Lehman Review Feb 13-15 • In prep Budget estimates (NASA/DoE

advertisement
GLAST LAT Offline Software
Workshop - SLAC, Jan. 16-19, 2001
Lehman Review Feb 13-15
•
Joint NASA/DoE review
•
My understanding:
– “The purpose of the review is to
review the technical progress overall
and in each subsystem, examine the
proposed budget, cost and schedule
profile, and to evaluate the
management structures, including
the relationships to the GLAST
mission organization and the LAT
collaboration”
One day of plenary presentations to
the committee
•
•
One day of grilling in a smoke filled
room by subcommittees
•
Closeout and report day for the
committee
•
In prep
– Budget estimates (NASA/DoE
funding only!) prepared and
submitted to PMCS team
– Draft talks due in to IPO next
Tuesday AM, 1/23
– Dry run through talks all day
Wed 1/24
R.Dubois
GLAST LAT Offline Software
Workshop - SLAC, Jan. 16-19, 2001
Day One Agenda
8:00 a.m. Executive Session
9:00 a.m. Welcome.............................................................. J. Dorfan 15'
9:15 a.m. Science and Collaboration Overview.................. P. Michelson 25'
9:40 a.m. Project Management............................................ W. Althouse 35'
10:15 a.m. Break 15'
10:30 a.m. Instrument Design ............................................... S. Ritz 35'
11:05 a.m. Tracker ................................................................ R. Johnson 30'
11:35 a.m. Calorimeter.......................................................... N. Johnson 30'
12:05 p.m. Lunch 55'
1:00 p.m. Anticoincidence Detector .................................... J. Ormes 30'
1:30 p.m. Electronics, Data Acquisition, Flight Software... G. Haller 30'
2:00 p.m. Mechanical Systems............................................ M. Nordby 20'
2:20 p.m. Integration & Test, Calibration ........................ Nordby/Kamae 35'
2:55 p.m. Science Analysis Software .................................. R. Dubois 25'
3:20 p.m. Education & Public Outreach.............................. L. Cominsky 10'
3:30 p.m. Breakout Sessions (various rooms)
5:00 p.m. Executive Session
6:30 p.m. Adjourn for the day
7:00 p.m. Offsite Dinner
R.Dubois
GLAST LAT Offline Software
Workshop - SLAC, Jan. 16-19, 2001
Day Two Agenda
8:00 a.m. Breakout Sessions, Continued (various rooms)
11:00 a.m. Management Q&A Session
12:00 p.m. Lunch
1:00 p.m. Executive Session (Report Preparation)
8:00 a.m. Executive Session (Report Preparation), Continued
11:00 a.m. Closeout
12:00 p.m. Adjourn
R.Dubois
GLAST LAT Offline Software
Workshop - SLAC, Jan. 16-19, 2001
Breakouts - Tuesday
Breakout Sessions, Tuesday Afternoon:
Management
Addressing: Systems Engineering
Project Management Control System
Reviews & Reporting
International Agreements
Performance & Safety Assurance
Education & Public Outreach
Instrument Trigger & Data Acquisition Strategy
Addressing: Background Rejection
Triggering
Calibration Plan
Dataflow, Volume
Simulations
Instrument Integration & Test
Addressing: Integration Planning
Test Flow
Integration Facility Tour
Balloon Flight Engineering Model Integration
R.Dubois
GLAST LAT Offline Software
Workshop - SLAC, Jan. 16-19, 2001
Breakouts - Wednesday
Breakout Sessions, Wednesday Morning:
Instrument Technology and Implementation Details
Addressing: Tracker
Calorimeter
Anticoincidence Detector
Electronics, Flight Software
Schedules & Cost Estimates for the Above
Ground Software and Dataflow
Addressing: Instrument Operations Center
Science Analysis Software
Mission Operations
Data Analysis
Management (Question & Answer Session)