GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 Integration, Test, and Calibration Martin Nordby Stanford Linear Accelerator Center Stanford University Integration and Test Manager nordby@slac.stanford.edu Martin Nordby 1 GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 Integration, Test, and Calibration Outline I & T Work Breakdown and organization I & T activity flow Qualification & Verification testing Calibration planning Integration planning I & T scheduling and milestones I & T budget summary Issues Martin Nordby 2 GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 Integration and Test Subsystem Work Breakdown • 4.1.9.1 I & T Management – Coordinate I & T planning – Develop LAT I & T plan, to ensure flow of verification test activities • 4.1.9.2 Reliability and Quality Assurance – Collect subsystem verification test results – Manage LAT verification test assurance activities • 4.1.9.3 I & T Preparation – Prepare LAT I & T facilities – Develop calibration equipment • 4.1.9.4 Calibration Unit I & T – Prepare for and integrate Calibration flight modules – Prepare for and test Cal. Unit in electron, photon, and hadron beams • 4.1.9.6 Flight LAT I&T – Prepare for integration of flight LAT; fabricate and test all mechanical GSE – Mechanically integrate flight LAT – Plan for and execute environmental verification testing • 4.1.9.7 Mission I&T Support – Support planning and execution of Observatory I&T Martin Nordby 3 GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 Integration, Test, and Calibration Organization LAT IPO WBS 4.1 LAT Project Manager IPM: Bill Althouse LAT Integration & Test WBS 4.1.9.1/.2 I&T I&T Mgr: Martin Nordby I&T Preparation WBS 4.1.9.3 I&T Martin Nordby Calibration Unit I&T WBS 4.1.9.4 I&T TBD I&T Planning I&T Cal. Unit Integration I&T Calibration Development I&T Cal. Elec. GSE Elec. Facility Preparation I&T Calibration Operations IOC Calibration Planning I.S., I.T.M. Calibration Analysis Analysis Software I&T Integration and Test I.S. Instrument Scientist ITM Instrument Technical Manager Elec Electronics and DAQ Mech Mechanical Systems IOC Instrument Operations Center TKR Tracker CAL Calorimeter ACD Anticoincidence Detector Martin Nordby LAT I&T WBS 4.1.9.6 I&T Martin Nordby Integration WBS 4.1.9.6.1 Mechanical Integration I&T Verification Testing WBS 4.1.9.6.2/.3 Env. Test Execution I&T Mission I&T Support WBS 4.1.9.7 I&T Martin Nordby Calibration WBS 4.1.9.6.4 Cal. Mech GSE I&T Mechanical GSE I&T Thermal Testing Mech. Cal. Elec GSE Elec/IOC Electrical Integration Elec. Structural Testing Mech. Calibration Operations IOC Electrical GSE Elec. EMI/EMC Testing Elec. I&T Support TKR, CAL, ACD Performance Testing Elec./IOC Mechanical I&T I&T Electrical I&T Elec. Operations, Test Ops IOC Flight Software Elec. 4 GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 Integration, Test, and Calibration Activities • I & T “subsystem” is focal point of LAT integration activities – – • I & T team plans and manages activities TKR, CAL, and ACD subsystem teams provide support for integration Total effort involves: – – – – – I & T Subsystem • LAT integration planning and management • Mechanical integration and GSE development • Environmental test execution • Calibration test equipment development Mechanical Systems • Environmental test planning • LAT qualification testing Electronics and Data Acquisition • LAT electrical integration • Performance test planning and execution • Flight software verification testing • Electrical GSE development, including calibration DAQ system IOC • LAT performance test planning • GSE operations and support during LAT I & T Science Analysis Software • Calibration analysis software development Martin Nordby 5 GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 Integration, Test, and Calibration Activity Flow Assemble, test subsystem EM modules TKR, CAL, ACD Develop, fab mechanical interface gauges Mech Assemble, integrate, test subsystem Qual Modules TKR, CAL Develop, test EM2 Tower Electronics Modules (TEM’s) Elec Prototype calibration equipment I&T, Sci Test calibration equipment and plans I&T, Sci, Elec Develop calibration analysis software Develop LAT calibration equipment and plans I&T, Sci, Elec Assemble, integrate, test subsystem Flt Modules TKR, CAL, ACD SAS Beam-Test Calibration Unit I&T, Sci, (IOC) Integrate Calibration Unit I&T, Sci, Elec Upgrade EM2 TEM’s into E-GSE for subsystem I&T Elec Integrate LAT Develop, test Qual TEM, SIU for Cal. Unit E-GSE Elec GSE Ground support equip. M-GSE Mechanical GSE E-GSE Electrical GSE Cal. Calibration Unit EM Engineering Model Subsysteml I&T activities Calibration activities Electronics activities Mechanical Systems activities IOC pre-operations activities Science Analysis Software Martin Nordby Develop, fab structural, thermal Qual units Mech I&T, Elec Environmental and performance test LAT I&T, Elec, Mech, (IOC) Develop, test Flt TEM’s, SIU’s Elec Env. Test Therm-Mech Qual Unit (struc, thermal) Mech Develop, fab M-GSE for structural, thermal env. testing Mech Upgrade M-GSE and plans for flight LAT env. testing Mech Integrate and test GLAST Observatory I&T, IOC, (Mech), (Elec) Develop Operations Software and E-GSE IOC 6 GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 Qualification and Verification Test Planning • Validation and Qualification – Incrementally validating models and qualifying processes – We are in-process on this plan • Prototypes: electrical/mechanical prototypes being built and tested now, to validate analysis and develop fab. processes • Engineering Models: CAL, TKR, ACD, Elec and Mech plan highfidelity models which use processes planned for flight units • Qual Units: actual flight qualification will be done bottom-up • Verification and Acceptance Testing – Subsystem performance verified as part of the assembly process • Provides immediate feedback for production line process control • With world-wide production effort, this clarifies responsibilities • Minimizes schedule and shipping risk if re-work is needed – Test as you build • Uses modularity to our advantage, reducing risk of high-level failure/non-compliance Martin Nordby 7 GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 Subsystem Test Flow TKR: Vibe, T-C EM Tray Qual TKR: Vibe, T-V EM Module Qual TKR: Vibe, Ac, T-V Qual Tray PFQ Tracker TKR: Vibe, T-V Q1 Qual Module PFQ TKR: Vibe, T-C All Flight Trays Acc CAL: Vibe, T-V EM Module Qual TKR: Q1 Module to Cal. Unit I&T TKR: Vibe, T-V F1-16 Modules Acc CAL: Vibe, T-V Q1 Qual Module PFQ TKR: F3-16 to LAT I&T CAL: Q1 Module to Cal. Unit I&T CAL: Vibe, T-C F1-16 Modules Acc Calorimeter TKR: F1-2 to Cal. Unit I&T CAL: F1-2 to LAT I&T CAL: F3-16 to LAT I&T Anticoincidence Detector ACD: Vibe, Ac, T-C EM ACD Qual Vibe Ac T-C T-V EMI Random vibrate/sine sweep Acoustic Thermal-cycle at 1 atmosphere Thermal-vacuum cycle test Electro-magnetic interference test Engineering model tests Qualification unit tests Martin Nordby Flight unit/spare tests ACD: Vibe, T-V ACD/Shield TM PFQ Acc PFQ Qual Proof. EM TM MM GSE Acceptance test level Proto-flight qual test level Prototype qual test level Load test at proof level Engineering Model Thermal model Mass model Ground support equip. ACD: ACD TM to Grid Qual Test ACD: Vibe, Ac, T-V ACD/Shield Acc ACD: ACD to LAT I&T 8 GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 LAT System Test Flow ACD: ACD TM from ACD build Mechanical Systems Mech: T-V EM Grid + Radiators Qual Mech: Vibe, Ac, Flt Radiators PFQ Mech: T-V Flt Radiators PFQ Mech: T-B Qual Grid,Flt Rads,TM PFQ Mech: Flt Rad’s to Obs. I&T Mech: Vibe Qual Grid + MM PFQ Mech: Proof test Flt Grid Proof Elec: EM2 TEM to TKR, CAL Electronics Elec: Perf, EMI EM1 TEM, SIU Perf Vibe Ac T-C T-V EMI Elec: Perf, EMI EM2 Test Bed, Flt SW Perf Random vibrate/sine sweep Acoustic Thermal-cycle at 1 atmosphere Thermal-vacuum cycle test Electro-magnetic interference test Engineering model tests Qualification unit tests Flight unit/spare tests Martin Nordby Mech: Flt Grid to LAT I&T Acc PFQ Qual Proof. EM TM MM GSE Elec: Qual TEM, SIU Cal. Unit I&T Elec: Vibe, T-V, EMI Qual TEM’s, SIU’s PFQ Acceptance test level Proto-flight qual test level Prototype qual test level Load test at proof level Engineering Model Thermal model Mass model Ground support equip. Elec: Qual SIU to Obs. I&T Elec: Vibe, T-V, EMI Flt TEM’s, SIU’s PFQ Elec: Flt TEM’s, to CAL fab Elec: Flt SIU’s to LAT I&T 9 GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 LAT I&T Verification Test Flow TKR: Q1 from TKR fab TKR: F1-2 from TKR fab CAL: Q1 from CAL fab CAL: F1-2 from CAL fab Elec: Qual TEM, SIU from Elec I&T: Beam test Cal. Unit Cal CAL: F3-16 from CAL fab Acc PFQ Qual Proof. EM TM MM GSE Acceptance test level Proto-flight qual test level Prototype qual test level Load test at proof level Engineering Model Thermal model Mass model Ground support equip. Flight LAT I&T: T-V, EMI LAT Acc I&T: LAT Calibration I&T: Vibe/Ac LAT Cal ACD: ACD to LAT I&T Mech: Flt Rad’s from Mech Elec: Flt SIU’s to LAT I&T Elec: Qual SIU for elec GSE Martin Nordby Random vibrate/sine sweep Acoustic Thermal-cycle at 1 atmosphere Thermal-vacuum cycle test Electro-magnetic interference test Engineering model tests Qualification unit tests Flight unit/spare tests TKR/CAL: F1,2 from Cal. Unit Mech: Flt Grid from Mech TKR: F3-16 from TKR fab Vibe Ac T-C T-V EMI Calibration Unit Acc Obs: Vibe/Ac Observatory Obs: T-V Observatory Acc Obs: EMI Observatory Acc Acc 10 GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 Tracker Qual Trays Qual Module (TKR #1) Trays Modules (TKR #2-18) M M M M Proof Proof Calorimeter Qual Module (CAL #1) Modules (CAL #2-18) M M Proof Anti-Coincidence Detector ACD Flight Unit M M M M M M Mechanical Systems Grid Structure Heat Pipes Radiators Qual. Grid Assembly Flight Grid Assembly Grid Ass'y w/ Radiators M M M M Proof M M Proof M Proof Proof Proof Acc PFQ PFQ Acc Acc PFQ Acc PFQ Acc PFQ PFQ PFQ PFQ PFQ PFQ PFQ, MM PFQ, MM M M M LAT Flight Unit GLAST Observatory M M M M M M M Ana: MM: TM: Martin Nordby PFQ M Acc Analysis Test, using Mass Models Test, using Thermal Models PFQ PFQ Acc PFQ Acc PFQ Acc M PFQ PFQ M 16 1 1 Pr es Ana Proof PFQ 1 34 2 PFQ, TM 1 1 1 4 1 PFQ Acc: PFQ: Qual: Proof: 304 16 1 PFQ PFQ PFQ, TM Acc su re nt Acc 10 1 28+20 1 Ana Ana PFQ Acc Acc Ali gn me EM C PFQ Acc PFQ M M M M PFQ PFQ Fli gh tQ t'y Fli gh tS pa res cu um Va Th erm a l- Th erm al Ba Cy cli ng lan ce ho ck ls ha nic a Me c c us ti Ac o Th erm al Vib e do m Ra n sw ee p Sin e rop ert ie s Ma s s, sP C.G . ng th Ma s M M M M PFQ, TM Electronic Systems TEM, SIU, ACD Units Cable Harness Rev date: 26 Jan 01 tr e St ruc S Fit / Dim Ch e ck Environmental Test Matrix Acc Acceptance-level testing Protoflight Qual-level testing Prototype Qual-level testing Test to Proof levels PFQ PFQ Acc Acc Acc M: S: Y: M M Ana 20 Ana 1 1 3 Measure or Inspect Test sample of total Yes, this is performed 11 GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 Calorimeter ASIC's EEE Parts Front-End Boards CsI Logs Qual Module (CAL #1) Modules (CAL #2-18) Ana: MM: TM: Analysis Test, using Mass Models Test, using Thermal Models Anti-Coincidence Detector ASIC's EEE Parts Front-End Boards ACD Tiles, Fibers, PMT's ACD Flight Unit Acc: PFQ: Qual: Proof: Acceptance-level testing Protoflight Qual-level testing Prototype Qual-level testing Test to Proof levels Mechanical Systems EEE Parts Grid Assembly M: S: Y: Measure or Inspect Test on sample of total Yes, this is performed Electronic Systems ASIC's EEE Parts TEM, SIU, ACD Boards TEM, SIU, ACD Units Y Y Acc Proof Y Y M, S M, S M M M M Proof, S Proof, S Acc Proof, S Proof, S Proof M pa r es Fli gh tS Fli gh tQ t'y ng es ti lT ec ia Sp 2016+ 76+30 1152+518 288+64 Y 588 9216 2304 10 1 294 15 Y 3072 384+ 8 192+24 Y 38+10 2 Acc Acc Acc Acc Y Y 64 1536 1 15 Acc Y 290 54 Acc Acc Acc 145 1 27 Y Acc Y Acc Y Light output and uniformity EMC testing on components 2 Proof, S M Y Y 16128 Acc Acc Acc Acc Acc Proof Y Y Leakage current, bad channels Leakage current, bad channels M M M Y Y ur n-I n Fu nc tio na l Ca lib rat ion m. Di Hi Te m ua l, Vis Proof, S Proof, S Y pB E on / SE ree Sc rts Pa Tracker ASIC's EEE Parts Front-End Boards Silicon Detectors Silicon Ladders Qual Trays Qual Module (TKR #1) Trays Modules (TKR #2-18) Ra dia ti nin g Performance Test Matrix Proof Proof, S Proof, S Proof PFQ Acc SC, GSE fit checks 1 Board-level EMC testing 62 20 10 3 Rev date: 26 Jan 01 Martin Nordby LAT Calibration Unit LAT Flight Unit Acc Acc Y Y 1 1 12 GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 Calibration Planning • “Calibration” means – Determining the fundamental response of detector elements – Determining the performance of the instrument • Characterizing variations over range of operations environments • Characterizing variations over time • Calibration plan flows from the requirements: ground and on-orbit – integrated approach. • Ground-based calibration effort is tightly coupled to the I&T plan: – sea-level muons and sources for detector elements – sea-level muons for LAT testing during environmental testing – beam tests in photon, electron, and hadron beams • I&T and Calibration Planning Committee formed to: – – – – develop systematic flow of requirements to detailed tests develop Calibration Plan and I&T Plan evaluate personnel needs, baseline schedule and budget assess the facilities, equipment, and resources needed Martin Nordby 13 GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 Integration Planning Activities • LAT integration planning – Planning for subsystem integration has been included in development of interfaces and LAT design integration – Started developing concepts for integration GSE • LAT integration facilities – New clean room facilities being built at SLAC for GLAST – Facilities include I&T infrastructure • Clean room with high bay • Storage for flight hardware • Environmental chambers for thermal-cycle testing • Observatory integration support – LAT team has been involved in investigating options for Observatory integrating – LAT and Observatory require combined GSE and coordinated plans Martin Nordby Concept of LAT Integration Frame 14 GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 4.1.9 I & T Schedule A c tivity A c tivity ID D e scr i ption Or ig Re m E a r ly D ur D ur S tar t E a r ly Finish FY 00 FY 01 FY 02 FY 03 FY 04 FY 05 FY 06 Gamm a Ray Large Area Space Telescope 4.1 .9 IN S TR U M E N T IN TE G R A TION AN D TE S TIN G S u btota l 1,2 41 10 /02/0 0 09 /30/0 5 1,2 40 10 /02/0 0 09 /29/0 5 71 7 10 /02/0 0 08 /22/0 3 1,0 70 10 /02/0 0 01 /28/0 5 57 0 10 /15/0 1 02 /06/0 4 98 3 10 /15/0 1 09 /29/0 5 98 4 10 /15/0 1 09 /30/0 5 + 4 .1.9. 1 IN TE G R A TIO N & T E S T MA N A G E M E N T + 4 .1.9. 2 R E LIA B IL ITY A N D Q U A LIT Y A S S U R A N C E + 4 .1.9. 3 I & T P R E P A R A TI O N + 4 .1.9. 4 C A LIB R A TIO N U N IT I & T + 4 .1.9. 6 FL IG H T LA T I & T + 4 .1.9. 7 M IS S I O N IN TE G R A TIO N & TE S TIN G DRAFT • Currently developing I&T schedule o o Scoping work Identifying key I&T milestones Establishing linkages to other subsystems Identifying key hand-offs with other subsystems Martin Nordby 15 GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 I&T Milestones • Verification Test Plan Review • TKR & CAL Modules A & B Ready for Integration into Calibration Unit • TKR & CAL Modules 1 & 2 Ready for Integration into Calibration Unit • Calibration Unit Beam Test Complete • Flight Grid Ready for Integration • Flight TKR & CAL Modules 3 & 4 Ready for Integration 06/15/01 • • • • • • • 12/24/03 01/26/04 01/26/04 04/09/04 10/07/04 12/22/04 9/05 Flight TKR & CAL Modules 15 & 16 Ready for Integration Flight TKR & CAL Modules 1 & 2 Ready for Integration Flight ACD Ready for Integration LAT Instrument Ready for Environmental Testing LAT Instrument Pre- ship Review LAT Instrument Ready for Integration with Observatory GLAST Launch Martin Nordby 05/15/03 08/01/03 01/17/04 10/01/03 10/01/03 16 GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 Interim Integration & Test Cost Estimate* 4.1.9 Integration & Test FY00 FY01 FY02 FY03 FY04 FY05 Total SLAC (DOE) 0 222.0 618.4 792.3 262.4 272.9 2168.0 HEPL (NASA) 0 0 0 802.1 1486.1 202.9 2491.2 0 222.0 618.4 1594.4 1748.5 475.9 4659.2 Total Escalated k$ *DOE/NASA funding • Interim estimate based on Proposal cost estimate • Currently developing and checking I&T cost estimate Martin Nordby 17 GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 Issues • Integration schedule is tight – Integration plans are for just-in-time delivery of subsystem modules – Early and incremental verification testing assures high probability of performance when integrating the LAT – Subsystem delivery milestones are visible at the project level to ensure close tracking of progress leading up to LAT integration • LAT and Observatory verification activities require close coordination – We have been working on coordinated test plans with mission office – Expect to advance this work during the upcoming accommodation study Martin Nordby 18