General Overview
• DAQ group will provide 3 sets of hardware, built in parallel, to
test the Trigger and Data Flow system:
– Front End Simulator (FES) using a “Test Bed LAT”:
– LAT-TD-02895
• Real electronics (all of it) up to the front-end cables on TEMs
for all subsystems
• No front-end electronics or sensors
• Simulated data is driven down the cables for testing
• This configuration allows for both static (data flow integrity) and
dynamic (data flow throughput) testing
– Functioning Tower without sensors
– Functioning Tower with a subset of working sensors
ISOC Peer Review - March 2, 2004
Section 4.1 - 2
LAT FSW: Executes on SIU and EPU
ACD
TKR Front-End Electronics (MCM)
ACD Front-End Electronics (FREE)
CAL Front-End Electronics (AFEE)
FSW is an integral part of the
data acquisition (DAQ)
subsystem and is managed,
budgeted, and scheduled as
part of the DAQ subsystem
TKR
16 Tower Electronics Modules & Supplies
CAL
Global-Trigger/ACD-EM/Signal-Distribution Unit*
Spacecraft Interface
Units (SIU)*
– Storage Interface
Board (SIB):
Spacecraft interface,
control & telemetry
– LAT control CPU
– LAT Communication
Board (LCB): LAT
command and data
interface
EPU-1
3 Event-Processor Units (EPU) (2 + 1
spare)
– Event processing CPU
– LAT Communication Board
– SIB
EPU-2
Power Dist. Unit*
spare
spare
GASU*
spare
spare
spare
SIU*
SIU*
EPU-3
Power-Distribution Unit (PDU)*
– Spacecraft interface,
power
– LAT power distribution
– LAT health monitoring
* Primary & Secondary Units shown in one chassis
ISOC Peer Review - March 2, 2004
Section 4.1 - 3
Software Test-Bed for EM2/FU Tests
• Provides a full DAQ system with EM2 hardware (interfaces and
functionality identical to flight) before flight hardware is available
– 16 TEMs and 16 TEM power supplies
– Front end simulators
TKR and CAL
– Full ACD EM2 electronics
Electronics
Simulators
– Fully redundent complete GASU and PDU
– 2 SIUs and 3 EPUs.
•
•
•
•
Allows realistic boot and startup tests
because all the redundant data paths
components are present, failover
procedures can also be tested.
TEM DAQ
Modules
TEM Power
Supplies
EPU-1
EPU-2
Pwr Dist. Box
spare
spare
GASU
spare
spare
12 ACD
Electronics
Cards
ACD
spare
SIU
SC
simulator
ISOC Peer Review - March 2, 2004
EPU-3
LAT EGSE
Section 4.1 - 4
Test-Stand (2)
Racks for FES “feeder” CPUs
4x4 grid for electronics mounting
Cable feedthroughs (as flight)
Cable management (as flight)
ISOC Peer Review - March 2, 2004
Section 4.1 - 5
Software Test Bed Hardware Configuration
Host
CPU Crate
Target(s)
1553
Instrument comm’s
Discretes
Host Comm’s
AEM
High Speed Science
Discretes
GEM
CPU
CRU
Power Dist’n
EBM
Instrument switches
“SC” Power
•
•
•
•
•
GASU
16 TEMs + FESs
Instrument Power
SC switches
Host
– Spacecraft Instrument Interface Simulator (ethernet )
CPU Crate
– cPCI flight equivalent chassis or commercial cPCI chassis
“SC” Power
– Instrument communications: LAT communications board (LCB) (cPCI form factor)
– Host communications: Storage and Interface Board (SIB) (also does power bootstrap)
– CPU: RAD750 processor or Motorola MCP750 COTS processor
GASU
– Full GASU implementation (including primary and redundant sides)
Power Distribution
– Full PDU implementation (including both primary and redundant sides)
Target(s)
– 16 Tower Electronics Modules (backed by Front End Simulators)
ISOC Peer Review - March 2, 2004
Section 4.1 - 6
Front End Simulator
FES Hardware Configuration
•
The FES hardware consists of 10 off-the-shelf PCs with Moselle PCI
bridges and 4 x 120 Gbytes of local disk space.
– Eight of the PCs will service 2 TEMs each.
– The remaining 2 PCs will service the AEM and be home to the FES
control system.
•
These PCs are connected to Front End Simulator Boards through PCI:
– These boards accept data dictated by bandwidth considerations
between the PC and the boards themselves.
– On the output side, the boards manage the time sequenced
distribution of data and the data presentation to the T&DF
subsystem trigger and data cables.
– 3 flavors of these boards; a TKR board, a CAL board, an ACD board.
All physically identical, differing only by the code loaded.
– Each board has two large banks of memory, one intended to hold
the data and the other the timing transition vector information.
– These memories also hold the storage used to implement the
register model. A LAT command that writes a front-end register will
actually write a location in these memories.
ISOC Peer Review - March 2, 2004
Section 4.1 - 7
Front End Simulator
Functional Pieces
•
•
•
•
•
•
•
•
The FES consists of the following major functional blocks. They are presented
roughly in data stream order:
Data Source Generator
– Simple Pattern Generator (Physics Monte Carlo, eg GlastSim)
Data Munger – offline
– Munges the output of the Data Source Generator into a format suitable for
FES PC consumption
Data Transfer Agent/Storage
– Moves data from the storage media where it was generated to the FES
storage system, i.e. the PC’s local disk system
Data Munger - FES Front-End PC’s
– Moves and possibly reformats the data from the FES storage system to the
FES tower/subsystem simulator boards
FES Tower/Subsystem Simulator Boards
– Receives the data from the FES Front-End PC’s. These boards simulate both
the sensor side and cable side of the LAT Front-End Electronics.
Hardware System Control
– Provides for the coordination and synchronization of the multiple PCs that
compose the FES.
User System Control
– The interface used to control the FES.
ISOC Peer Review - March 2, 2004
Section 4.1 - 8
Rest of the Test hardware
•
DAQ group will provide 3 sets of hardware, built in parallel, to test the
Trigger and Data Flow system:
– Front End Simulator (FES) using a “Test Bed LAT”:
– Functioning Tower without sensors:
• The test Tower contains operational front-end electronics
• Allows FSW to test that its TEMs can be integrated with a Tower
and that data can be successfully written to the Tower’s
registers
– Functioning Tower with a subset of working sensors:
• The test Tower contains a subset of sensors as well as front-end
electronics
• Allows FSW to test event trigger using real physics data
• Also test timing and calibration
ISOC Peer Review - March 2, 2004
Section 4.1 - 9
Single Complete Tower
Tower Electronics Module
with Tower Power Supply
VME CPU with
LAT Communication Board
(LCB)
Full set of 4 CAL AFEE boards,
(4 sides, 1 each)
Full set of 36 TKR MCMs
(4 sides, 9 each)