GLAST Large Area Telescope Gamma-ray Large Area Space Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software t@slac.stanford.edu ISOC Peer Review - March 2, 2004 Section 4.1 - 1 General Overview • DAQ group will provide 3 sets of hardware, built in parallel, to test the Trigger and Data Flow system: – Front End Simulator (FES) using a “Test Bed LAT”: – LAT-TD-02895 • Real electronics (all of it) up to the front-end cables on TEMs for all subsystems • No front-end electronics or sensors • Simulated data is driven down the cables for testing • This configuration allows for both static (data flow integrity) and dynamic (data flow throughput) testing – Functioning Tower without sensors – Functioning Tower with a subset of working sensors ISOC Peer Review - March 2, 2004 Section 4.1 - 2 LAT FSW: Executes on SIU and EPU ACD TKR Front-End Electronics (MCM) ACD Front-End Electronics (FREE) CAL Front-End Electronics (AFEE) FSW is an integral part of the data acquisition (DAQ) subsystem and is managed, budgeted, and scheduled as part of the DAQ subsystem TKR 16 Tower Electronics Modules & Supplies CAL Global-Trigger/ACD-EM/Signal-Distribution Unit* Spacecraft Interface Units (SIU)* – Storage Interface Board (SIB): Spacecraft interface, control & telemetry – LAT control CPU – LAT Communication Board (LCB): LAT command and data interface EPU-1 3 Event-Processor Units (EPU) (2 + 1 spare) – Event processing CPU – LAT Communication Board – SIB EPU-2 Power Dist. Unit* spare spare GASU* spare spare spare SIU* SIU* EPU-3 Power-Distribution Unit (PDU)* – Spacecraft interface, power – LAT power distribution – LAT health monitoring * Primary & Secondary Units shown in one chassis ISOC Peer Review - March 2, 2004 Section 4.1 - 3 Software Test-Bed for EM2/FU Tests • Provides a full DAQ system with EM2 hardware (interfaces and functionality identical to flight) before flight hardware is available – 16 TEMs and 16 TEM power supplies – Front end simulators TKR and CAL – Full ACD EM2 electronics Electronics Simulators – Fully redundent complete GASU and PDU – 2 SIUs and 3 EPUs. • • • • Allows realistic boot and startup tests because all the redundant data paths components are present, failover procedures can also be tested. TEM DAQ Modules TEM Power Supplies EPU-1 EPU-2 Pwr Dist. Box spare spare GASU spare spare 12 ACD Electronics Cards ACD spare SIU SC simulator ISOC Peer Review - March 2, 2004 EPU-3 LAT EGSE Section 4.1 - 4 Test-Stand (2) Racks for FES “feeder” CPUs 4x4 grid for electronics mounting Cable feedthroughs (as flight) Cable management (as flight) ISOC Peer Review - March 2, 2004 Section 4.1 - 5 Software Test Bed Hardware Configuration Host CPU Crate Target(s) 1553 Instrument comm’s Discretes Host Comm’s AEM High Speed Science Discretes GEM CPU CRU Power Dist’n EBM Instrument switches “SC” Power • • • • • GASU 16 TEMs + FESs Instrument Power SC switches Host – Spacecraft Instrument Interface Simulator (ethernet ) CPU Crate – cPCI flight equivalent chassis or commercial cPCI chassis “SC” Power – Instrument communications: LAT communications board (LCB) (cPCI form factor) – Host communications: Storage and Interface Board (SIB) (also does power bootstrap) – CPU: RAD750 processor or Motorola MCP750 COTS processor GASU – Full GASU implementation (including primary and redundant sides) Power Distribution – Full PDU implementation (including both primary and redundant sides) Target(s) – 16 Tower Electronics Modules (backed by Front End Simulators) ISOC Peer Review - March 2, 2004 Section 4.1 - 6 Front End Simulator FES Hardware Configuration • The FES hardware consists of 10 off-the-shelf PCs with Moselle PCI bridges and 4 x 120 Gbytes of local disk space. – Eight of the PCs will service 2 TEMs each. – The remaining 2 PCs will service the AEM and be home to the FES control system. • These PCs are connected to Front End Simulator Boards through PCI: – These boards accept data dictated by bandwidth considerations between the PC and the boards themselves. – On the output side, the boards manage the time sequenced distribution of data and the data presentation to the T&DF subsystem trigger and data cables. – 3 flavors of these boards; a TKR board, a CAL board, an ACD board. All physically identical, differing only by the code loaded. – Each board has two large banks of memory, one intended to hold the data and the other the timing transition vector information. – These memories also hold the storage used to implement the register model. A LAT command that writes a front-end register will actually write a location in these memories. ISOC Peer Review - March 2, 2004 Section 4.1 - 7 Front End Simulator Functional Pieces • • • • • • • • The FES consists of the following major functional blocks. They are presented roughly in data stream order: Data Source Generator – Simple Pattern Generator (Physics Monte Carlo, eg GlastSim) Data Munger – offline – Munges the output of the Data Source Generator into a format suitable for FES PC consumption Data Transfer Agent/Storage – Moves data from the storage media where it was generated to the FES storage system, i.e. the PC’s local disk system Data Munger - FES Front-End PC’s – Moves and possibly reformats the data from the FES storage system to the FES tower/subsystem simulator boards FES Tower/Subsystem Simulator Boards – Receives the data from the FES Front-End PC’s. These boards simulate both the sensor side and cable side of the LAT Front-End Electronics. Hardware System Control – Provides for the coordination and synchronization of the multiple PCs that compose the FES. User System Control – The interface used to control the FES. ISOC Peer Review - March 2, 2004 Section 4.1 - 8 Rest of the Test hardware • DAQ group will provide 3 sets of hardware, built in parallel, to test the Trigger and Data Flow system: – Front End Simulator (FES) using a “Test Bed LAT”: – Functioning Tower without sensors: • The test Tower contains operational front-end electronics • Allows FSW to test that its TEMs can be integrated with a Tower and that data can be successfully written to the Tower’s registers – Functioning Tower with a subset of working sensors: • The test Tower contains a subset of sensors as well as front-end electronics • Allows FSW to test event trigger using real physics data • Also test timing and calibration ISOC Peer Review - March 2, 2004 Section 4.1 - 9 Single Complete Tower Tower Electronics Module with Tower Power Supply VME CPU with LAT Communication Board (LCB) Full set of 4 CAL AFEE boards, (4 sides, 1 each) Full set of 36 TKR MCMs (4 sides, 9 each) ISOC Peer Review - March 2, 2004 Section 4.1 - 10