GLAST LAT Project LAT Mgr’s meeting July 17-18, 2003 LAT Planning Meeting Mechanical Systems Marc Campell 1 LAT Mgr’s meeting July 17-18, 2003 GLAST LAT Project X-LAT Thm I/F Des+EM MECH Work Flow Summary 12SEP03 16APR04 13FEB04 MGSE Des & Fab MGSE Des & Fab 30JAN04 12MAR04 30APR04 30APR04 TF Bond Qual 28NOV03 30JAN04 19DEC03 Dates TBR 05DEC03 Matl AV 12SEP03 MGSE Des & Fab 21NOV03 CAL-Grid I/F Des+EM 12SEP03 GB Stress Analysis 15AUG03 2 GLAST LAT Project LAT Mgr’s meeting July 17-18, 2003 Interdependencies with other subsystems, instrument office, and/or project office. • • • • • • • • • • CSE – Analysis support for design release S/C - need tool to drill S/C I/F on Grid & flexures for test? TRK – need matched tooling to drill TRK-Grid I/F ACD – need BEA to match drill BEA LM – X-LAT plates needed for GBA testing prior to delivery to I&T – Radiators needed for LAT environmental tests PO – LM ITAR hardware in B33 ELEC – TCS design, prototype fab & EGSE design & fab for Radiator Thermal balance test ELEC needs – Release of E-box enclosure designs – X-LAT plate thermal performance I&T - Schedule space in B33 for MECH assy & test I&T needs - Grid to start integration – X-LAT design drives accessibility to E-boxes – EMI skirt & Grid provisions for ground cooling – Jeff Wang responsible for thermal analysis of ground cooling 3 GLAST LAT Project LAT Mgr’s meeting July 17-18, 2003 Flight hardware procurements – schedule for existing and plans for remaining • Long-Lead Procurements – Aluminum Billets due 8/26 (what is the flaw size requirement) – Heat pipe extrusions (LM - placed) – Solid State thermostats have been replaced with standard bimetallic thermostats • Major Upcoming Procurements Near-Term (< 4 months) – Lockheed Martin Phase 2 – placed – Grid Assembly - 7/30 place contract (quotes due 7/18) – Flight Hardware for Thermal Control System - started • Minor Upcoming Procurements – GSE – 6 designs est Nov 03 – Grid Assembly Fixtures, Test Equipment est Dec 03 – Thermal-cycle Test Fixtures est Jan 04 4 GLAST LAT Project LAT Mgr’s meeting July 17-18, 2003 Flight Hardware Manufacturing Plans • • • • • 3 Assy plans Drafts 3 Assy Procedures Not Started ~12 Process Specs (some used by LAT) Not Started 2 Test Plans Not Started 2 Test Procedures Not Started • Does not include LM or Grid Vendor plans & procedures 5 GLAST LAT Project LAT Mgr’s meeting July 17-18, 2003 Engineering Model Testing Closure • CAL-Grid Joint Testing – No further tests planned for Shear plates – CAL bolt preload vs. torque statistical sampling • X-LAT thermal joint testing – Coupon level thermal tests of candidates – Mock up E-box stack-up with heaters on sidewalls to simulate electronics heat source and flight like installation procedures to identify potential process problems (who’s responsible? ELEC?) – Perform Random Vibe and Thermal Vacuum tests if required • 1x4 Grid – Static load test (FEM verification) – CAL Shear plate installation/removal validation – CAL installation demo (TRK cable-EMI skirt clearances) – Purge gas system demo? (what is reqmt for flow rate?) 6 GLAST LAT Project LAT Mgr’s meeting July 17-18, 2003 Engineering Model Testing Closure (cont) • Grid top flange heat pipe bonding process qualification – Validate tooling – Demo process control • Demonstrate Radiator installation process – 6 wet RTV joints in vertical orientation & restricted access – Demo with Radiator +Z and +X up – Complete within pot life limits (bonded & torqued) – Verify bond line integrity (uniform thickness & % voids) • Demonstrate Radiator removal process – Separate 6 joints with restricted access – No damage or distortions of heat pipes – Verify material can be cleaned up & surface prepared again for another bond 7 GLAST LAT Project LAT Mgr’s meeting July 17-18, 2003 Open Flight Design Issues 1. 2. 3. 4. Finalize CAL-Grid interface design Finalize X-LAT to E-box design Close the loop on Grid-ELEC interface (grounding & EMI) Delete Radiator level EMI test requirement? (perform EM test w/ D. Nelson) 5. Mechanically install Radiators for LAT EMI test? (EMI test plan out for review) 6. Grid-TRK interface define Grid datums & TRK tooling interface 7. Define GBA Static Load test requirements & plans 8. S/C Flexures for GBA static load test? 9. GBA Thermal cycle vs Thermal Vacuum test approval 10. RFA on adding a U heat pipe to X-LAT plate in case of XLHP failure 11. Other RFA’s closure 12. Examine removing X-LAT plates from GBA static load and thermal cycle tests to beak schedule dependency 8 GLAST LAT Project LAT Mgr’s meeting July 17-18, 2003 Concerns & Risks 1. Will we be ready to cut Grid chips on Sep 12? a. Detailed stress analyses complete b. Design mods incorporated c. Successful MRR 2. Manpower (Engr & Techs) availability 3. Details of how, where & who for Grid Box Assembly work (Larry Wai) 4. Finalizing CAL & X-LAT designs a. EM testing & flight grid fab in parallel 5. Cost &availability of EGSE for Radiator Thermal Balance Test 6. Adequate support for LM efforts 9