Instrument Operations Center (IOC) and Science Analysis Software (SAS)

advertisement
GLAST LAT Project
DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
Instrument Operations Center (IOC)
and
Science Analysis Software (SAS)
Scott Williams
Hanson Experimental Physics Laboratory (HEPL)
Stanford University
Scott.Williams@stanford.edu
R.Dubois
Stanford Linear Accelerator Center
Stanford University
Richard@slac.stanford.edu
IOC – S.Williams SAS - R.Dubois
1
GLAST LAT Project
DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
IOC and Science Analysis Software
Outline
 IOC & SAS functions
 Organization
 Short and Longer Term Work Plans
 Cost Summary
 Issues
IOC – S.Williams SAS - R.Dubois
2
GLAST LAT Project
DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
Mission Operations Architecture
* From the GLAST Operations
Concept Document
IOC – S.Williams SAS - R.Dubois
LAT
Instrument
Operations
Center
3
GLAST LAT Project
DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
GLAST Mission Operations Functions
LAT Instrument Operations & Science Data Processing
Instrument Operations
S. Williams, SU-HEPL
Space and
Ground
Segments
S/C, LAT HSK
and GBM Data
Commands
Raw LAT Data
S/C Data
Instrument
Procedures
& Uploads
Miss ion Operations Center (MOC)
Spacecraft & GBM Level 0 Processing
Spacecraft Health & Safety
Instrument Safety
Commanding
Alert Data Handling
Ground Station & TDRSS Scheduling
Acquisition Data Generation
• LAT Level 0 Processing
• Instrument Health &
Safety Monitoring
• Instrument Commanding
• Test & Calibration Data
Acquisition
• Validating & Maintaining
Flight Software
• Alert Processing
Level 0 &
S/C Data
Instrument
Procedures
& Uploads
Schedules
S/C data for
archiving
Summarized from
Ground Systems
Functional Allocation
Team Study
IOC – S.Williams SAS - R.Dubois
Science Analysis Software
R. Dubois, SU-SLAC
Level 0
Science &
Hsk Data
Performance &
Calibration Data
• Science Data Processing
• Optimizing Analysis &
Processing Algorithms
• Instrument Calibration
• Instrument Performance
Assessment
• Data Distribution
• Analysis Software
• Mirror Sites
GBM Intrument Operations Center
Instrument Operations & Monitoring
Instrument Calibration
Operations Software Production & Maintenance
Data Analysis Software Development
Low Level Standard Product Production
Flight Data Verification
Instrument Team Data Processing
Instrument
Schedules
Level 0,
Level 1,
Higher
Level
Products,
IOC Data
Products
Level 0, Higher Level Products, IOC Data
Products, Instrument Schedules
Science Support Center (SSC)
Higher Level Data Processing
Science Data Distribution
Data Archiving
Observation Scheduling
Target of Opportunity Selection
Guest Observer Support
4
GLAST LAT Project
DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
IOC Formulation Schedule
IOC – S.Williams SAS - R.Dubois
5
GLAST LAT Project
DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
Science Data Processing
– Receive Level 0 data from
IOC
– Automatically process Level
0 data to Level 1
– Facilitate LAT monitoring and
updates of calibrations
– Feed back high level
monitoring info to IOC
– Generate Monte Carlo for
instrument simulation,
algorithm development etc
– Allow for data reprocessing
– Generate high level data
products
– Develop analysis tools and
platforms
– Deliver data products and
algorithms to SSC
– Protect via archive all data, at
SLAC and HEASARC
~ 3GB of data arrives per day
IOC – S.Williams SAS - R.Dubois
6
GLAST LAT Project
DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
The Critical Areas
•
Simulation/reconstruction
software
– Instrument simulation and
reconstruction
– PSF, Aeff, background
rejection
•
Supports detailed performance
tracking; Mock Data
Challenges; input to Science
Supports instrument design
and science studies
•
Infrastructure
– Code framework
– Code/release management
– Documentation
Level 1 Data Processing
– Production data and MC
processing
– Near real-time feedback to
IOC
•
Science Analysis tools
– High level utilities
Supports extraction of Science
from the data
Good practices and the glue
that holds the software
together
– Event database technology
Extraction of science/sharing with SSC
IOC – S.Williams SAS - R.Dubois
7
GLAST LAT Project
DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
Timeline
MDC
CY 2001
2002
2003
2004
2005
2006
Balloon
GlastSim/G4
Event Display
Release Manage
Performance Tuning,
Tracking
Data Production Facility
……….
near real-time monitoring
Calibrations
Event DB
Technology & Design
Science Tools, Analysis Platforms
Polishing & maintenance + post-launch panic
IOC – S.Williams SAS - R.Dubois
8
GLAST LAT Project
DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
Group Communications
use cvs for distributed code development
Repository at SLAC
use web conferencing tools for meetings
Weekly General, Core & CAL; soon TKR
Used for impromptu discussions
use instant messenger tool for quicky discussions
Software Weeks every
4 months
Core working meeting
between Software Wks
IOC – S.Williams SAS - R.Dubois
Use MS NetMeeting for point-topoint discussions
and Windows remote debugging via
desktop sharing
software team is integrated
subsystem folks are matrixed between subsystem
and software group
part of same development process as other
components of software
9
GLAST LAT Project
DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
IOC WBS Organization
GLAST IPO
SU-SLAC
Instrument Operations
Center
WBS 4.1.B
S. WIlliams, SU-HEPL
Miss ion & Ops
Planning
WBS 4.1.B.3
S. Williams, SU-HEPL
1 Ops Concept Dev
2 I&T Planning
3 Mission Ops
Planning
IOC Management
WBS 4.1.B.1
S. WIlliams, SU-HEPL
Performance
As surance
WBS 4.1.B.2
TBD1, SU-HEPL
1 Project Admin
2 Meetings & Reviews
3 Logistics
4 Travel
5 Project Support
1 Quality Assurance
2 Verification
LAT Operations
Facility
WBS 4.1.B.4
TBD2, SU-HEPL
1 System Conceptual
Design
2 Data Acq S/W Dev
3 Operations S/W Dev
4 Command &
Telemetry Dev
5 IOC System Dev
LOF Test
WBS 4.1.B.5
TBD1, SU-HEPL
1 Test Planning
2 Test Dev
3 Verification Test
4 Interface Tests
5 Travel
EGSE Integrated Product Team
S. Williams, IOC, SU-HEPL
D. Nelson, TKR, SU-SLAC
E. Grove, CAL, NRL
B. Schaeffer, ACD, GSFC
M. Lovellette, E&DA, NRL
J.J. Russell, FSW, SU-SLAC
M. Nordby, I&T, SU_SLAC
IOC – S.Williams SAS - R.Dubois
Calibration Support
WBS 4.1.B.6
D. Lauben, SU-HEPL
1 Calibration Support
LAT I&T Support
WBS 4.1.B.7
TBD1, SU-HEPL
1 Qual Unit Test
Support
2 Flight Unit Test
Support
3 Travel
MSI&T Support
WBS 4.1.B.8
TBD1, SU-HEPL
MO&DA
WBS 4.1.B.9
S. Williams, SU-HEPL
1 Observatory Test
Support
2 Ground Systems
Test
3 Training Sims
4 Launch & Early
Orbit Support
5 Travel
1 Science Operations
2 LAT Operations
3 IOC Systems
4 LAT Simulator
5 Engineering Support
Operations Integrated Product Team
S. Williams, IOC, SU-HEPL
R. Dubois, SAS, SU-SLAC
D. Thompson, ACD, GSFC
D. Bertsch, ACD, GSFC
S. Digel, SAS, GSFC
C. Meetre, SSC, GSFC
E. Grove, CAL, NRL
M. Lovellette, E&DA, NRL
D. Lauben, IOC, SU-HEPL
10
GLAST LAT Project
DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
SAS WBS Organization
Instrument Project Office
R.Dubois
Manager
4.1.D
SLAC
T.Burnett
Sim/Recon
4.1.D.2
UW
T.Burnett
Architect
UW
E.do Couto e Silva
Calibrations
4.1.D.E
SLAC
S.Digel, J.Norris
Science Tools
4.1.D.B
GSFC
H.Kelly
Analysis Tools
4.1.D.8
GSFC
K.Young
Infrastructure
4.1.D.D
SLAC
Performance
Metrics
in conjunction with
S.Ritz GSFC
H.Kelly
ACD
4.1.D.2.4
GSFC
J.Bogart
Geometry
4.1.D.1
SLAC, Italy
Trigger Simulation
4.1.D.4
E.Grove, A.Djannatti-Atai
CAL
4.1.D.2.5
NRL, France
Y.Fukazawa
Sources
4.1.D.3
Hiroshima, Stanford
Background Rejection
4.1.D.5
T.Usher
TKR
4.1.D.2.6
SLAC, UCSC, Italy
J.Bogart
Constants
4.1.D.7
SLAC
Performance Tune & Mon
4.1.D.6
IOC – S.Williams SAS - R.Dubois
11
GLAST LAT Project
DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
LAT Simulation & Recon Software –
Flight Proposal Baseline
100 MeV g
TKR
2, 25, 40 GeV e-
CAL
0.1, 7 GeV g
Well-developed photon recon, background rejection algorithms
- part of the project effort since ’93.
IOC – S.Williams SAS - R.Dubois
15 GeV proton
12
GLAST LAT Project
DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
Status
• IOC is in formulation phase through FY’01
• Improving Simulation and Reconstruction
• Addressed infrastructure issues in 2000/2001 – support for the
long run
• Providing balloon flight and PDR preparation support through
summer ’01
• Continuing with requirements and specifications for science
tools and calibrations, with first prototypes this year
IOC – S.Williams SAS - R.Dubois
13
GLAST LAT Project
DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
SAS Issues
•
Heavy load on team to support both the balloon flight and PDR prep
– Need additional 2-3 FTE for core and DPF work
– Toby Burnett has pending NSF request
• Extremely important to our effort that it succeed!!
– European & Japanese collaborators have committed to supporting
the core effort
•
Want major Sim/Recon release by late 2001 to let us shift focus to
Calibrations and analysis issues
•
Need to get started on Data Processing Facility
– Balloon & PDR support as early prototyping opportunities
– Mock Data Challenge in mid 2002
•
Technology for event, photon & exposure databases and techniques for
indexing the photons (time, spatial tessellations)
– Studies underway to evaluate technologies
IOC – S.Williams SAS - R.Dubois
14
GLAST LAT Project
DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
IOC Milestones
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Instrument Operations Center (IOC) Requirements Review
04/18/01
LAT Instrument PDR
08/06/01
IOC PDR
08/22/01
LAT Instrument CDR
08/05/02
IOC S/W Release 1
07/28/03
IOC CDR (TBR)
08/04/03
IOC S/W Release 2
12/18/03
Calibration Unit Beam Test Complete
02/05/04
LAT Ops Facility Validation & Verification Complete
06/21/04
LAT TV Test Complete
08/26/04
Ground Systems Compatibility Test (TBR)
11/21/04
Mission Sequence Test (TBR)
03/21/05
End-to-end Test (TBR)
06/21/05
Launch
09/05
LAT Checkout Complete
+ 30 days (TBR)
IOC – S.Williams SAS - R.Dubois
15
GLAST LAT Project
DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
4.1.B LAT Instrument Operations Center
A c tivity
ID
A c tivity
D e scr i ption
Or ig
Re m
E a r ly
D ur
D ur
S tar t
E a r ly
Finish
FY 00
FY 01
FY 02
FY 03
FY 04
FY 05
FY 06
Gamm a Ray Large Area Space Telescope
4.1 .B LA T INS TR U ME N T O P E R A TI ON S CE N TE R
S u btota l
1,2 41
10 /02/0 0
09 /30/0 5
1,2 41
10 /02/0 0
09 /30/0 5
72 7
10 /03/0 2
09 /07/0 5
1,1 99
11 /29/0 0
09 /28/0 5
1,0 74
06 /07/0 1
09 /30/0 5
48 0
07 /24/0 2
06 /29/0 4
90 9
10 /01/0 1
06 /01/0 5
38 5
06 /12/0 3
12 /24/0 4
23 9
10 /15/0 4
09 /30/0 5
+ 4 .1.B .1 M A N A G E ME N T
+ 4 .1.B .2 P E R F O R MA N C E A S S U R A N C E
+ 4 .1.B .3 M IS S IO N & O P E R A TI O N S P L A N N IN G
+ 4 .1.B .4 IN S TR U M E N T O P E R A TIO N S C E N TE R
+ 4 .1.B .5 IO C T E S T
+ 4 .1.B .6 L A T C A LI B R A TIO N
+ 4 .1.B .7 L A T IN TE G R A TIO N & TE S T
+ 4 .1.B .8 M IS S IO N S Y S TE MS I N TE G R A TIO N & TE S T
DRAFT
IOC – S.Williams SAS - R.Dubois
16
GLAST LAT Project
DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
Interim IOC Cost Estimate*
(Escalated K$)
4.1.B
Instrument
Operations Center
HEPL
(NASA)
Total
FY00
FY01
FY02
FY03
FY04
FY05
Total
24.4
24.0
224.4
349.1
850.0
630.0
2102.0
24.4
24.0
224.4
349.1
850.0
630.0
2102.0
*DOE/NASA funding.
IOC – S.Williams SAS - R.Dubois
17
GLAST LAT Project
DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
Science Analysis Software Milestones
•
•
•
•
•
•
•
•
•
Science Analysis Software (SAS) Requirements Review
Instrument Simulation/Event Recon Release (to support PDR);
Management & Verification in place
LAT Instrument PDR
Science Analysis Software PDR
Complete Mock Data Challenge – CDR run-up
LAT Instrument CDR
Science Analysis Software CDR
Implement production version of Data Production Facility
End-to-end testing, final Mock Data Challenge complete
IOC – S.Williams SAS - R.Dubois
04/25/01
06/01/01
08/06/01
09/05/01
07/15/02
08/05/02
09/04/02
06/01/04
06/01/05
18
GLAST LAT Project
DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
4.1.D Science Analysis Software
A c tivity
ID
A c tivity
D e scr i ption
Or ig
Re m
E a r ly
D ur
D ur
S tar t
E a r ly
Finish
FY 00
FY 01
FY 02
FY 03
FY 04
FY 05
FY 06
Gamm a Ray Large Area Space Telescope
4.1 .D S C IE N C E A N A LY S I S S O FTW A R E
S u btota l
1,0 43
04 /03/0 0
06 /14/0 4
27 0
04 /03/0 0
05 /02/0 1
18 6
11 /27/0 0
08 /27/0 1
31 8
09 /25/0 0
01 /10/0 2
60
09 /25/0 0
12 /19/0 0
60
02 /01/0 1
04 /26/0 1
58
05 /01/0 1
07 /23/0 1
39
02 /01/0 1
03 /28/0 1
99
09 /25/0 0
02 /22/0 1
40
01 /10/0 1
03 /08/0 1
25
10 /09/0 0
11 /10/0 0
14 6
09 /25/0 0
04 /30/0 1
72 9
09 /25/0 0
09 /03/0 3
15 1
04 /02/0 1
11 /01/0 1
11 2
10 /02/0 0
03 /20/0 1
41 2
03 /01/0 1
10 /21/0 2
92 1
09 /25/0 0
06 /14/0 4
+D
+ 4 .1.D .1 G E O M E T R Y
+ 4 .1.D .2 G LA S T S IMU L A TI O N
+ 4 .1.D .3 S O U R C E S
+ 4 .1.D .4 T R IG G E R S IM U LA TIO N
+ 4 .1.D .5 B A C K G R O U N D R E J E C T IO N
+ 4 .1.D .6 P S F/E FFE C TI V E A R E A M O N I TO R IN G A N D O P TIM
+ 4 .1.D .7 S TA T IC C O N S TA N TS H A N D L IN G
+ 4 .1.D .8 A N A L Y S IS TO O L S
+ 4 .1.D .9 T E S T B E A M 9 9
+ 4 .1.D .A B A LL O O N FL IG H T
+ 4 .1.D .B S C IE N C E S O FTW A R E
+ 4 .1.D .C D A TA P R O D U C T IO N FA C ILIT Y
+ 4 .1.D .D C O D E & R E L E A S E M A N A G E ME N T
+ 4 .1.D .E C A LI B R A TIO N
+ 4 .1.D .F M A N A G E ME N T
DRAFT
IOC – S.Williams SAS - R.Dubois
19
GLAST LAT Project
DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
Interim Science Analysis Software Cost Estimate*
(Escalated K$)
4.1.D
Science Analysis
Software
FY00
FY01
FY02
FY03
FY04
FY05
Total
GSFC
(NASA)
128.6
191.3
329.5
355.7
241.3
186.5
1433.0
HEPL
(NASA)
46.5
81.5
294.6
300.7
281.4
280.7
1285.4
175.1
272.8
624.2
656.4
522.7
467.2
2718.4
Total
*DOE/NASA funding.
IOC – S.Williams SAS - R.Dubois
20
GLAST LAT Project
DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
Summary
•
Simulation and reconstruction are in excellent shape for this stage of
the project
– Needed infrastructure improvements for long-term support and
development are well underway
– Will be a challenge to support the balloon and PDR
•
Plan for required science analysis calibration and high level tools
– In progress
•
Workplan in place – in process of loading into PMCS
•
Requirements, initial QA/QC this summer
•
Mock Data Challenge in mid 2002
– Prototype IOC, Processing Facility and Event DB
IOC – S.Williams SAS - R.Dubois
21
Download