Publications for Li Liu Publications for Li Liu 2016 Liu, L., Bannerman, P., Ding, X., Elliott, E., Ewart, G., Kong, X. (2016). The motives for and consequences of underpricing for construction contractors-evidence from Australia. Journal of Modern Project Management, 3(3), 36-45. Boakye, L., Liu, L. (2016). With the Projectisation of the World, The Time is Right to Unravel Why International Development Project (IDP) Failure is Prevalent. Universal Journal of Management, 4(3), 79-89. <a href="http://dx.doi.org/10.13189/ujm.2016.0403 01">[More Information]</a> 2015 Fahad, S., Liu, L. (2015). Causes of cost overruns on infrastructure projects in Saudi Arabia. International Journal of Collaborative Enterprise, 5(1-2), 32-57. <a href="http://dx.doi.org/10.1504/IJCENT.2015.07 3176">[More Information]</a> Boakye, L., Liu, L. (2015). Governance of tomorrow's international development projects (IDPS): flexible or rigid? Journal of Modern Project Management, 2(3), 54-61. Liu, L., Kong, X., Chen, J. (2015). How project duration, upfront costs and uncertainty interact and impact on software development productivity? A simulation approach. International Journal of Agile Systems and Management, 8(1), 39-52. <a href="http://dx.doi.org/10.1504/IJASM.2015.068 605">[More Information]</a> Heredia Rojas, B., Liu, L., Taborda, L. (2015). Relational approach of value creation for construction project delivery: A conceptual framework. 31st Annual Association of Researchers in Construction Management (ARCOM) Conference, Reading, UK: ARCOM, Association of Researchers in Construction Management. Heredia Rojas, B., Liu, L. (2015). Value creation in construction projects: current approaches and insight from stakeholder theory for future directions. COBRA AUBEA Conference 2015, London: Royal Institution of Chartered Surveyors. 2014 Kong, X., Liu, L., Tran, T., Sandrasegaran, K. (2014). Analysis of Stakeholder Concerns for Vehicle Navigation System Architecture Solution. 5th International Conference on Communications and Electronics (IEEE ICCE 2014), Da Nang, Vietnam: (IEEE) Institute of Electrical and Electronics Engineers. Liu, L., Borman, M., Gao, J. (2014). Delivering complex engineering projects: Reexamining organizational control theory. International Journal of Project Management, 32(5), 791-802. <a href="http://dx.doi.org/10.1016/j.ijproman.2013. 10.006">[More Information]</a> Bani Hashemi, S., Liu, L. (2014). Differentiating the role of ex-ante and ex-post relational governance mechanisms in regulating client-contractor relationships. 2014 Portland International Center for Management of Engineering and Technology (PICMET 2014), Portland, Oregan: (IEEE) Institute of Electrical and Electronics Engineers. Banihashemi, S., Liu, L. (2014). Formal Contracts, Social Capital, or Social Exchange; Which One Works. The 2014 International Conference on Construction and Real Estate Management, Reston: American Society of Civil Engineers (ASCE). Liu, L., Bannerman, P., Elliot, E., Ewart, G., Atkinson, S. (2014). Underpricing for Construction Projects - A Double-Edged Sword: A Survey of Australian Construction Contractors. PMI Research and Education Conference 2014, Portland, Oregon, USA: Project Management Institute (PMI). 2013 Bani Hashemi, S., Liu, L. (2013). A Socio-Economic Framework for Adopting Governance Mechanisms in Large Construction Projects. 29th Annual Association of Researchers in Construction Management Conference (ARCOM 2013), Reading, UK: ARCOM, Association of Researchers in Construction Management. Bani Hashemi, S., Liu, L. (2013). A socio-economic framework for adopting governance mechanisms in large construction projects. 29th Annual Association of Researchers in Construction Management Conference (ARCOM 2013), Reading, UK: ARCOM, Association of Researchers in Construction Management. Fakhri, A., Liu, L. (2013). Adoption of Offsite Manufacturing in the Construction Industry. Fourteenth International Conference on Civil, Structural and Environmental Engineering Computing, Stirlingshire, Scotland: Civil-Comp Press. Fakhri, A., Liu, L. (2013). Adoption of offsite manufacturing in the construction industry: The role of industry-level coordination and leadership. Fourteenth International Conference on Civil, Structural and Environmental Engineering Computing, Stirlingshire, Scotland: Publications for Li Liu Civil-Comp Press. <a href="http://dx.doi.org/10.4203/ccp.102.159">[ More Information]</a> Reich, B., Liu, L., Sauer, C., Bannerman, P., Cicmil, S., Cooke-Davies, T., Gemino, A., Hobbs, B., Maylor, H., Messikomer, C., et al (2013). Developing better theory about project organizations. International Journal of Project Management, 31(7), 938-942. <a href="http://dx.doi.org/10.1016/j.ijproman.2013. 07.001">[More Information]</a> Bani Hashemi, S., Liu, L. (2013). Formal Governance Mechanism and its Application in Construction Projects. Journal of Construction Engineering and Project Management, 3(1), 22-27. <a href="http://dx.doi.org/10.6106/JCEPM.2013.3.1 .022">[More Information]</a> Bani Hashemi, S., Liu, L. (2013). Formal Governance Mechanism in Construction Projects. The 2013 Architectural Engineering Institute (AEI) Conference, Pennsylvania: The Department of Architectural Engineering. Kong, X., Liu, L., Chen, J. (2013). Modeling Impacts on Software Development Productivity. 2013 Asian Conference on the Social Sciences (ACSS 2013), Singapore: Singapore Management and Sports Science Institute. Atkinson, S., Tavakolitabaezavareh, S., Walker, D., Liu, L., Hossain, L. (2013). Securing the bolts before the horse has bolted: A new Perspective on Managing Collaborative Assurance. 2013 International Conference on Security and Management (SAM13), USA: CSREA Press. Bani Hashemi, S., Liu, L. (2013). Social Governance Mechanisms in Construction Projects. 19th CIB World Building Congress 2013, Brisbane, Australia: Queensland University of Technology. Banihashemi, N., Liu, L. (2013). Social Governance Mechanisms in Large Construction Projects. 19th CIB World Building Congress 2013, Brisbane, Australia: Queensland University of Technology. Allahaim, F., Liu, L. (2013). Toward a Typology: cost overrun causes framework in infrastructure projects. 19th CIB World Building Congress 2013, Brisbane, Australia: Queensland University of Technology. 2012 Kong, X., Liu, L., Tran, T. (2012). A cost-effective system design approach for vehicle positioning using GNSS/INS integration. International Journal of Vehicle Safety, 6(1), 28-47. <a href="http://dx.doi.org/10.1504/IJVS.2012.0485 33">[More Information]</a> Liu, L., Wang, X., Sheng, Z. (2012). Achieving ambidexterity in large, complex engineering projects: A case study of the Sutong Bridge project. Construction Management and Economics, 30(5), 399-409. <a href="http://dx.doi.org/10.1080/01446193.2012. 679948">[More Information]</a> Kong, X., Liu, L., Ryu, H. (2012). Activity-Artifact Flow of GPS/INS Integration for Positioning Error De-Correlation. In Fouzia Boukour Elbahhar and Atika Rivenq (Eds.), New Approach of Indoor and Outdoor Localization Systems, (pp. 193-212). Rijeka, Croatia: InTech Open Access Publishers (peer reviewed). Bani Hashemi, S., Liu, L. (2012). Lean Governance: A Paradigm Shift in Inter-Organizational Relationships (IORs) Governance. 20th Annual Conference of the International Group for Lean Construction (IGLC 2012), San Diego: Montezuma Publishing. Liu, L., Leitner, D. (2012). Simultaneous Pursuit of Innovation and Efficiency in Complex Engineering Projects-A Study of the Antecedents and Impacts of Ambidexterity in Project Teams. Project Management Journal, 43(6), 97-110. <a href="http://dx.doi.org/10.1002/pmj.21301">[M ore Information]</a> Liu, L., Leitner, D. (2012). The Antecedents and Effect of Ambidexterity in the Management of Complex Engineering Projects. PMI Research and Education Conference 2012, Limerick, Ireland: Project Management Institute (PMI). Allahaim, F., Liu, L. (2012). Understanding Major Causes Cost Overrun for Infrastructure Projects: A Typology Approach. 37th Australasian Universities Building Educators Association International Conference (AUBEA 2012), Sydney: University of NSW (UNSW). 2011 Kong, X., Liu, L., Lowe, D. (2011). A Cost-Effective Design Approach for Integrated Positioning System. 4th International Conference on Modeling, Simulation and Applied Optimization (ICMSAO 2011), Kuala Lumpur: (IEEE) Institute of Electrical and Electronics Engineers. <a href="http://dx.doi.org/10.1109/ICMSAO.2011.5 775580">[More Information]</a> Liu, L. (2011). Mirage or implementation pitfalls - in defence of risk registers as an effective risk management tool. Journal of Information Technology, 26(4), 277-279. <a href="http://dx.doi.org/10.1057/jit.2011.16">[M ore Information]</a> Publications for Li Liu Kong, X., Liu, L., Chen, J. (2011). Modeling Agile Software Maintenance Process Using Analytical Theory of Project Investment. 2011 International Conference on Advances in Engineering (ICAE), Nanjing, China: Elsevier. <a href="http://dx.doi.org/10.1016/j.proeng.2011.11 .2616">[More Information]</a> Liu, L., Nguyen, A., Arvanitakis, J. (2011). Project complexity as a moderator of performance bias towards overrun. 4th International Conference on Construction Engineering and Project Management (ICCEPM), Sydney: ICCEPM. 2010 Liu, L., Yetton, P., Sauer, C. (2010). A Normative Theory of Organizational Control: Main and Interaction Effects of Control Modes on Performance. 18th European Conference on Information Systems, South Africa: University of Pretoria. Kong, X., Liu, L., Tran, T. (2010). Modeling Satellite Positioning Errors in Different Configurations from End User's Viewpoint. 16th Asia-Pacific Conference on Communications (APCC 2010), Auckland: (IEEE) Institute of Electrical and Electronics Engineers. <a href="http://dx.doi.org/10.1109/APCC.2010.567 9708">[More Information]</a> Liu, L., Yetton, P., Sauer, C. (2010). Organizational Control and Project Performance. PMI Research & Education Conference 2010, USA: Project Management Institute (PMI). Conference, United States: Project Management Institute (PMI). Vlasic, A., Yetton, P., Liu, L. (2010). Why Information Systems Development Projects are Always Late. PMI Research & Education Conference 2010, USA: Project Management Institute (PMI). 2009 Wang, X., Liu, L., Sheng, Z. (2009). Ambidextrous Management of a Large, Complex Engineering Project with Significant Innovations-Case Study of the Sutong Bridge Project. 2009 IEEE 16th International Conference on Industrial Engineering and Engineering Management (IE&EM2009), Beijing, China: (IEEE) Institute of Electrical and Electronics Engineers. <a href="http://dx.doi.org/10.1109/ICIEEM.2009.53 44281">[More Information]</a> Liu, L. (2009). How does strategic uncertainty and project sponsorship relate to project performance? A study of Australian project managers. Management Research News: communication news of emergent international management research, 32(3), 239-253. <a href="http://dx.doi.org/10.1108/0140917091094 3101">[More Information]</a> Wang, X., Liu, L., Que, Z., Xu, T., Wang, B. (2009). Measuring the Corporate Performance of Intellectual Capital: Empirical Analysis in Three Types of Industries of China. 3rd International Conference on Risk Management & Global e-Business RMEB 2009, United States: UAPress. Liu, L., Wehbe, G., Sisovic, J. (2010). The Accuracy of Hybrid Estimating Approaches: A Case Study of an Australian State Road & Traffic Authority. Engineering Economist, 55, 225-245. <a href="http://dx.doi.org/10.1080/0013791X.2010. 502962">[More Information]</a> Liu, L., Yetton, P. (2009). Sponsorship and IT vendor management of projects. Journal of Information Technology, 24(1), 46-54. <a href="http://dx.doi.org/10.1057/jit.2009.2">[Mor e Information]</a> Liu, L., Napier, Z. (2010). The accuracy of risk-based cost estimation for water infrastructure projects: preliminary evidence from Australian projects. Construction Management and Economics, 28(1), 89-100. <a href="http://dx.doi.org/10.1080/0144619090343 1525">[More Information]</a> Liu, L., Napier, Z. (2008). The Predictive Validity & Performance Drivers of Risk-Based Estimating - Case studies of Australian Water Infrastructure Projects. 2008 PMI Research Conference, USA: Project Management Institute (PMI). Liu, L. (2010). The Effect of Intellectual Capital on Corporate Performance in Selected Industry Sectors in China. 2010 International Symposium on Statistics and Management Science, Nanjing. Kong, X., Liu, L., Lowe, D. (2007). A Web System Trace Model and Its Application to Web Design. Journal of Digital Information, 8(1), 1-29. Liu, L., Whebe, G., Sisovic, J. (2010). Which is More Accurate? Comparison of Estimation Accuracy Between Reference Class Forecasting, Risk-Based Estimating and the Conventional Fixed Contingency Approach. Project Management Institute Research and Education Chul, K., Liu, L. (2007). Cost Information Model for Managing Multiple Projects. Journal of Construction Engineering and Management, 133(12), 966-974. 2008 2007 Liu, L., Zhu, K. (2007). Improving Cost Publications for Li Liu Estimates of Construction Projects Using Phased Cost Factors. Journal of Construction Engineering and Management, 133(1), 91-95. Liu, L., Yetton, P. (2007). The contingent effects on project performance of conducting project reviews and deploying project management offices. IEEE Transactions on Engineering Management, 54(4), 789-799. 2006 Liu, L., Kong, X., Chen, R. (2006). An Economic Model of Software Development Approaches. The Twelfth Australasian World Wide Web Conference (AusWeb '06), Qld, Australia: Southern Cross University. Liu, L., Yetton, P. (2006). How do perceived project performance risk and management priority affect project sponsorship and project delivery capabilities? Evidence from a cross-industry survey. PMI Research Conference 2006, cd: Project Management Institute (PMI). 2005 Kong, X., Liu, L., Lowe, D. (2005). Modeling an Agile Web Maintenance Process. 11th Annual ANZSYS / Managing the Complex V Conference : Systems Thinking and Complecity Science: Insights for Action, Christchurch, New Zealand: ISCE Publishing. Kong, X., Liu, L., Lowe, D. (2005). Separation of Concerns: a Web Application Architecture Framework. Journal of Digital Information, 6(2), 1-8. Liu, L., Yetton, P. (2005). Sponsorship and IS Project Delivery Capability. 9th Pacific Asia Conference on Information Systems (PACIS 2005): IT & Value Creation, Bangkok, Thailand: Association for Information Systems (AIS). Kong, X., Liu, L., Lowe, D. (2005). Supporting Web User Interface Prototyping through Information Modeling and System Architecting. 2005 IEEE International Conference on e-Business Engineering - ICEBE 2005, Los Alamitos, California, USA: (IEEE) Institute of Electrical and Electronics Engineers. Liu, L., Yetton, P. (2005). The Contingent Effects of Project Governance Mechanisms on the Level of Control and Project Delivery Capability: Evidence from the Construction and Information Technology Services Industries. In Dennis P. Slevin, David I. Cleland, Jeffery K. Pinto (Eds.), Innovations: Project Management Research 2004, (pp. 481-498). Newtown Square, Pennsylvania, USA: Project Management Institute (PMI). Kong, X., Liu, L., Lowe, D. (2005). Web System Trace Model Using a Web Application Architecture Framework. The 2005 IEEE International Conference on e-Technology, e-Commerce and e-Service (EEE-05), Los Alamitos, California, USA: (IEEE) Institute of Electrical and Electronics Engineers. 2004 Zhu, K., Liu, L. (2004). A Contingent Framework For Applying Cost Estimation Methods To Construction Projects. The 4th International Conference on Construction Project Management ICCPM 2004, Singapore: Nanyang Technological University. Liu, L., Zhu, K. (2004). A Stage-By-Stage Factor Control Framework For Cost Estimation Of Construction Projects. "Clients Driving Innovation" International Conference 2004, Brisbane, Qld: CRC for Construction Innovation, QUT. Liu, L., Kong, X. (2004). A Web Application Architecture Framework. AusWeb04: The Tenth Australian World Wide Web Conference, Lismore, N.S.W: Southern Cross University Press. Lowe, D., Liu, L., Kong, X. (2004). Critical Feature Method - A Lightweight Web Maintenance Methodology For Smes. Journal of Digital Information, 5(2), 278. Liu, L., Wu, J. (2004). Dynamic Capabilities For Construction Contractors. "Clients Driving Innovation" International Conference 2004, Brisbane, Qld: CRC for Construction Innovation, QUT. Liu, L., Yetton, P. (2004). The Contingent Effects Of Project Governance Mechanisms On The Level Of Control And Project Delivery Capability?ence From The Construction And It Services Industries. In Dennis P. Slevin, David I. Cleland, Jeffery K. Pinto (Eds.), Innovations: Project Management Research 2004, (pp. 481-498). Newtown Square, Pennsylvania, USA: Project Management Institute (PMI). 2003 Kong, X., Liu, L. (2003). Critical Feature Method - A Lightweight Web Maintenance Methodology for SMEs. The 4th International Working with e-Business (We-B) Conference, CD-ROM: We-B Centre, School of Management Information Systems, Edith Cowan University,. Liu, L., Yetton, P. (2003). The Contingent Effects of Project Goverance Mechanisms on Project Performance - Evidence From the Construction and IT Service Industries. 14th Australian Conference on Information Systems, CD: Edith Cowan Univesity, We-B centre. Liu, L., Yetton, P., Sauer, C. (2003). The Effects of Organizational Control on Project Publications for Li Liu Performance in Construction and IT Services Companies. 14th Australian Conference on Information Systems, CD: Edith Cowan Univesity, We-B centre. 2001 Sauer, C., Liu, L., Johnston, K. (2001). Where Project Managers are Kings. Project Management Journal, 32(4), 39-49.