GLAST LAT Project Gamma-ray Large Area Space Telescope DOE/NASA Mechanical Systems Peer Review, March 27, 2003 GLAST Large Area Telescope: Mechanical Systems Peer Review March 27, 2003 2.3 – Risk List Marc Campell SLAC Mechanical Systems Mgr. marcc@slac.stanford.edu Document: LAT-PR-0XXXX Section 2.3 Risk List 1 GLAST LAT Project DOE/NASA Mechanical Systems Peer Review, March 27, 2003 Topics Agenda • Risk list Document: LAT-PR-0XXXX Section 2.3 Risk List 2 GLAST LAT Project DOE/NASA Mechanical Systems Peer Review, March 27, 2003 Risk Summary ID # Risk Rank Risk Description Risk Mitigation •X-LAT plate to Electronics box thermal joint does not perform as designed •1) Clarity interface responsibilities and requirements -complete •2) Detail interface options -complete •3) Complete interface analysis – prelim. Complete (Wang) Mech 0001 Mech 306 •4) Prototype interface techniques (Lam ) High •5) Complete detail box thermal analysis (Haller) •6) Select Design approach (Campell) •7) Complete integrated analysis (Wang) •8) Complete EM Test (Lam) • Radiator VCHP to Downspout and X-LAT heat pipes thermal joint fails during thermal vac test Mech 0002 Mech 307 Very Low Document: LAT-PR-0XXXX •1) Prototype verification test (ECD-July 03) •2) Develop process control requirements (ECD-Aug 03) Section 2.3 Risk List 3 GLAST LAT Project DOE/NASA Mechanical Systems Peer Review, March 27, 2003 Risk Summary ID # Mech 0003 Mech 308 Risk Rank Low Risk Description Risk Mitigation •CAL to Grid friction joint does not perform as designed. The critical joint properties (coefficient of friction and bolt clamping force) can not be directly verified before or after environmental test •EM testing of joint and FE model verification. •Maintain large design margins for joint load capability • 1) EM Test completed • 2) FE Model Verification • 3) Independent analysis complete • Maturing spacecraft design may result in late changes in Instrument/SC interfaces; resulting in LAT design changes past I-CDR and associated cost; schedule impact Mech 0004 Mech 321 Low Document: LAT-PR-0XXXX • Identify priority of detailed I/T design tasks with Spectrum via ongoing working groups •(1) Identify key I/F's driving detailed design by Peer Review 26 March. •(2) Complete final Interface drawings by 28 March to support final S/C-LAT ICD release. •(3) Finalize CG and document of internal agreements 28 March. •(4) Develop and agree upon closure plan with Spectrum for all issue identified in (1), LAT CDR (28 April Section 2.3 Risk List 4 GLAST LAT Project DOE/NASA Mechanical Systems Peer Review, March 27, 2003 Risk Summary ID # Risk Rank Risk Description Risk Mitigation •Availability of Grid and ACD-BEA for match drilling at mutually acceptable timeframes Mech 0005 Mech 323 •Establish multiple windows of opportunity to do the operation and or additional tooling • 1) Develop schedule window work-arounds (ECD – June 03) Low •2) Evaluate creating drill template to remove schedule dependency (ECD-June 03) • Repeatable X-LAT Thermal Joint performance Mech 0006 Mech 541 •X-LAT plates are removed to service electronics boxes Moderate •X-LAT plates could be removed after LAT or Observatory thermal testing •Repeatable Radiator Thermal Joint Performance Mech 0007 Mech 542 •Same as Mech 0001 Moderate •1) Same as Mech 0002 •“Wet” joint is disassembled & re-assemble after LAT thermal balance test •6 joints per radiator must be made within pot life of thermal adhesive Document: LAT-PR-0XXXX Section 2.3 Risk List 5 GLAST LAT Project DOE/NASA Mechanical Systems Peer Review, March 27, 2003 End of Section 2.3 Document: LAT-PR-0XXXX Section 2.3 Risk List 6