GLAST Mission Large Area Telescope Project Project Status

advertisement
GLAST Mission - LAT Project
DOE/NASA Review, March 31, 2004
GLAST Mission
Large Area Telescope Project
Gamma-ray Large
Area Space
Telescope
Project Status
March 31, 2004
Lowell A. Klaisner, Project Manager
Stanford Linear Accelerator Center
klaisner@slac.stanford.edu
rev. 13
1
GLAST Mission - LAT Project
DOE/NASA Review, March 31, 2004
Introduction
• The transition to the first flight units has had the expected
challenges and impacts
– The LAT team is effectively stepping up to solve problems
• Producing flight hardware
– First tower integrated with the grid this fiscal year
– Tight, success-oriented schedule
• We will see risk to the instrument delivery date until we have
established a production rate history
– Plan has 9 weeks float to delivery for observatory
integration
• Overall project contingency is OK
– Project is 65% complete
– Contingency is 29% of cost to go
• Funding in the current fiscal year is an issue
– All funding for FY04 is allocated
rev. 13
2
GLAST Mission - LAT Project
DOE/NASA Review, March 31, 2004
GLAST MISSION SUMMARY
•Objective:
Larger field of view (FOV), higher sensitivity, and
broader energy detection range than any previously flown gamma-ray
mission.
•Mission Duration:
5 yrs (10 yr Goal)
•Orbit:
565 km Circular, 28.5° Inclination
•Launch Date:
February 2007
•Launch Vehicle:Delta 2920H-10
•Launch Site:
Kennedy Space Center
rev. 13
3
GLAST Mission - LAT Project
DOE/NASA Review, March 31, 2004
GLAST Observatory
LAT
GBM NaI Sensors
LAT Radiators
Solar Array
GBM BGO Sensors
+Z
Spacecraft
+Y
+X
rev. 13
4
GLAST Mission - LAT Project
DOE/NASA Review, March 31, 2004
Instrument Structure
Anti Coincidence Detector
16 Tracker Modules
Grid
16 Calorimeter Modules
Electronics Modules
Radiators
Mass
Power
rev. 13
3000 Kg
650 Watts
5
GLAST Mission - LAT Project
DOE/NASA Review, March 31, 2004
LAT Organization Chart
Collaboration Science Team
Principal Investigator
P. Michelson
Instrument Scientist
S. Ritz
EPO
L. Cominsky
Instrument Science Performance
S. Ritz
Senior Science Advisory Committee
N. Gehrels
Project Manager
L. Klaisner
D. Horn
J. Martin
D. Nicholson, Admin
Instrument Advisory Committee
S. Kahn
Deputy for Systems
D. Horn
Project Controls
T. Boysen
Design Integration &
Analysis
M. Nordby
Mission Assurance
D. Marsh
Electrical Integration
G. Haller
Manufacturing Eng.
J. Clinton
System Engineering
P. Hascall
Integration &Test
E. Bloom
TKR
R. Johnson
CAL
N. Johnson
rev. 13
ACD
D. Thompson
Mechanical
M. Campell
DAQ & FSW
G. Haller
ISOC
W. Craig (acting)
D. Lung, Deputy
SAS
R. Dubois
6
GLAST Mission - LAT Project
DOE/NASA Review, March 31, 2004
Partner Contributions to LAT
•

Tracker (TKR)
- Italy (ASI/INFN): provide Si-strip detectors &
assemble & test TKR modules
Tracker
- Japan: provide Si-strip detectors & oversee detector
production
- SU-SLAC & UCSC (USA): provide Si-strip detectors,
front-end electronics, cable plant, components
•
Calorimeter (CAL)
- IN2P3 (France): mechanical structure
- Sweden: CsI xtals & acceptance testing
- NRL (USA): Fabricate, assemble and test CAL
modules
•
Anticoincidence Detector (ACD)
•
- GSFC (USA) Fabricate, assemble and test the ACD
including micrometeoriod shield / thermal blanket
•
Data Acquisition System (DAQ)
- SU-SLAC & NRL (USA): Data acquisition hardware &
flight software
•
Mechanical/Thermal System
- SU-SLAC (USA): provide LAT Grid, thermal radiators,
heat pipes & ancillaries
LAT Integration & Test
- SU-SLAC (USA): assembly & test of LAT
•
- NRL (USA): instrument-level environmental tests
rev. 13
ACD
e+
e–
Grid
Calorimeter
All partners contributing to science analysis
preparations: software, science simulations
7
GLAST Mission - LAT Project
DOE/NASA Review, March 31, 2004
International agreements
•
•
MoAs between Stanford Univ-SLAC and:
– INFN, ASI, Italy
pending signature
– IN2P3, France; NRL
 revised & signed
– CEA/DSM/DAPNIA, France; NRL
 revised & signed
– Royal Inst. of Technology &
Stockholm Univ., Sweden; NRL
 signed
– Hiroshima Univ., ISAS & RIKEN, Japan;
UCSC/SCIPP
 signed
– NASA – Department Of Energy
 signed
Agency level agreements
– NASA – CNRS/IN2P3 Agreement
pending; draft exchanged
– NASA – CEA Agreement
 signed
– NASA – ASI Agreement
pending; draft exchanged
– NASA – Japan
draft sent to JAXA
– NASA – Sweden
draft in process
rev. 13
8
GLAST Mission - LAT Project
DOE/NASA Review, March 31, 2004
Budget, Cost, Funding, Performance
120
Actual Commitments
Actual Costs
Funding
Earned Budget
Planned Budget + Commitments
Planned Budget
$M
90
60
30
0
A M J J A S O N D J F M A M J J A S O N D J F MA M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F MA M J J
FY00
rev. 13
FY01
FY02
FY03
FY04
FY05
9
GLAST Mission - LAT Project
DOE/NASA Review, March 31, 2004
Cost and Schedule Variance
4.1 GLAST LAT PROJECT
4,000
2,000
0
1 month
-2,000
CV
-4,000
SV
-6,000
-8,000
MAR03
APR03
MAY03
JUN03
JUL03
AUG03
SEP03
OCT03
NOV03
DEC03
JAN04
FEB04
BCWS
49,452
52,780
55,210
57,854
60,114
62,777
66,081
69,052
69,801
73,433
77,394
81,916
BCWP
46,114
49,627
51,835
54,564
56,229
58,348
60,548
62,648
69,724
73,353
76,574
80,742
ACWP
45,435
48,344
51,125
54,402
57,264
59,429
61,990
63,894
67,721
71,081
74,989
78,460
CV
679
1,283
710
162
-1,035
-1,081
-1,443
-1,246
2,003
2,271
1,585
2,281
SV
-3,338
-3,152
-3,375
-3,290
-3,885
-4,428
-5,533
-6,404
-76
-80
-820
-1,175
rev. 13
10
GLAST Mission - LAT Project
DOE/NASA Review, March 31, 2004
Contingency Analysis (K$)
February 29, 2004
Baseline & Costs
Funding
Budget at complete
Work Performed
Cost to Go
Percent complete
Contingency
Contingency/ Cost to Go
rev. 13
$136,830
$124,383
$80,742
$43,641
65%
$12,447
29%
11
GLAST Mission - LAT Project
DOE/NASA Review, March 31, 2004
GLAST Mission Office Support in FY04
•
The GLAST mission management and the LAT project management identified areas were
additional manpower would help assure that the project meet its goals. The mission
office added funds to the project for this additional staff.
– Integration and Test Staff
$ 523K
– Tracker Staff
$ 738K
– Performance and Safety Assurance
$ 973K
– Flight Software Staff
$ 747K
Total
$2,981K
•
In addition, the mission office added funds to support the costs associated with the
following CCB actions:
– ACD Mechanical Materials and Support
$ 195K
– ACD Photomultiplier Anomaly Resolution
$ 299K
– ACD Base Electronics Assembly
$ 222K
– ISIS Scope Change
$ 94K
Total
$ 810K
Total funds added
$3,791K
•
Also, the Mission Office has provided technical support
– Thermal Engineering
– EMI/EMC Engineering
– Tracker and ACD Management
– Mechanical Analysis
rev. 13
12
GLAST Mission - LAT Project
DOE/NASA Review, March 31, 2004
History of the Budget at Complete Since Rebaseline
Budget at Complete
Delta Budget at Complete
130,000
14,000
125,000
12,000
10,000
120,000
8,000
K$
K$
115,000
6,000
110,000
4,000
105,000
2,000
Mar-04 (Projected)
Feb-04
Jan-04
Dec-03
Nov-03
Oct-03
-2,000
Sep-03
95,000
Aug-03
0
Jul-03
100,000
SepDecFebOct-03 Nov-03
Jan-04
03
03
04
Aug03
With
0
0
0
0
11,767
0
3,940
939
-241
Without
0
0
0
0
11,767
0
959
939
569
Month
Month
BAC
rev. 13
Mar04
(Proje
Jul-03
BAC w/o Manpower increase & MPS change
13
GLAST Mission - LAT Project
DOE/NASA Review, March 31, 2004
BAC projections to end of project
•
Contingency available
– 29% of cost to go
$12,447K
$140,000
Jul-05,
$135,535
$135,000
Allocation of project contingency since
rebaselining
– Between the end of July 03 and the end
of February 04
• Earned value
$24,513K
• Allocation of cont.
$ 4,879K
• Percentage
20%
Jul-05,
$133,111
Feb-04,
$124,383
$125,000
Jul-03,
$119,504
$120,000
$115,000
$110,000
Mar-03,
$107,482
$105,000
$100,000
May-02,
$99,973
BAC (20%)
BAC $697 per month
$95,000
•
Rate of Allocation over the last 7 months
– $697K per month
– Projection at this rate for the remaining
16 months $11,152K
•
Cost risk will decline as project matures
rev. 13
$90,000
M
ay
Au 02
gN 02
ov
-0
Fe 2
bM 03
ay
Au 03
gN 03
ov
-0
Fe 3
bM 04
ay
Au 04
gN 04
ov
-0
Fe 4
bM 05
ay
-0
5
•
Rebaseline
$130,000
14
GLAST Mission - LAT Project
DOE/NASA Review, March 31, 2004
FY04 Cash Flow
As of February Report
March Actions*
Transfer of MPS Tax
Current projection
At the
Costs
$111,024
$810
($801)
$111,033
end of FY04
Funding
Difference
$110,600
($424)
$1,310
$500
($801)
$0
$111,109
$76
* Mission office moved $500K of LAT funding from FY 05 to FY04
•
•
Planned costs March through September
– Project additional funds needed on FY04
• At $697K per month
• At 20 % of costs (recent experience)
• At 29% of costs (rate for the remainder)
$29,108K
$ 4,182K
$ 5,821K
$ 8,441K
Mitigation
– Move activities into FY05
– $5,000 Bridge available from Stanford University
– Mission office move NASA funding forward, if available
rev. 13
15
GLAST Mission - LAT Project
DOE/NASA Review, March 31, 2004
Potential Liens
Tracker Flight Nanoconnectors
Tracker Bias Circuit Redesign/Refab
Tracker MCMs and Source Inspection
DAQ Additional ACTEL Parts, FPGAs
DAQ Front End Simulator
DAQ Global Trigger/GASU Board Wiring
DAQ TEM Engineering Models
Lockheed Martin Phase II Increase
ACD ASIC delay
Additional MGSE items for I&T
Extend QA support for Tracker
Tracker GTRC v7 cycle
Calorimeter increased TVAC Testing
Japanese Funding
Total
rev. 13
FY04
$95
$66
$348
$253
$329
$260
$400
$656
$400
$132
$90
$160
$50
TBD
$3,239
16
GLAST Mission - LAT Project
DOE/NASA Review, March 31, 2004
LAT Schedule
TKR A
07/02/04
07/28/04
TKR 14
12/21/04
01/25/05
ACD
11/03/04
01/03/05
CAL A
07/09/04
CAL 14
12/2/04
DAQ
11/01/04
01/11/05
01/21/05
TEM/PS 14
10/05/04
01/07/05
X-LAT
08/12/04
08/12/04
FSW
Formal
Test
02/18/05
02/18/05
Install
Twrs 1-13
13 wks
Install
Tower 14
1 wk
Install Gbl
Items
6 wks
08/12/04
07/12/04
08/13/04
TEM/PS A
05/12/04
08/02/04
GRID
Assembly
06/11/04
07/22/04
Install
Twrs A&B
8 wks
2 Tower
CPT
3 wks
01/04/05
01/28/05
Feb. 2004
Data
FSW
Complete
12/13/04
12/15/04
01/10/05
02/04/05
02/23/05
03/18/05
05/11/05
06/07/05
System
Test
11 wks
10/31/05
10/31/05
Float
9 wks
Ship LAT
1 wk
Enviro
Test
15 wks
Float
4 wks
LAT
RFI
Observ.
Integration
Launch
02/07
5 Weeks
Dates
Nov, 03
Current
rev. 13
Pre-Test / CD-4
Review
07/14/05
Pre-Ship
Review
12/01/05
Color Code
Subsystem
I&T
Test
Mission
17
GLAST Mission - LAT Project
DOE/NASA Review, March 31, 2004
LAT Critical Path
Tracker Bottom
Tray Parts
4/9/04 (0)
Integrate ACD
3/15/05 (0)
Assemble Tracker
Towers A-12
11/26/04 (0)
Integrate Tkr/Cal
Towers 12-14
2/3/05 (0)
Integrate
Cross-LAT
Plate
3/18/05 (0)
System Test
6/6/05 (0)
Integrate LATWide Electronics
2/25/05 (0)
Ready for CD-4 and
Pre-Environmental
Test Review
6/7/05 (0)
Completion Dates (baseline variance)
rev. 13
18
GLAST Mission - LAT Project
DOE/NASA Review, March 31, 2004
Threats to Schedule
• Path to Integration and Test of Tower A
– Completing detailed documentation
– Getting fabrication contracts in place
– Anomaly in qualification testing
• Path to Integration and Test of the complete instrument
– Achieving planned production rates
– Execution of I&T plans
– Rapid response to anomalies
• Path to Environmental Test (CD-4)
– Anomalies requiring de-integration
– Rapid analysis of and response to anomalies
rev. 13
19
GLAST Mission - LAT Project
DOE/NASA Review, March 31, 2004
Level 1 and Level 2 Milestones
Milestone
Plan
Float
Level 1 Milestones – DOE/NASA Joint Oversight Group
DOE Critical Decision (CD) 0 Approval
CD-1 Approval
CD-2 Approval
CD-3 Approval
Flight Grid Complete
CD-4 Approval
June 25, 2001
July 23, 2002
November 8, 2002
August 31, 2003
September 15, 2004
March 15, 2006
June 25, 2001
Actual
July 23, 2002
Actual
November 8, 2002
Actual
August 31, 2003
Actual
July 22, 2004 8 weeks
June 7, 2005* 40 weeks
Level 2 Milestones – Federal Project Managers
Launch Balloon Flight
Instrument Preliminary Design Review
Instrument Critical Design Review
Start LAT Integration
Pre Environmental Test Review
Instrument Pre-Ship Review
August 1, 2001
January 8, 2002
May 16, 2003
August 24, 2004
July 14, 2005
December 1, 2005
August 1, 2001
January 8, 2002
May 16, 2003
August 2, 2004
June 7, 2005
October 1, 2005
Actual
Actual
Actual
3 weeks
5 weeks
9 weeks
* The CD-4 Review is planned for June 7, 2005 and the CD-4 Approval will occur after validation by DOE.
rev. 13
20
GLAST Mission - LAT Project
DOE/NASA Review, March 31, 2004
Technical Status
rev. 13
21
GLAST Mission - LAT Project
DOE/NASA Review, March 31, 2004
Closed Issues
• CDR/CD-3
– Loss of CNES funding
• Successfully transferred work to the US
• Funded at the rebaseline
– ASICs
• All flight ASICs are delivered
• No unresolved problems
– CAL-GRID joint
• Added “Menning Plates”
• Issue closed
– Cross LAT plate thermal connection
• Chose direct connection between DAQ boxes and plate
• Issue closed
• Rebaseline Review
– Tracker bottom tray design
• Design complete and parts in fabrication
rev. 13
22
GLAST Mission - LAT Project
DOE/NASA Review, March 31, 2004
Subsystem Status 1
•
•
•
•
Data Acquisition (SLAC)
– Out for bid for the flight Tower Electronics Modules
– Designs of all cards exist and prototypes in test
– Flight Software peer review 2/26/04, monthly software demonstrations
Tracker (UCSC, SLAC, INFN)
– Production planning readiness workshop held in Italy
– Thermal-Vacuum test of the engineering model complete
– Flight production underway
• Silicon ladders (30% complete), Multi Chip Modules, mid-trays,
and bottom tray components
– Need to complete the flight documentation and testing
Mechanical (SLAC)
– Flight GRID being machined
Thermal (SLAC)
– Flight heat pipes in fabrication (Lockheed Martin)
rev. 13
23
GLAST Mission - LAT Project
DOE/NASA Review, March 31, 2004
Subsystem Status 2
• Calorimeter (NRL, IN2P3)
– Flight production well underway
•
•
•
• 80% of CsI crystals in hand
• 25% of CDEs have been manufactured
• Flight ASICs (~12,000) have been tested
• All machined parts and 3 flight structures are complete
Anti-Coincidence Detector (GSFC)
– Flight scintillator detectors, phototube and electronic assemblies
and the structure are in production
Integration and Test (SLAC)
– Facilities are ready to begin flight integration in August
• Plan in place for support equipment and procurement started
– I&T Kickoff held in March
Instrument Science Operating Center (SLAC, SU, KIPEC, Collaboration)
– Planning underway
– Manager in place by end of Summer (Bill Craig, Acting)
•
Science Analysis Software (SLAC, Collaboration)
– Initial suite of software tools in place
– Highly successful Data Challenge 1
rev. 13
24
GLAST Mission - LAT Project
DOE/NASA Review, March 31, 2004
Summary
• No major outstanding technical issues
– Analysis and testing continues
• Producing flight hardware
– One tower integrated in the grid this fiscal year
– Tight, success-oriented schedule
• Overall project contingency is OK
– Project is 65% complete
– Contingency is 29% of cost to go
• Funding in the current fiscal year is an issue
– All funding for FY04 is allocated
• Continued strong support from NASA, DOE, and the Collaboration
• A strong, talented and committed staff
rev. 13
25
GLAST Mission - LAT Project
DOE/NASA Review, March 31, 2004
Backup Slides
rev. 13
26
GLAST Mission - LAT Project
DOE/NASA Review, March 31, 2004
Cost Performance Report
CAPW[3]
Item
(1)
Current Period
Actual
Budgeted Cost
Cost
Variance
Work
Work
Work
Scheduled Performed Performed Schedule Cost
(2)
(3)
(4)
(5)
(6)
Cumulative to Date
Actual
Budgeted Cost
Cost
Variance
Work
Work
Work
Scheduled Performed Performed Schedule Cost
(7)
(8)
(9)
(10)
(11)
At Completion
Latest
Revised
Budgeted Estimate Variance
(12)
(13)
(14)
4.1.1 INSTRUMENT MANAGEMENT
442
442
545
0
-103
11,020
11,020
11,071
0
-51
15,945
15,945
0
4.1.2 SYSTEM ENGINEERING
139
139
179
0
-40
4,532
4,532
4,426
0
106
6,601
6,601
0
4.1.4 TRACKER
516
405
278
-112
127
11,386
10,952
11,143
-434
-190
14,698
14,698
0
95
131
753
36
-622
14,632
14,171
13,531
-462
640
22,103
22,103
0
347
208
322
-139
-114
11,750
11,235
10,799
-515
435
14,022
14,022
0
2,072
1,915
757
-157
1,158
11,472
11,912
11,352
440
560
20,350
20,350
0
4.1.8 MECHANICAL SYSTEMS
395
422
290
27
132
7,625
7,436
7,335
-189
101
13,478
13,478
0
4.1.9 INTEGRATION & TEST
240
234
210
-6
25
3,125
3,111
3,037
-14
74
7,373
7,373
0
4.1.A PERFORMANCE AND SAFETY ASSURANCE
133
133
73
0
61
1,447
1,447
1,140
0
307
2,469
2,469
0
3
3
17
0
-14
272
272
295
0
-24
328
328
0
4.1.C EDUCATION AND PUBLIC OUTREACH
64
60
61
-4
-1
1,438
1,437
1,260
-2
177
2,448
2,448
0
4.1.D SCIENCE ANALYSIS SOFTWARE
71
71
-12
0
84
1,892
1,892
1,747
0
145
3,243
3,243
0
4.1.E SUBORBITAL FLIGHT TEST
4
4
0
0
4
1,325
1,325
1,325
0
0
1,325
1,325
0
Gen. and Admin.
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
124,383
124,383
0
12,447
12,447
0
136,830
136,830
0
4.1.5 CALORIMETER
4.1.6 ANTICOINCIDENCE DETECTOR
4.1.7 ELECTRONICS
4.1.B LAT INSTRUMENT SCIENCE OPERATIONS CENTER
Undist. Budget
Sub Total
4,522
4,167
3,471
-355
696
81,916
80,742
78,460
-1,175
2,281
Contingency
Total
4,522
rev. 13
4,167
3,471
-355
696
81,916
80,742
78,460
-1,175
2,281
27
GLAST Mission - LAT Project
DOE/NASA Review, March 31, 2004
Contingency Analysis
Project Estimate
(Escalated K$)
WBS Item
To Date
To Go
Cost*
Cost
Contingency
Total Cost
%
Total Cost
$
Plus Cont.
4.1.1 Instrument Management
$
11,020
$
4,925
$
15,945
16% $
780
$
16,725
4.1.2 Systems Engineering
$
4,532
$
2,069
$
6,601
14% $
280
$
6,881
4.1.4 Tracker
$ 10,952
$
3,746
$
14,698
18% $
665
$
15,363
4.1.5 Calorimeter
$
14,171
$
7,932
$
22,103
23% $
1,785
$
23,888
4.1.6 ACD
$
11,235
$
2,788
$
14,022
32% $
888
$
14,911
4.1.7 Electronics
$
11,912
$
8,438
$
20,350
20% $
1,707
$
22,057
4.1.8 Mechanical Systems
$
7,436
$
6,042
$
13,478
40% $
2,435
$
15,914
4.1.9 Instrument Integration & Test
$
3,111
$
4,263
$
7,373
34% $
1,438
$
8,811
4.1.A Performance & Safety Assurance
$
1,448
$
1,022
$
2,469
29% $
301
$
2,771
4.1.B Instrument Science Operations Center
$
272
$
56
$
328
12% $
7
$
334
4.1.C Education & Public Outreach
$
1,437
$
1,012
$
2,448
0% $
-
$
2,448
4.1.D Science Analysis Software
$
1,892
$
1,350
$
3,243
18% $
236
$
3,479
4.1.E Suborbital Flight Test**
$
1,325
$
-
$
1,325
0% $
-
$
1,325
Subtotal***
$ 80,742
$
43,641
$ 124,383
Unallocated Contingency
Total Project Estimate
25% $ 10,523
$
$ 80,742
$
43,641
$ 124,383
1,924
29% $ 12,447
$ 134,906
$
1,924
$ 136,830
*"To date cost" refers to cost through February 29, 2004. "To go cost" refers to cost after February 29, 2004.
**4.1.E Suborbital Flight Test is completed.
***Total contingency for project calculated against remaining costs at risk. Costs not at risk are costs to date and 4.1.C E/PO.
rev. 13
28
GLAST Mission - LAT Project
DOE/NASA Review, March 31, 2004
History of Cost Estimate
WBS
Item
4.1
4.1.1
4.1.2
4.1.4
4.1.5
4.1.6
4.1.7
4.1.8
4.1.9
4.1.A
4.1.B
4.1.C
4.1.D
4.1.E
LAT Budget at Completion
Instrument Management
System Engineering
Tracker
Calorimeter
Anticoincidence Detector
Electronics, Data Acquisition, Flight Software
Mechanical Systems
Integration & Test
Performance & Safety Assurance
Instrument Science Operations Center
Education & Public Outreach
Science Analysis Software
Suborbital Flight Test
Baseline
May-02
$99,973
11,602
4,647
9,877
17,348
10,280
15,738
11,850
6,654
2,180
2,552
2,598
3,328
1,321
LAT Project Baseline
CDR/CD-3 Rebaseline
Mar-03
Nov-03
$107,462
15,357
6,453
10,915
17,830
11,557
16,672
10,373
6,588
1,607
2,512
2,684
3,595
1,321
$119,504
15,502
6,588
13,595
22,648
13,870
18,733
13,384
6,384
1,486
326
2,448
3,220
1,321
Baseline Change
Current
Feb-04
May-02 to Feb-04
$124,383
15,945
6,601
14,698
22,103
14,022
20,350
13,478
7,373
2,469
328
2,448
3,243
1,325
$24,409
4,342
1,955
4,821
4,755
3,742
4,612
1,628
720
289
(2,224)
(150)
(86)
4
24.4%
37.4%
42.1%
48.8%
27.4%
36.4%
29.3%
13.7%
10.8%
13.3%
-87.2%
-5.8%
-2.6%
0.3%
4.1
Budget at Completion
NASA
DOE
Japan
$99,973
67,818
31,156
1,000
$107,462
72,577
33,499
1,387
$119,504
80,447
37,863
1,194
$124,383
84,771
38,418
1,194
$24,409
16,953
7,262
194
24.4%
25.0%
23.3%
19.4%
4.1
Contingency
NASA
DOE
Japan
Contingency as % of Cost to Go
$21,266
15,422
5,844
0
29%
$14,251
10,749
3,501
0
24%
$14,345
10,208
4,137
0
29%
$12,447
8,865
3,582
0
29%
($8,819)
(6,557)
(2,262)
0
-41.5%
-42.5%
-38.7%
0.0%
4.1
Total Estimated Cost
NASA
DOE
Japan
$121,240
83,240
37,000
1,000
$121,713
83,326
37,000
1,387
$133,849
90,655
42,000
1,194
$136,830
93,636
42,000
1,194
$15,590
10,396
5,000
194
12.9%
12.5%
13.5%
19.4%
rev. 13
29
GLAST Mission - LAT Project
DOE/NASA Review, March 31, 2004
Planned Staffing
250
150
100
Included in BAC
rev. 13
Contributed
30
Jul-05
Jun-05
May-05
Apr-05
Mar-05
Feb-05
Jan-05
Dec-04
Nov-04
Oct-04
Sep-04
Aug-04
Jul-04
Jun-04
May-04
0
Apr-04
50
Mar-04
FTEs
200