GLAST Mission - LAT Project Gamma-ray Large Area Space Telescope DOE/NASA Review March 31, 2004 GLAST Large Area Telescope: ISOC Subsystems WBS: 4.1.B David Lung Stanford Linear Accelerator Center ISOC Deputy Manager dlung@slac.stanford.edu Section ISOC 1 GLAST Mission - LAT Project DOE/NASA Review March 31, 2004 Review History • IOC Peer Design Review August 2001 • LAT PDR/Baseline Review January 2002 • Delta PDR/Baseline Review July 2002 • LAT CDR/CD3 May 2003 • ISOC Peer Review March 2004 Section ISOC 2 GLAST Mission - LAT Project DOE/NASA Review March 31, 2004 Significant Changes Since Last Lehman Review? • • GLAST Ground System Operation management team in placed Completed element peer reviews: – GLAST Science Support Center Peer Review – Mission Operations Center Peer Review – Instrument Science Operations Center Peer Review Potential Site – KIPAC building at SLAC • A Working Group was formed to review the Instrument Operations Center (IOC) implementation plan – Formulation of the Science Operations Group within ISOC • Rebaselined the ISOC budget • Bill Craig is acting ISOC manager Section ISOC 3 GLAST Mission - LAT Project DOE/NASA Review March 31, 2004 Mission Block Diagram – Mission View GPS TLM: Ku-band @ 40 Mbps S-band @ 1,2,4,8 kbps CMD: S-band @ .25, 4 kbps GPS Timing & Position Data TLM: S-band @ 2.5 Mbps CMD: S-band @ 2 kbps Ground Stations GLAST RT HK Telemetry Alerts Sci & HK Data Dumps Command Data RT HK Telemetry Command Data HK Data Dumps e.g. Wallops, MILA, USN Spacecraft I&T Facility Spectrum Astro Level 1/2 Data LAT Commands/Loads LAT ISOC GLAST Science Support Center GSFC FDF Science Community GSFC Burst Alerts Gamma-Ray Coordinates Network Level 0 Data Contingency Cmd As-Flown Timeline Burst Alerts Level 1/2 Data GBM Commands/Loads Archive Data Science Products SLAC Launch Site KSC Orbit Support GSFC Level 0 Data Observing Plan ToO Orders As-Flown Timeline White Sands Complex T&C Data Flows Mission Operations Center Level 0 Data Contingency Cmd As-Flown Timeline TDRS GSFC GBM Instrument Ops Center GCN Notices MSFC/NSSTC HEASARC GSFC Version: 11/19/03 Section ISOC 4 GLAST Mission - LAT Project DOE/NASA Review March 31, 2004 Mission Block Diagram – ISOC View GLAST TDRS LAT Collaboration Primary Backup White Sands Complex USN, Wallops Alerts Raw Data Instrument Uploads* Commands* Ops Data Products Mission Operations Center (MOC) GBM Level 0 Data GLAST Burst Monitor (GBM) IOC Level 0 and RT HK Data Ops Data Products Alerts Refined Alerts Level 1 and Level 2 Data Analysis Tools Raw Data Commands Instrument Uploads GRB Coordinates Network (GCN) Refined Alerts Schedules and Commanding LAT ISOC LOF SOG SAS Level 1 and Level 2 Data Analysis Tools Schedules Commands Instrument Uploads GLAST Science Support Center (GSSC) * test, early orbit, and backup only Section ISOC 5 GLAST Mission - LAT Project DOE/NASA Review March 31, 2004 ISOC Mission • Science • Acquisition, Analysis, Calibration, etc… • Review and maintain LAT Instrument health and safety • Review and trend health and safety telemetry • Provide necessary support for contingency operations – Immediate health and safety operations are handled at the GLSAT-MOC • Configure and maintain the instrument’s flight software and ground data bases • Instrument flight (on-board) software configuration • Command, telemetry, and calibration • Instrument command generation and validation • Archive Level 0 telemetry packets and higher-level products Section ISOC 6 GLAST Mission - LAT Project DOE/NASA Review March 31, 2004 To Meet The Mission • An Ad Hoc Working Group was formed to review the Instrument Operations Center (IOC) implementation plan • Members of the Working Group are: S. Digel (chair), E. do Couto e Silva, R. Dubois, P. Nolan, H. Tajima (with participation from S. Ritz, instrument scientist) • Charge to the working by the Project PI – Examine the plans to date for the IOC and, in particular, assess the adequacy of the IOC plan for serving the science needs of the collaboration. – Develop an operational picture/description that illustrates the role of each IOC element and the relationships between the elements. – Develop a strawman staffing plan that identifies needed full-time (and parttime) scientists, engineers, technicians, etc. Consideration should be given to how I&T activities will eventually phase out and the IOC will become fully operational. – Examine examples from other space astrophysics missions (e.g. CGRO/EGRET, SWIFT, Chandra, RXTE, SOHO/MDI., etc.) to understand the “lessons learned” and apply them in the context of GLAST Section ISOC 7 GLAST Mission - LAT Project DOE/NASA Review March 31, 2004 Major Findings from Working Group • Identified the need for a Science Operations Group within ISOC to support the instrument activities • Established a preliminary staffing plan/road map for formulating and staffing the ISOC • Identified the roles and responsibilities for the three major components of the ISOC Section ISOC 8 GLAST Mission - LAT Project DOE/NASA Review March 31, 2004 ISOC Elements Description • LAT Operations Facility (LOF) – Responsible for day-to-day operations of the LAT instrument and facility – Generate and coordinate commanding plans for the LAT instrument • Science Operations Group (SOG) – Supports LAT instrument calibration activities – Performs LAT instrument activity planning, trending & performance analysis and anomaly investigation – Perform sustaining engineering for the LAT instrument • Science Analysis Software (SAS) – Performs higher level data processing (Level 1 & 2) using Level 0 data provided by MOC, and provides data products to the GSSC – Archives and distributes science data products (for LAT collaborations) Section ISOC 9 GLAST Mission - LAT Project DOE/NASA Review March 31, 2004 ISOC Elements & Functions LAT IOC Manager LATOperations Operations Facility LAT Facility ScienceOperations OperationsGroup Group Science ScienceAnalysis AnalysisSoftware Software Science Operations Planning and Commanding Instrument Performance Monitoring Simulation/Recon Health & Safety Monitoring Monitoring & Diagnostics Software Infrastructure Flight Software Calibrations Science Tools Optimization Processing Server Data Processing Science Support Transient Source Alerts Section ISOC 10 GLAST Mission - LAT Project DOE/NASA Review March 31, 2004 ISOC Design Approach • ISOC design approach is to use as much as possible of the software and tools developed by Electronics, I&T and SAS – Many of the ISOC physicist and engineers are matrixed with other LAT subsystem to gain experience • LOF – ISOC ground software and operational tools will be developed and derived in coordination with I&T efforts – Command and telemetry database will be developed in coordination with I&T efforts – LOF team will include technicians, engineers and programmers who were involved with I&T throughout the instrument integration and testing • SOG – Draw from Science Verification Analysis and Calibration (SVAC) pre-launch efforts – Use analysis tools, instrument simulation, and processing pipeline developed by SAS – Use or develop additional operational tools from tools used for I&T – SOG personnel will include scientists and programmers who were involved with I&T • SAS – Experienced scientists and programmers who have developed the data processing, simulation/reconstruction, science tools and databases in support of Data Challenges and I&T Section ISOC 11 GLAST Mission - LAT Project DOE/NASA Review March 31, 2004 ISOC Organization Instrument InstrumentScience ScienceOperations OperationsCenter Center WBS: 4.1.B WBS: 4.1.B W. W.Craig Craig D.D.Lung Lung(Deputy) (Deputy) LAT LAT Performance Performance Assurance Assurance LAT Operations Facility LAT Operations Facility L. Bator, SLAC L. Bator, SLAC Console Operators transfer from I&T Science Operations Group Science Operations Group TBD TBD Mission (Instrument) Mission (Instrument) & Ops Planning & Ops Planning L. Bator, SLAC L. Bator, SLAC SOG Physicist/Engr SOG Physicist/Engr A. Borgland* A. Borgland* X. Chen* X. Chen* Facility Engineering Facility Engineering SW - J. Panetta* SW - J. Panetta* SW - TBD SW - TBD Network – TBD Network – TBD Systems – TBD Systems – TBD Physicists/Engineers transfer from I&T FSW & Test Bed FSW & Test Bed J.G. Thayer* J.G. Thayer* J.B. Thayer* J.B. Thayer* Operations Integrated Product Team SU-HEPL, SU-SLAC, GSFC, NRL, UCSC Science Analysis Software Science Analysis Software R. Dubois R. Dubois SAS Physicist/Engr SAS Physicist/Engr TBD TBD TBD TBD SAS Physicist/Engineers transfer from SAS 4.1.D * Matrixed to other Subsystems Section ISOC 12 GLAST Mission - LAT Project DOE/NASA Review March 31, 2004 ISOC Staffing Plan GLAST Launch 45.0 40.0 35.0 LAT Delivery to SAI 30.0 25.0 20.0 15.0 10.0 5.0 Q 4t h Q 3r d Q 2n d 1s tQ Q FY 20 07 4t h 3r d Q Q 2n d 1s tQ Q 20 06 4t h FY Q 3r d Q 2n d 1s tQ Q 20 05 4t h FY FY 20 04 3r d Q 0.0 Mgr LOF SOG SAS Section ISOC 13 GLAST Mission - LAT Project DOE/NASA Review March 31, 2004 ISOC Peer Review (3/2/04) Summary • Charge for the review – Requirements properly address the principal function of the center – ISOC design maturity, qualification and verification planning near CDR level – Open design issues and appropriate closure plans – Are the design, planning, and formulation of the ISOC properly defined? • Review was focused on the operation aspect of ISOC • 20 Request For Action/Recommendations – Concern areas are: • Staffing profile • ISOC organization – No significant technical finding or recommendation Section ISOC 14 GLAST Mission - LAT Project DOE/NASA Review March 31, 2004 ISOC Peer Review RFAs No. Section 1 1.1 Overview 2 1.1 Overview RFA Summary Need ISOC Management Plan & Approach Need overall functional block diagram illustrating the functional capabilities and data flow during various phases Requestor R. Schweiss R. Schweiss 3 4 5 1.1 Overview 1.1 Overview 2.1 Requirements Risk Analysis Reschedule ISOC CDR Level III requirements for the LOF and SOG are not complete R. Schweiss M. Rackley/C. Young M. Rackley 6 7 8 1.1 Overview 3.0 Ops Concept 3.0 Ops Concept M. Rackley/C. Young M. Rackley M. Rackley 9 10 1.1 Overview 2.3 V&V 11 12 13 14 3.0 Ops Concept 4.2 SW Maintainance 1.1 Overview 4.3 Networking Staffing plan and profile Define the ISOC reports for internal use and external use The ISOC does not yet know what system it is using to process Observatory HSK data or perform the commanding Describe lesson learned & approach ISOC verification does not involve early opportunities to validate/test using LAT instrument Verify LAT modes Understand the number of writes to EEPROM K. Lehtonen N. Johnson 15 16 1.1 Overview 2.3 Dev Approach 17 18 19 6.1 Gnd Ops SW 6.1 Gnd Ops SW 6.1 Gnd Ops SW 20 1.1 Overview ISOC detailed development schedule Enter a more formal agreement with SLAC management on required data storage and processing requirements ISOC organization structure & communications Define mechanism for ISOC requirements being placed on I&T and SAS Define LOF/SOG tools Specify plans and requirements for automation of Ops software Specify plans and requirements for Ops SW to be of sufficient robustness Specify what other ground system elements will be involved in LAT operations M. Rackley M. Rackley/N. Johnson M. Davis C. Young N. Johnson N. Johnson R. Corbert R. Corbert/M. Rackley R. Corbert R. Corbert Section ISOC 15 GLAST Mission - LAT Project DOE/NASA Review March 31, 2004 Major ISOC Release & Review Dates • ISOC Detail Design Review August 4 2004 • LOF SW Release 1 March 15, 2005 Support GRT #2 • LOF SW Release 2 Support GRT #5 October 14, 2005 • Mission Operations Review October 18, 2005 • Operation Readiness Review December 15, 2006 • Launch February 2007 Section ISOC 16 GLAST Mission - LAT Project DOE/NASA Review March 31, 2004 ISOC Critical Path Develop Procurement Specs 7/30/04 / -96 IOC CDR 8/4/04 / -64 ISOC S/W Release 2 10/14/05 / -34 Mission Simulations Complete 9/15/06 / 0 System Dev 1st set 7/20/05 / -98 CD-4 Review 7/14/05 / 0 ISOC S/W Release 1 3/15/05 /-203 Ground Readiness Test #5 11/15/05 / 0 System Operation 2nd set 9/29/06 / 0 Ground Readiness Test #2 4/1/05 / 0 Operational Model Complete 1/20/06 / 0 Launch 2/28/07 / -40 Procedures & Documentation 2nd set 9/30/05 / 0 LAT Ops Facility Validation & Verification Complete 6/2/06 / 0 Completion Dates/Variance to Baseline Section ISOC 17 GLAST Mission - LAT Project DOE/NASA Review March 31, 2004 Approved Cost Changes Since Rebaseline • No significant changes from rebaseline (k$) 4.1.B Baseline, November 03 Changes: Stanford Benefits Rate Increase $326 4.1.B Baseline, February 04 $328 $ 2 Section ISOC 18 GLAST Mission - LAT Project DOE/NASA Review March 31, 2004 Road Map to ISOC Detail Design Review • Establish agreements between the subsystems and ISOC for transitioning the necessary tools and staffing – Between I&T and ISOC – Between SAS and ISOC – Between Electronics and ISOC • Increase LOF staff • Address all RFAs/Recommendations from the Peer Review Section ISOC 19