component in June Beam-alignment cameras installed in July X-ray overview FAC meeting 8-10 June 2009 9 9 John Arthur jarthur@slac.stanford.edu LCLS Offset Mirror Systems 800-2000 eV to Hutch 1 HOMS: Hard x-ray Offset Mirror System SOMS: Soft x-ray Offset Mirror System insertable 800-2000 eV to Hutch 2 Shadow Wall Wall 2 insertable 2000-25000 eV to Hutch 3-6 X-ray overview FAC meeting 8-10 June 2009 10 10 John Arthur jarthur@slac.stanford.edu The first two LCLS instruments AMO Soft X-ray beamline without monochromator, for high-field experiments Funded by LCLS Construction Installation June 2009 Commissioning July 2009 X-ray overview FAC meeting 8-10 June 2009 SXR Soft X-ray beamline with monochromator, for materials science Funded by SXR Consortium Installation January 2010 Commissioning March 2010 11 11 John Arthur jarthur@slac.stanford.edu XFD staffing XFD began 2009 with some staff in place J. Schneider, J. Hastings, J. Arthur (upper management) H. Tompkins (NEH Area Manager) P. Stefan, S. Moeller (diagnostics physicists) N. van Bakel (detector physicist) J. Bozek (AMO scientist) D. Fritz, A. Robert, S. Boutet, Y. Feng (LUSI scientists) Matrix support from Laser group, Controls group, DAQ group, Rad Physics A total of about 20 people equal to 12 FTE X-ray overview FAC meeting 8-10 June 2009 12 12 John Arthur jarthur@slac.stanford.edu XFD staffing New staff supporting XFD early operations Z. Van Hoover (XFD Safety Officer) J. Bringetto (XFD Documentation Specialist) H. Kamil (LCLS User Admin) C. Bostedt (AMO scientist) D. Rich, J-C Castagna, M. Holmes (operations engineers) Coming soon, needed for AMO commissioning Floor Coordinators (3 just hired, need 6 total) Coming soon, not essential for AMO commissioning Additional technicians Administrator Additional scientists X-ray overview FAC meeting 8-10 June 2009 13 13 John Arthur jarthur@slac.stanford.edu New XFD Operations Structure Strong ties between XFD and ASD ASD operating structure used as a model for XFD Preparing key processes and documentation XFD directives: describe roles/responsibilities and prescribed actions XFD training plan and training records plan SAD, ASE to include NEH Instrument Readiness Review (IRR) process for adding capability to LCLS experimental area incrementally X-ray overview FAC meeting 8-10 June 2009 14 14 John Arthur jarthur@slac.stanford.edu Timeline to approval for experimental ops June Install/test FEE instrumentation Hire remaining staff, prepare processes and documentation Prepare for ARR Install AMO instrument in Hutch 1 Accelerator Readiness Review June 30 Validate operational readiness process, including IRR process July X-rays in FEE, commission diagnostics Finish AMO instrument installation/testing Instrument Readiness Review for AMO instrument Resolve any final issues X-rays to AMO, begin instrument commissioning X-ray overview FAC meeting 8-10 June 2009 15 15 John Arthur jarthur@slac.stanford.edu LCLS User Program Goal: safe, efficient operation promoting the best science LCLS will be a DOE-BES User Facility Access through proposal/review process LCLS scientific staff frequently collaborate with users, also maintain independent research programs X-ray overview FAC meeting 8-10 June 2009 16 16 John Arthur jarthur@slac.stanford.edu User Program Management LCLS and SSRL are combining resources, creating a common User Administration Group Managed by Cathy Knotts Manages User training, User agreements, User metrics LCLS supports one added User Administrator X-ray overview FAC meeting 8-10 June 2009 17 17 John Arthur jarthur@slac.stanford.edu LCLS Proposal Review Panel (PRP) PRP members Christina Back (San Diego) Magid Chergui (ETH Lausanne) Lew Cocke (Kansas) Gianluca Gregori (Cambridge, UK) Chi-Chang Kao (BNL) Steve Kevan (Oregon) Janos Kirz (LBNL) Dwayne Miller (Toronto) Juerg Osterwalder (University of Zuerich) Metin Tolan (University of Dortmund) Kyoshi Ueda (Sendai) Edgar Weckert (DESY) Two representatives of LCLS management without voting rights: Jerry Hastings Jochen Schneider X-ray overview FAC meeting 8-10 June 2009 18 18 John Arthur jarthur@slac.stanford.edu LCLS User Program: Important dates First proposal round close 9/1/2008 (AMO only) 2nd proposal round close 5/15/2009 (AMO, SXR) 3rd proposal round close 10/1/2009 (AMO, SXR, XPP) X-ray overview FAC meeting 8-10 June 2009 19 19 John Arthur jarthur@slac.stanford.edu LCLS User Program: First experiments First proposal round: 28 proposals from 16 countries (>200 scientists) PRP met in December, gave highest rank to ~10 proposals 10 experiments scheduled for Sept-Dec 2009 Second proposal round: 62 proposals from 15 countries (nearly 500 scientists!) PRP to meet in July. Rankings will be used for determining spring 2010 schedule X-ray overview FAC meeting 8-10 June 2009 20 20 John Arthur jarthur@slac.stanford.edu Summary XFD is a new department at SLAC, will run LCLS X-ray experimental facilities XFD and ASD are working together to operate LCLS XFD will be the interface between LCLS and the world user community XFD is staffing up and preparing a structure for safe, efficient operations X-ray overview FAC meeting 8-10 June 2009 21 21 John Arthur jarthur@slac.stanford.edu