GLAST LAT Project Gamma-ray Large Area Space Telescope LAT Operations Planning, 23 March 2005 GLAST Large Area Telescope LAT Operations Planning 23 March 2005 Rob Cameron rac@slac.stanford.edu 650-926-2989 1 GLAST LAT Project LAT Operations Planning, 23 March 2005 LAT Operations Planning Purpose of these meetings – manage the ISOC – coordinate activities involving and supporting LAT operations (online and offline) – coordinate resource allocations and resource planning for LAT operations – provide coherent planning for the transition from LAT development and construction phase to operating phase – Parallel the LAT Managers Face to Face meetings, and eventually replace LAT F2F meetings after LAT Project Office closes 2 GLAST LAT Project LAT Operations Planning, 23 March 2005 Participants Participants in these meetings – Leads for major elements in the ISOC • Online operations: commanding, health and safety • Flight Software and Data Flow Lab support • PVO + calibration and analysis methods • Pipeline processing and delivery of LAT science data • Data analysis software and tools – Others as necessary • GLAST Project Office • Project Science • LAT Operations Steering Committee • SLAC management 3 GLAST LAT Project LAT Operations Planning, 23 March 2005 ISOC Organization ISOC Administrative Support Commanding, Health & Safety Flight Software Performance V&O Science Products Science Analysis Tools Timeline Planning Code Maintenance Calibration Level 1 CRs, gammas, diagnostics Simulation/Recon Command Generation Code V&V Performance Trending Level 2 Transients, GRBs Science Tools Command V&V Testbed Maintenance Standard Source Monitoring Pipeline Operation Infrastructure Health & Safety IRF Generation Configuration Tracking 4 GLAST LAT Project LAT Operations Planning, 23 March 2005 The ISOC in the LAT Collaboration ISOC has close connections to LAT Science Groups – e.g. Working with Calibration and Analysis Methods Group to incorporate improvements to event reconstruction into ISOC processing and products ISOC has broad involvement in the LAT collaboration – e.g. instrument performance analysis and tool development are coordinated by the ISOC across the collaboration 5 GLAST LAT Project LAT Operations Planning, 23 March 2005 SLAC Funding for ISOC Separation of costs for ISOC operations support and LAT research scientists at SLAC DOE applies $5M p.a. cap for ISOC operations Numbers below are TBR – staff not finalized (e.g. FSW, SDP) – resource sharing with LAT Project not finalized Rollup FY05 Ops Science FY06 Ops Science FY07 Ops Science FY08 Ops Science FTE 17.40 13.10 29.95 13.60 29.15 13.60 28.15 13.50 MGT 1.00 - 2.50 0.50 2.50 0.50 2.50 0.50 CHS 8.10 2.00 9.80 2.00 9.00 2.00 8.00 2.00 FSW 2.90 0.50 9.00 0.50 9.00 0.50 9.00 0.50 PVO 1.00 5.10 1.00 5.10 1.00 5.10 1.00 5.00 SDP - - - - - - - - SAS 4.40 5.50 6.40 5.50 6.40 5.50 6.40 5.50 SUP - - 1.25 - 1.25 - 1.25 - 3,770 2,189 4,719 2,397 4,532 2,481 4,540 2,545 $K (excl M&S) 6 GLAST LAT Project LAT Operations Planning, 23 March 2005 Logistics Meeting schedule – Face to Face, or VRVS? – Biweekly, weekly, monthly? – Wednesdays, 2pm PT, or other? Meeting format – Standard round-table summaries? – specific agenda items? – both? – Materials: Powerpoint,PDF,Confluence,URL? Location – “Kavli” conference room, 084/room 188 Mailing list(s) Web site(s) 7 GLAST LAT Project LAT Operations Planning, 23 March 2005 Agenda Items LAT Configuration and Tracking Database ISOC Facility areas – research activity to be concentrated in new KIPAC building – operations support to be concentrated in 084 – LAT Dataflow lab should stay in 084, where it is – move and expansion of ISOC operations facility from 210 to 084 as KIPAC vacates 084 – office shuffles in 084? Staffing plans for ISOC Coordination with I&T – support for I&T activities in 2005, 2006 – transition from I&T to ISOC-led operations Ground tests, I&T support, and Data Challenges – Unified support -> a model for the future? Other items? 8