GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 GLAST Large Area Telescope: Gamma-ray Large Area Space Telescope I&T Integration Kickoff Meeting Overview March 9th, 2004 Brian Grist SU-SLAC Subsystem Engineer bgrist@slac.stanford.edu 650-926-2998 Overview 1 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 I&T Organization Integration and Test Elliott Bloom, Manager (SU-SLAC) Brian Grist, I&T Engineer (SU-SLAC) WBS 4.1.9, 4.1.9.1 Integration, Facilities, Configuration, and Test Larry Wai, Manager (SU-SLAC) Thomas Borden, IFCT Engineer (SU-SLAC) WBS 4.1.9.6 TBD 5 Electrical Engineer Eliazar Ortiz Mechanical Engineer TBD 5 Electrical Engineer TBD 7 Electrical Technician Lead Mark Molini Mechanical Technician Lead TBD 3 Mechanical Technician Lead TBD 6 Electrical Technician TBD 8 Electrical Technician Reggie Rogers Mechanical Technician TBD 4 Mechanical Technician Mechanical Ground Support Equipment Eric Gawehn, Manager (SUSLAC) WBS 4.1.9.4 Bill Olson Mechanical Engineer Online Software Particle Test Ric Claus, Manager (SUSLAC) WBS 4.1.9.5 Gary Godfrey, Manager (SUSLAC) WBS 4.1.9.7 Environmental Test Michael Lovellette, Manager (NRL) WBS 4.1.9.8 I&T Tracker liaison and test group Hiro Tajima Physicist TBD 9 Mechanical Tech / Facilities Science Verification, Analysis, and Calibration Johann Cohen-Tannugi Physicist Mission Elliott Bloom, Manager (SUSLAC) WBS 4.1.9.A Eduardo do Couto e Silva, Manager (SU-SLAC) WBS 4.1.9.9 Selim Tuvi Software Developer Various Personnel from NRL Anders Borgland Engineering Physicist Patrick Williams Designer TBD 1 Engineering Physicist Xin Chen Software Developer Steve Score Designer TBD 2 Engineering Physicist Jim Panetta Engineering Physicist Overview 2 03 FEB 2004 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 I&T Department Responsibilities for Integration • • • • • IFCT (Integration, Facilities, Configuration, and Test) – Develop I&T plans, procedures. Layout, spec, and procure equipment and facilities needed for LAT integration at SLAC. Train and certify technician support for LAT flight hardware handling. Provide ongoing operational support of integration facilities and staff. Configuration control of all flight hardware. Setup and configuration of EGSE and MGSE. Supervise and perform I&T work in Building 33 (Integration Facility). MGSE (Mechanical Ground Support Equipment) – Supports the other I&T departments in their MGSE needs. This includes development, fabrication or procurement, assembly and qualification testing of all needed MGSE. It also includes support during use of the equipment. Online – Develop, test, and support software used to collect data LAT on test stands, stores data, and to monitor and control the test stand and data acquisition system. (Substantial hardware comes from the Electronics Subsystem). EGSE qualification and Verification. Configuration control of all I&T scripts used on Flight hardware. Particle Test – Develop, plan, and lead in the implementation of particle tests. Particle tests will include ground cosmic rays and Van de Graff photons. These tasks will require close coordination with all other departments in I&T. SVAC (Science Verification, Analysis, and Calibration) – Coordinate and help perform the data analysis for particle beam and cosmic ray tests. These tests are designed to ultimately calibrate the LAT, and to validate the LAT science performance requirements. SVAC acquires its information/data from low-level calibration tests on hardware units by the subsystems, from particle tests using EM, from particle tests on Flight units in the process of I&T, and finally from the full LAT. Overview 3 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 GLAST Integration Area – Building 33 SLAC Subassembly Preparation Clean Room Class 100,000 EGSE Room Gowning Room Office Area Receiving Area Covered by 15 Ton Crane 5 Ton Crane LAT Assembly Clean Room Class 100,000 Van de Graaff Accelerator with Beam Pipe Protruding into Clean Room Overview Locked Fence Flight Stores Lockup 4 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Preparation for Integration in I&T MGSE Particle Test EGSE / Online Software Science Verification Analysis and Calibration Facilities Training, Certification Ready for Integration Procedures Overview 5 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 6 month milestone summary • • • • • • • • • • • Verify Van de Graaff high rate capability Training Mockup complete Facility preparation (firewall, purge lines) complete EM-2 complete Test bed training, EGSE qualification & verification begins ACD Test Area Tent in building 33 4x4 lift fixture complete Single Bay I&T procedures complete Multi Bay I&T procedures complete LAT Rotation Stand assy, proof test complete IRR Overview 03/19/04 03/31/04 03/31/04 04/30/04 05/01/04 05/31/04 06/04/04 06/18/04 06/18/04 07/08/04 07/08/04 6 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Major Project Milestones TKR A 07/02/04 07/28/04 TKR 14 12/21/04 01/25/05 ACD 11/03/04 02/04/05 CAL A 07/09/04 CAL 14 12/2/04 DAQ 11/01/04 12/01/04 01/19/05 TEM/PS 14 10/05/04 12/02/04 X-LAT 08/12/04 08/12/04 FSW Formal Test 02/18/05 11/15/04 Install Twrs 1-13 13 wks Install Tower 14 1 wk Install Gbl Items 6 wks 07/30/04 07/12/04 08/02/04 TEM/PS A 05/12/04 07/02/04 GRID Assembly 06/11/04 07/07/04 Install Twrs A&B 8 wks 2 Tower CPT 3 wks 01/04/05 01/28/05 10/18/04 January 2004 Data FSW Complete 12/13/04 09/15/04 01/10/05 02/07/05 02/23/05 03/18/05 05/11/05 06/07/05 System Test 11 wks 10/31/05 10/31/05 Float 9 wks Ship LAT 1 wk Enviro Test 15 wks Float 4 wks LAT RFI Observ. Integration Launch 02/07 5 Weeks Dates Baseline Plan Overview Pre-Test / CD-4 Review 07/14/05 Pre-Ship Review 12/01/05 Color Code Subsystem I&T Test Mission 7